Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 1 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
TABLE OF CONTENTS
1. INTRODUCTION .................................................................................................................. 4
2. INFLUENT PARAMETERS................................................................................................. 4
2.1 TEMPERATURE (T) ........................................................................................................... 4
2.1.1 Stays differential temperature (TS) ............................................................................. 5
2.1.2 Structure uniform temperature variation (TU)............................................................ 5
2.1.3 Deck temperature gradient (TG) ................................................................................. 5
2.1.4 Pylon temperature gradient (PG) ............................................................................... 5
2.2 YOUNG MODULUS (E) ...................................................................................................... 6
2.3 DEAD LOADS (DL) ........................................................................................................... 7
2.4 CONSTRUCTION LOADS (CL) ............................................................................................ 7
3. CALCULATION METHODOLOGY .................................................................................. 8
3.1 CONVENTIONS .................................................................................................................. 8
3.2 LIMITATIONS .................................................................................................................... 9
3.3 APPROACH ....................................................................................................................... 9
3.3.1 Precamber ................................................................................................................... 9
3.3.2 Profiles ...................................................................................................................... 10
3.3.3 Correction precamber ............................................................................................... 11
4. PROCEDURES .................................................................................................................... 15
4.1 CONTROL POINTS ........................................................................................................... 15
4.2 CONTROL STAGES .......................................................................................................... 17
4.3 MEASURES ..................................................................................................................... 18
4.4 CORRECTION OF ACTUAL PROFILE .................................................................................. 18
4.4.1 Correction of temperature......................................................................................... 19
4.4.2 Correction of loads ................................................................................................... 20
4.5 IDENTIFICATION OF DEVIATION FACTORS ....................................................................... 20
4.5.1 Factors treated by stay tensions ................................................................................ 20
4.5.2 Factors treated by additional precamber .................................................................. 22
5. SIMULATION RESULTS AT NEUTRAL CONDITIONS ............................................. 27
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 2 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 3 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
1. INTRODUCTION
The purpose of this report is to present the procedures to be followed during
construction of the cable-stayed bridge across Chambal River on Kota bypass on NH-
76 to control the geometry of its main span.
This document also presents the data which the procedures refer to. However, please
note that the procedures require data measured on site, therefore the precamber
presented below should not be applied without following the whole procedures.
The current version of the report provides the updated deck altitudes during
construction (please refer to appendix 3) as per the updated construction planning and
sequences.
The construction planning concerning the lateral spans and the central span has been
revised in order to suit with the real advancement of work on site (please refer to
appendix 9). It implies a revision of the deck altitudes to be followed during the
remaining construction sequences.
At the same time, the schedule of construction for each segment has been revised in
comparison to the one presented in “Design Basis” report (please refer to Design Basis
report, part 5.4 §7). Please refer to appendix 8 for the detail of the updated construction
sequence for main span segments.
This report has been updated reflecting the updated construction planning and the deck
levels and stay forces of already constructed segments measured on site by Hyundai,
in order to provide more precise geometry control for the remaining main span
construction.
Finally, the segment stitching casting sequence has been updated based on the updated
construction planning and the information provided by Hyundai. (Appendix 11).
2. INFLUENT PARAMETERS
Parameters that may have an influence on the bridge geometry during construction are
listed below with their effects on the bridge profile. The temporary loads applied on
the bridge are theoretical. They have to be combined as per actual loads at the time of
survey to assess the actual bridge geometry.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 4 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 5 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
In the issues 1 and 2, a constant average temperature on the whole year had been
entered during the entire construction and at service stage. In the current issue of
geometry control report, in order to be more accurate in the computation of creep
effects according to FIB-CEB law, we have been using an average temperature for the
summer and another one for the winter. According to the updated construction
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 6 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 7 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
3. CALCULATION METHODOLOGY
3.1 Conventions
Precambers are calculated with the tangent convention:
d N = Z N − [Z N −1 + (Z N −1 − Z N − 2 )]
Where:
• dn: precamber of segment N with tangent convention
• Zn: altitude of benchmark at end of segment N
An upward precamber is therefore positive and a downward precamber is negative.
The kink between segments [N-2] and [N-1] will be taken in account by considering
the difference of top altitude N and tangent continuation of benchmarks [N-3] and [N-
2] at [N-1] position :
kink altitude N −1 = Z N −1 − [Z N − 2 + (Z N − 2 − Z N −3 )]
Neutral conditions of temperature are taken as a uniform temperature in the whole
structure (including stays) equal to 23.75°C.
Neutral conditions of loads are taken as the design dead loads and no additional loads
on the deck during construction, except the travelling form.
Except if given in this report, material characteristics are taken as the design
characteristics.
The reference state of the bridge geometry is the state of the bridge when 50% of long-
term losses have occurred. This occurs theoretically 1200 days (4 years) after the end
of construction.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 8 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
3.2 Limitations
Tolerance points are defined below to ensure that the bridge geometry corresponds to
theoretical geometry.
Kink tolerance is defined as the maximum kink altitude (as described above)
Kink tolerance δ max = 3.5cm
Please note that limitations only refer to the geometry of the bridge at reference state.
3.3 Approach
3.3.1 Precamber
According to the Design Basis report, the bridge has to be built with a precamber such
that the effective profile after 50% of long-term losses matches the theoretical profile.
A staged analysis including time-dependent effects, such as creep and shrinkage, has
been performed to determine this precamber.
Precamber
= precamber of f orm traveler (upwards)
+ precamber of stage analysis
Please note that the camber given by the project to create the vertical radius in the
central part of the bridge is included in the precamber of stage analysis. This camber
will be referred to as the project camber.
During construction, the actual profile of the bridge will regularly be drawn and
compared to the theoretical profile for the same stage to control the bridge geometry.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 9 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Unpredicted deviations between actual and expected profiles can be corrected with
two different methods presented below. The choice between these methods is based
on the cause of the deviations:
• Modify final tensions in stays
• Add a third term of precamber in the next segments (e.g. if deviations are
caused by an unpredicted displacement of travelling form during casting) –
this term will be called the correction precamber
For lateral spans, precamber of the stage analysis is downwards (negative) for the span
between P3 and P4 (given in appendix): maximum difference between casting altitude
and theoretical altitude is 22mm. Precamber of the stage analysis is nil for other spans.
For the central span, the precambers of stage analysis are too small to be considered
during construction. They can therefore be considered as null. However, correction
precambers may have to be introduced and should not be forgotten. Calculation of
these correction precambers is detailed further.
3.3.2 Profiles
Geometry control is to be realized by comparing an actual longitudinal profile with
the longitudinal profile expected for the current construction stage.
The project profile (or theoretical profile) is the target profile at reference state as
described in the design basis.
Expected profiles are given by a construction simulation of the bridge under precise
conditions of temperature, loads and with the design characteristics of materials. Such
data define what will be called the neutral conditions.
Actual profiles of the main bridge are given by survey campaigns realized for each
control stage.
However these profiles are related to different conditions of temperature and loads and
should be corrected before being compared to the expected profile. Such a correction
consists in applying effects of temperature or load variations to the actual profile,
simulating a return to neutral conditions of temperature and loads.
Corrected actual profiles are obtained from actual profiles, from which the reversible
actual effects have been removed. They are therefore with neutral conditions of
temperature and loads and can be directly compared with the expected profiles.
The same type of corrections can be made if the actual Young modulus of deck
concrete is in fact different from its theoretical value (effects of creep).
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 10 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Longitudinal actual profiles should only be compared to expected profiles once they
are corrected and correspond to neutral conditions of temperature and loads.
The following approach is given to explain on which method the geometry correction
procedure is based. However the whole approach won’t have to be considered on site
and only the procedure explained further should be followed.
Corrected actual
profile
Actual profile
Differences of altitude ε i are assumed to respect the altitude tolerance. Thus the
evolution of deflections until reference state is assumed the same as in the simulation
(additional 2nd order effects can be neglected).
The difference between actual altitude of benchmark N at reference state and its
theoretical altitude can therefore be taken as ε n .
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 11 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
An actual profile at reference sate can thus be defined as the project profile to which
are added the vertical deviations ε i :
Z n = Z th ,n + ε n
Where:
• Z n : actual altitude at reference state
• Z th ,n : project altitude
Expected profile
Zth,n-1
Zth,n
εn-1
εn
Project profile
Zn-1
Zn
Actual profile
at reference state
Precambers should not create kinks higher than the tolerance δ max when the bridge is
in its reference state (i.e. after 50% of long term losses).
The kink at this state is generated only by the correction precamber and the project
kink (when the main bridge has a vertical radius, in its central part).
Correction precamber should therefore be defined while considering the actual
altitudes of benchmarks at reference state.
If the expected profile cannot be reached while casting the next segment with a kink
β lower than kink tolerance δ max (i.e. β > δ max ), correction will have to be spread
over several segments.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 12 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Z n −1
Z n −1
Zn 2 Z n − Z n −1
ε n−1 Zn ε n−1
εn Z th ,n +1 εn β
β Z th,n +1
Positive precamber Negative precamber
2 Z n − Z n −1
Figure 4: Reaching the expected profile within one segment
Let i be the number of segments within the expected profile is reached. It can be
reached by adding a precamber δ max towards the expected profile for the (i-1) first
segments and an adequate precamber for the last segment to reach the expected
altitude.
According to the scheme above, since the precambers are calculated with the tangent
convention, the following formula can be written:
(1) Z n + ( Z n − Z n −1 ) × i + δ × (i + (i − 1) + ... + 3 + 2) + β = Z th, n+i
(i − 1)(i + 2)
⇔ ( Z th,n − Z th, n−1 ) × i + (ε n − ε n −1 ) × i + δ × + β = Z th ,n +i − ( Z th,n + ε n )
2
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 13 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Where:
• δ = δ max if the precamber is upwards
• δ = −δ max if the precamber is downwards
• β is the last precamber to reach target level
When the expected altitude is reached, the absolute value of precamber γ of segment
[n+i+1] necessary to match project profile may be too high (see scheme above). The
precamber may then have to be spread over more segments to respect the kink
tolerance.
The same calculation approach applies when determining the number of segments to
reach theoretical profile and longitudinal slope on segment [n+i+j]:
Corrected actual
profile
Z n +i −1
ε n +i −1
Z n +i −1
ε n+ i Z th ,n + i + j −1 Z th, n + i + j
Project profile β
Z th,n −1 Z th,n Z th ,n +i γ δ max
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 14 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
4. PROCEDURES
The procedures presented below should be followed during construction of the main
span. Their purpose is to detect any variation of the cantilever from its expected profile
as soon as possible. Such a method would allow more accurate values of parameters
presented above and prevent eventual unexpected deviations from happening several
times.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 15 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Benchmarks
Two rows of 3 benchmarks are to be created for each segment of the main span, both
rows being parallel and at a 3.3m-distance one from another and at a 10cm-distance
from the closest segment end. In a row, the benchmarks are to be separated by a 12m-
distance, the central benchmark being at the deck longitudinal axis.
The central benchmark of front row (on the side of the next segment) is used for
control of longitudinal profiles and deflections of the cantilevers.
The side benchmarks of front row are used to control the torsion of the deck.
The back row of benchmark (on the side of the previously cast segment) is used to
control kinks and position the travelling form for casting of next segment: use of back
and front rows of the last cast segment is necessary to set the precamber with the
tangent convention.
The tables of piers P4 and P5 are considered as 7m-long segments. There are 2 rows
of 3 benchmarks on each table, both rows being at a 6.8m-distance one from each
other and at a 10cm-distance from end of table.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 16 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
When geometry control has to be done before a segment is cast, control points on the
travelling form can be used. In such cases, at least 3 control points will be chosen on
the form.
These points will have to be accessible from top of segment after pouring and the
longitudinal axis has to be a symmetry axis for these points.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 17 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
For verification of the travelling form stiffness, surveys should be done after moving
travelling form and after pouring. They may be done at least while weight of segments
is variable.
Verification of the deck geometry should be made after prestressing or after tensioning
stays (when applicable).
Surveys should be done between 6am and 7am to minimize the effects of temperature
on the structure.
4.3 Measures
The following parameters shall be measured when necessary to use topographical
surveys with greater precision:
• Deck loads, including equipments and storage of materials on the deck.
Values and repartition of these loads may be reported for every survey.
• Deck temperature. Concrete temperature in different parts of the deck (lower
slab, webs and upper slab) should be measured to determine the deck uniform
temperature and temperature gradient for every survey.
• Pylon temperature should also be measured on both side of the pylon
(Chittorgarh and Shivpuri sides) to determine the pylon uniform temperature
and temperature gradient for every survey since the first stay is tensioned:
measures may begin at end of casting cycle of segment 10.
• Stay temperature should be measured.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 18 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Where :
• d T,i is the deflection caused by a current temperature change
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 19 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
If the loads are higher at end of cantilever than on the rest of the deck (except for the
travelling form), effects of loads will be divided in a distributed load (as seen above)
and a load localised at end of cantilever.
The deflections caused by a localised load are obtained with the same method than for
distributed loads but with the corresponding simulation results.
Where :
• d CL, i is the deflection caused by an additional load (localised or distributed)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 20 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 21 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
When verification is done for casting cycle of segment N, the deflections will be
considered at benchmark [N-1], since deflections of benchmark N are also depending
on the travelling form stiffness.
If the deflection difference of benchmark [N-1] is higher than 1cm, the Young
modulus of concrete is worth being reconsidered.
Actual value of Young modulus can be estimated graphically from simulation results.
For example, when casting 30th segment of cantilever on Chittorgarh side, if the
deflection observed at end of 29th segment when moving the travelling form forward
is -80mm:
E design E design
= 1.15 and E deck = .
E deck 1.15
E_deck variation
Edesign/E_deck
200,0
Deflection
100,0
0,0
-80mm
-100,0
-200,0
Figure 10: Example for graphical estimation of actual Young modulus of concrete
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 22 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Once the travelling form stiffness is defined, the new value should be used for all the
next segments of the cantilever.
After casting of every segment, the corrected actual profile at the end of casting cycle
(i.e. after prestressing activities or stay tensioning) should be compared with the
theoretical profile at same step.
The differences between these profiles of the altitude of the 2 last benchmarks should
be reported. If the difference is higher than 1cm for at least one benchmark, precamber
of next segment may have to be modified.
The difference of altitude between theoretical and corrected actual profiles should be
corrected within the next segments with a correction precamber.
The precamber of next segment should then be modified using the procedure presented
below.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 23 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
• Z n = Z th,n + ε n
(2Z th , n − Z th , n −1 ) + ( 2ε n − ε n −1 ) = Z th ,n +1 Precamber = 0
Z n −1
Z n −1
Zn 2 Z n − Z n −1
ε n−1 Zn ε n−1
εn Z th ,n +1 εn
Z th,n +1
Positive precamber Negative precamber
2 Z n − Z n −1
Figure 11: Sign of precamber for next segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 24 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
If
(2Z th , n − Z th ,n −1 ) + ( 2ε n − ε n −1 ) − Z th ,n +1 ≤ δ max Precamber on at least 1 segment
If
(2Z th , n − Z th ,n −1 ) + ( 2ε n − ε n −1 ) − Z th ,n +1 > δ max Precamber on several segments
3) Choice of precamber:
If the additional precamber has to be spread over more than one segment, the
correction precamber for the next segment will be:
Correction precamber = tolerance deviation ( δ ) – project camber:
• (
Upward correction: β = +δ max − Z th ,n +1 − 2 Z th ,n + Z th , n −1 )
• (
Downward correction: β = −δ max − Z th ,n +1 − 2 Z th , n + Z th ,n −1 )
In this case, go directly to step 4.
If the additional precamber can be introduced only on the next segment [n+1], it should
be checked that the following segment [n+2] can be cast on the expected profile (with
correct longitudinal slope) without introducing a kink higher than kink tolerance δ max
.
If not, the precamber should be spread over several segments.
( )
If 2 Z th , n +1 − Z th ,n + 2 − Z th ,n − ε n ≤ δ max Precamber on 1 segment only
( )
If 2 Z th ,n +1 − Z th ,n + 2 − Z th ,n − ε n > δ max Precamber on several segments
If the precamber can be introduced on only one segment, the correction precamber
will be:
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 25 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
β = −(2ε n − ε n−1 )
If the precamber has to be spread over several segments, the number j of segments and
the precamber of next segment should be calculated by using equation (3) and with
the following procedure:
a) j = 2
( j − 1)( j + 2)
b) If δ max × + δ max < Z n − Z th ,n + j − ( Z th ,n + j − Z th ,n + j +1 ) × j
2
then increase j by 1 and redo step 3.b). If not go to step 3.c).
c) The precamber should be spread over at least (j+1) segments. The altitude of end
of next segment should be:
j ( j − 1)
Z n +1 = Z th ,n + j + ( Z th ,n + j − Z th ,n + j +1 ) × ( j − 1) + δ ×
2
if 0 <
β (Z − 3Z th,n + 2Zth,n−1 − 3ε n + 2ε n−1 − δ ) ,
< 1 then β = th ,n+ 2
−δ 2
ε
where δ = δ max * n
εn
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 26 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
• Correction precamber β
They are given for neutral conditions of temperature and loads. They have been
calculated with CEB-FIP shrinkage and creep laws (creep effects being multiplied by
a 0.30 ratio), with a travelling form weight of 82.5t.
Expected profiles are also given for key steps at the end of construction.
Please note that the actual profile of the main bridge should match the project profile
only after 50% of long-term losses have occurred. The altitude of the key segment at
opening of the bridge will therefore not be the project altitude.
Differences of altitude of the key segment between actual and project values at end of
construction are the following:
• After casting of key segment: -401mm
• After tensioning continuity tendons: -301mm
• When superimposed dead loads are in place: -748mm
• After final tensioning of stays (opening of the bridge): +56mm
• After 50% of long-term losses (1200 days after opening): 0mm
• After 100 years: -122mm
Please note that casting cycle corresponds to pouring and prestressing of the segment
(including stressing of stay cables, when applicable).
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 27 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
The angle between first lift of pylon and pylon pier segment shall be as shown in
design drawings.
Each lift of pylon shall be constructed parallel to the previous lift. No precamber is
planned for pylon construction.
Regular surveys of pylon shall be done during pylon construction to control pylon
geometry, preferably after casting each lift. A survey of the pylon shall preferably be
done before installing first stay cable on the pylon.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 28 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
6.2 Recommendations
Surveys should be done at a time when thermal gradient effects in pylon are negligible,
(estimated between 6am and 7am), and when wind effects are negligible.
Following measures can be checked by the Contractor:
- Angle between pylon mean line and pier segment top level:
o Angle of pylon mean line is defined by coordinates of survey points at top
and bottom of pylon,
o Mean angle of pier segment along longitudinal axis is defined by
coordinate of benchmarks on pylon pier segment.
- Curvature of pylon mean line along its height: defined by coordinates of survey
points at 3 consecutive levels of pylon
Provided that thermal gradient is not observed in pylon and before stay cables are
installed, Contractor shall control the following:
- Angle between pylon mean line (defined by coordinates of survey points at top
and bottom of pylon) and pier segment shall be as given in design drawings, within
construction tolerance (i.e. a difference of pylon inclination below 1/200 is
acceptable),
- Pylon shall be straight (lifts are parallel to each other), within the allowable
construction tolerance (i.e. curvature radius of the pylon mean line shall be above
16 000m).
Provided that thermal gradient is not observed in pylon and after first stay cable is
installed, Contractor shall control the following:
- Portion of pylon above stay cable anchorages shall be straight (lifts are parallel to
each other), within the allowable construction tolerance (i.e. curvature radius of
the pylon mean line shall be above 16 000m).
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 29 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
N≤ 9 YES N≥ 5 YES
? ?
NO NO
Verif ication of
travelling f orm stif f ness
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 30 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
NO
N≥ 5
?
YES
Correct prof ile Correct prof ile Correct profile Correct prof ile
before moving af ter moving after after
travelling form travelling form pouring prestressing
NO
Diff erence
>ε?
YES
Modif ication of
precambers ?
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 31 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Dif f erence of
def lections Theoretical
step 2 deflection of
“pouring” travelling f orm
f or last benchmark
YES
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 32 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Temperature Load
difference difference
Deflections Deflections
Actual profile caused by caused by
(to be corrected) temperature load
difference difference
Corrected
actual profile
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 33 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Formwork
corrections
X (m) of formwork
Lateral Bridges
(mm)
0 0
P3 1.75 -2
3.5 -4
5.25 -6
7 -7
10.5 -11
12.25 -12
14 -14
17.5 -17
19.25 -18
21 -19
24.5 -21
26.25 -21
28 -22
31.5 -22
35 -22
38.5 -22
42 -20
45.5 -18
49 -13
52.5 -7
56 0
59.5 0
P4 63
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 34 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
59.5
56
49
42
Corrections to add in formwork - lateral spans
35
X (m)
28
Série3
21
14
7
P3 Axis
0
0
-5
-10
-15
-20
-25
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 35 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 36 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 37 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
*Step: SIDL Implementation step 41 corresponds to the last step of stay cables’
tensioning after SIDL implementation
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 38 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Table for checking of deck altitudes at end of casting cycle – Chittorgarh side
Nota: The deck altitudes are given at the front row bench mark
The deck altitudes are updated from Segment 38
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 39 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 40 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 41 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 42 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 43 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Table for checking of deck altitudes at end of casting cycle – Shivpuri side
Nota: The deck altitudes are given at the front row bench mark
The deck altitudes are updated from Segment 36’
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 44 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 45 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 46 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 47 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS –
GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Page 48 / 169
Issue 7
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
0,2
Deflection (mm)
-0,2
-0,4
-0,6
-0,8
518
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 1st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
1
0,5
Deflection (mm)
-0,5
-1
-1,5
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100% Chittorgarh - Prestressing - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 1st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 49 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
1
0,5
Deflection (mm)
-0,5
-1
-1,5
-2
514,5
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 2nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
2
1
Deflection (mm)
-1
-2
-3
-4
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 2nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 50 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
2
1,5
1
Deflection (mm)
0,5
0
-0,5
-1
-1,5
-2
-2,5
-3
511
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 3rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
3
2
1
Deflection (mm)
0
-1
-2
-3
-4
-5
-6
-7
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 3rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 51 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
3
2
1
Deflection (mm)
0
-1
-2
-3
-4
-5
-6
507,5
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 4th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
4
2
0
Deflection (mm)
-2
-4
-6
-8
-10
-12
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 4th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 52 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
4
2
Deflection (mm)
-2
-4
-6
-8
504
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 5th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
6
4
2
Deflection (mm)
0
-2
-4
-6
-8
-10
-12
-14
-16
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 5th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 53 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
4
2
0
Deflection (mm)
-2
-4
-6
-8
-10
-12
500,5
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 6th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 6th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 54 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
6
4
2
Deflection (mm)
0
-2
-4
-6
-8
-10
-12
-14
-16
497
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 7th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
10
5
0
Deflection (mm)
-5
-10
-15
-20
-25
-30
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 7th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 55 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
10
5
Deflection (mm)
-5
-10
-15
-20
493,5
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 8th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
15
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
-30
-35
175
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 8th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 56 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
490 525
x (m)
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 9th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Pouring - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 9th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 57 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
30
20
Deflection (mm) 10
0
-10
-20
-30
-40
486,5 521,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 10th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
30
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 10th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 58 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-5
Deflection (mm)
-10
-15
-20
-25
-30
483 518
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 11th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-5
-10
Deflection (mm)
-15
-20
-25
-30
-35
-40
-45
-50
175 210
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 11th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 59 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
40
30
Deflection (mm) 20
10
0
-10
-20
-30
-40
-50
479,5 514,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 12th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
40
20
Deflection (mm)
-20
-40
-60
-80
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 12th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 60 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-5
-10
Deflection (mm)
-15
-20
-25
-30
-35
-40
476 511
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 13th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-10
Deflection (mm)
-20
-30
-40
-50
-60
175 210
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 13th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 61 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
60
40
Deflection (mm)
20
-20
-40
-60
472,5 507,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 14th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 14th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 62 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-5
-10
Deflection (mm)
-15
-20
-25
-30
-35
-40
-45
-50
469 504
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 15th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-10
Deflection (mm)
-20
-30
-40
-50
-60
-70
175 210
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 15th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 63 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
465,5 500,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 16th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 16th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 64 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-10
Deflection (mm)
-20
-30
-40
-50
-60
-70
462 497
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 17th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
175 210
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 17th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 65 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
458,5 493,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 18th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
100
80
60
Deflection (mm)
40
20
0
-20
-40
-60
-80
-100
-120
175 210
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 18th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 66 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
455 490 525
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 19th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
-90
175 210 245
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 19th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 67 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
100
80
Deflection (mm) 60
40
20
0
-20
-40
-60
-80
-100
451,5 486,5 521,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 20th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
100
50
Deflection (mm)
-50
-100
-150
175 210 245
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 20th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 68 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
-90
448 483 518
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 21st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
-90
-100
175 210 245
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 21st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 69 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
100
50
Deflection (mm)
0
-50
-100
-150
444,5 479,5 514,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 22nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
-50
-100
-150
175 210 245
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 22nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 70 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-10
-20
Deflection (mm)
-30
-40
-50
-60
-70
-80
-90
-100
441 476 511
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 23rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
175 210 245
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 23rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 71 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm)
50
-50
-100
-150
437,5 472,5 507,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 24th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
-50
-100
-150
175 210 245
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 24th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 72 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
434 469 504
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 25th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
175 210 245
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 25th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 73 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm)
50
-50
-100
-150
430,5 465,5 500,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 26th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 26th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 74 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
427 462 497
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 27th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
-140
175 210 245
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 27th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 75 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
423,5 458,5 493,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 28th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 28th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 76 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
420 455 490 525
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 29th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
-140
175 210 245 280
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 29th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 77 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm) 50
0
-50
-100
-150
-200
416,5 451,5 486,5 521,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 30th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 30th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 78 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
Deflection (mm)
-40
-60
-80
-100
-120
-140
413 448 483 518
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 31st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
175 210 245 280
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 31st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 79 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
409,5 444,5 479,5 514,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 32nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 32nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 80 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
406 441 476 511
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 33rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
175 210 245 280
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 33rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 81 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm) 50
0
-50
-100
-150
-200
402,5 437,5 472,5 507,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 34th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 34th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 82 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
399 434 469 504
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 35th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
175 210 245 280
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 35th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 83 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
395,5 430,5 465,5 500,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 36th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 36th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 84 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
392 427 462 497
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 37th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
175 210 245 280
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 37th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 85 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
200
150
Deflection (mm) 100
50
0
-50
-100
-150
-200
388,5 423,5 458,5 493,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 38th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 38th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 86 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
385 420 455 490 525
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 39th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
175 210 245 280 315
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 39th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 87 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
200
150
Deflection (mm) 100
50
0
-50
-100
-150
-200
-250
381,5 416,5 451,5 486,5 521,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 40th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
175 210 245 280 315
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 40th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 88 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
378 413 448 483 518
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 41st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
175 210 245 280 315
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 41st segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 89 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
374,5 409,5 444,5 479,5 514,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 42nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
175 210 245 280 315
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 42nd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 90 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
-200
371 406 441 476 511
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 43rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
-200
175 210 245 280 315
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 43rd segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 91 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
200
150
Deflection (mm) 100
50
0
-50
-100
-150
-200
-250
367,5 402,5 437,5 472,5 507,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 44th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
175 210 245 280 315
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 44th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 92 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
-200
364 399 434 469 504
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 45th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
-200
175 210 245 280 315
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 45th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 93 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
250
200
150
Deflection (mm) 100
50
0
-50
-100
-150
-200
-250
-300
360,5 395,5 430,5 465,5 500,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100% x (m)
Shivpuri - Pouring - Edeck100% Shivpuri - Prestressing - Edeck100%
Shivpuri - Main Cable step 1 - Edeck100% Shivpuri - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 46th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
250
200
150
Deflection (mm)
100
50
0
-50
-100
-150
-200
-250
-300
175 210 245 280 315
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 1 - Edeck100% Chittorgarh - Main Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 46th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 94 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-50
Deflection (mm)
-100
-150
-200
-250
357 392 427 462 497
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 47th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-50
Deflection (mm)
-100
-150
-200
-250
175 210 245 280 315
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 47th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 95 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
300
200
Deflection (mm)
100
-100
-200
-300
353,5 388,5 423,5 458,5 493,5
Shivpuri - Form traveler step1 - Edeck100% Shivpuri - Side Cable step 1 - Edeck100%
x (m)
Shivpuri - Main Cable step 2 - Edeck100% Shivpuri - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Shivpuri Side - casting of 48th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
300
200
Deflection (mm)
100
-100
-200
-300
175 210 245 280 315
x (m)
Chittorgarh - Form traveler step1 - Edeck100% Chittorgarh - Side Cable step 1 - Edeck100%
Chittorgarh - Main Cable step 2 - Edeck100% Chittorgarh - Side Cable step 2 - Edeck100%
Deflection calculated with absolute convention - Chittorgarh Side - casting of 48th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 96 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Casting Steps
0
-50
Deflection (mm)
-100
-150
-200
-250
-300
-350
350 385 420 455 490 525
x (m)
Deflection calculated with absolute convention - Shivpuri Side - casting of 49th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Casting Steps
0
-20
-40
Deflection (mm)
-60
-80
-100
-120
-140
-160
-180
-200
175 210 245 280 315 350
x (m)
Deflection calculated with absolute convention - Chittorgarh Side - casting of 49th segment
Deflection at end of cantilever (mm) Equation with Edesign
Step
E = 80% Edesign E = Edesign E = 130% Edesign (pylon at x=0 and x>0 in cantilever)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 97 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 98 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS - GEOMETRY CONTROL
Parameters comparison
0.4
0.2
0
Deflection (mm)
-0.2
-0.4
-0.6
-0.8
-1
518
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 1'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.2
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -0.9
Distributed Loads 10KN/m on cantilever 0.2
100KN load at end of cantilever 0.0
Parameters comparison
1
0.5
0
Deflection (mm)
-0.5
-1
-1.5
-2
-2.5
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 1
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.5
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -1.9
Distributed Loads 10KN/m on cantilever 0.6
100KN load at end of cantilever -0.1
Parameters comparison
0.4
0.2
0
-0.2
Deflection (mm)
-0.4
-0.6
-0.8
-1
-1.2
-1.4
-1.6
514.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 2'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.3
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -1.5
Distributed Loads 10KN/m on cantilever 0.3
100KN load at end of cantilever -0.1
Parameters comparison
1.5
1
0.5
0
Deflection (mm)
-0.5
-1
-1.5
-2
-2.5
-3
-3.5
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 2
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.8
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -3.0
Distributed Loads 10KN/m on cantilever 0.8
100KN load at end of cantilever -0.1
Parameters comparison
1
0.5
0
Deflection (mm)
-0.5
-1
-1.5
-2
-2.5
511
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 3'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.4
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -2.1
Distributed Loads 10KN/m on cantilever 0.3
100KN load at end of cantilever -0.1
Parameters comparison
2
0
Deflection (mm)
-1
-2
-3
-4
-5
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 3
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.1
Uniform Temperature variation +20°C in deck 0.0
Temperature Gradient +3°C in deck -4.2
Distributed Loads 10KN/m on cantilever 1.0
100KN load at end of cantilever -0.3
Parameters comparison
1
0.5
0
Deflection (mm)
-0.5
-1
-1.5
-2
-2.5
-3
-3.5
507.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 4'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.5
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -2.9
Distributed Loads 10KN/m on cantilever 0.3
100KN load at end of cantilever -0.2
Parameters comparison
2
0
Deflection (mm)
-1
-2
-3
-4
-5
-6
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 4
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.4
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -5.6
Distributed Loads 10KN/m on cantilever 1.0
100KN load at end of cantilever -0.5
Parameters comparison
1
0.5
0
-0.5
Deflection (mm)
-1
-1.5
-2
-2.5
-3
-3.5
-4
-4.5
504
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 5'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.6
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -3.8
Distributed Loads 10KN/m on cantilever 0.2
100KN load at end of cantilever -0.4
Parameters comparison
3
2
1
0
Deflection (mm)
-1
-2
-3
-4
-5
-6
-7
-8
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 5
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.6
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -7.0
Distributed Loads 10KN/m on cantilever 0.9
100KN load at end of cantilever -0.8
Parameters comparison
2
0
Deflection (mm)
-1
-2
-3
-4
-5
-6
500.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 6'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.7
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -4.8
Distributed Loads 10KN/m on cantilever 0.0
100KN load at end of cantilever -0.6
Parameters comparison
4
0
Deflection (mm)
-2
-4
-6
-8
-10
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 6
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.9
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -8.5
Distributed Loads 10KN/m on cantilever 0.7
100KN load at end of cantilever -1.1
Parameters comparison
2
1
0
Deflection (mm)
-1
-2
-3
-4
-5
-6
-7
497
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 7'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.8
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -5.9
Distributed Loads 10KN/m on cantilever -0.3
100KN load at end of cantilever -0.8
Parameters comparison
4
0
Deflection (mm)
-2
-4
-6
-8
-10
-12
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 7
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.2
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -10.1
Distributed Loads 10KN/m on cantilever 0.2
100KN load at end of cantilever -1.5
Parameters comparison
2
1
0
-1
Deflection (mm)
-2
-3
-4
-5
-6
-7
-8
493.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 8'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.9
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -7.0
Distributed Loads 10KN/m on cantilever -0.7
100KN load at end of cantilever -1.1
Parameters comparison
4
2
0
Deflection (mm)
-2
-4
-6
-8
-10
-12
-14
175
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 8
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.4
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -11.8
Distributed Loads 10KN/m on cantilever -0.6
100KN load at end of cantilever -2.0
Parameters comparison
2
0
Deflection (mm)
-2
-4
-6
-8
-10
490 525
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - CLLU-10KN Shivpuri - Load 9'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.1
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -8.3
Distributed Loads 10KN/m on cantilever -1.4
100KN load at end of cantilever -1.4
Parameters comparison
4
2
0
-2
Deflection (mm)
-4
-6
-8
-10
-12
-14
-16
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - CLLU-10KN Chittorgarh - Load 9
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.7
Uniform Temperature variation +20°C in deck 0.1
Temperature Gradient +3°C in deck -13.6
Distributed Loads 10KN/m on cantilever -1.7
100KN load at end of cantilever -2.6
Parameters comparison
3
2
1
0
Deflection (mm)
-1
-2
-3
-4
-5
-6
-7
-8
486.5 521.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.1
Uniform Temperature variation +20°C in deck 2.2
Uniform Temperature variation +20°C in stays -4.4
Temperature Gradient +3°C in deck -6.7
Temperature Gradient +3°C in pylon 0.4
Distributed Loads 10KN/m on cantilever -2.3
100KN load at end of cantilever -1.6
Parameters comparison
6
4
2
0
Deflection (mm)
-2
-4
-6
-8
-10
-12
-14
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.2
Uniform Temperature variation +20°C in deck 3.3
Uniform Temperature variation +20°C in stays -6.7
Temperature Gradient +3°C in deck -12.9
Temperature Gradient +3°C in pylon 0.3
Distributed Loads 10KN/m on cantilever -2.5
100KN load at end of cantilever -2.8
Parameters comparison
4
0
Deflection (mm)
-2
-4
-6
-8
-10
483 518
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.2
Uniform Temperature variation +20°C in deck 2.5
Uniform Temperature variation +20°C in stays -5.0
Temperature Gradient +3°C in deck -7.9
Temperature Gradient +3°C in pylon 0.4
Distributed Loads 10KN/m on cantilever -3.3
100KN load at end of cantilever -2.0
Parameters comparison
6
4
2
Deflection (mm)
0
-2
-4
-6
-8
-10
-12
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.9
Uniform Temperature variation +20°C in deck 3.5
Uniform Temperature variation +20°C in stays -7.2
Temperature Gradient +3°C in deck -10.2
Temperature Gradient +3°C in pylon 0.3
Distributed Loads 10KN/m on cantilever -4.9
100KN load at end of cantilever -3.2
Parameters comparison
8
6
4
2
Deflection (mm)
0
-2
-4
-6
-8
-10
-12
479.5 514.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.8
Uniform Temperature variation +20°C in deck 5.5
Uniform Temperature variation +20°C in stays -10.6
Temperature Gradient +3°C in deck -7.4
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -3.9
100KN load at end of cantilever -2.2
Parameters comparison
10
5
Deflection (mm)
-5
-10
-15
-20
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.3
Uniform Temperature variation +20°C in deck 7.4
Uniform Temperature variation +20°C in stays -14.6
Temperature Gradient +3°C in deck -8.9
Temperature Gradient +3°C in pylon 0.5
Distributed Loads 10KN/m on cantilever -5.5
100KN load at end of cantilever -3.2
Parameters comparison
8
6
4
2
Deflection (mm)
0
-2
-4
-6
-8
-10
-12
-14
476 511
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.9
Uniform Temperature variation +20°C in deck 6.0
Uniform Temperature variation +20°C in stays -11.7
Temperature Gradient +3°C in deck -8.5
Temperature Gradient +3°C in pylon 0.9
Distributed Loads 10KN/m on cantilever -5.3
100KN load at end of cantilever -2.7
Parameters comparison
10
5
Deflection (mm)
-5
-10
-15
-20
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 2.5
Uniform Temperature variation +20°C in deck 8.1
Uniform Temperature variation +20°C in stays -16.0
Temperature Gradient +3°C in deck -10.1
Temperature Gradient +3°C in pylon 0.5
Distributed Loads 10KN/m on cantilever -7.4
100KN load at end of cantilever -3.8
Parameters comparison
15
10
5
Deflection (mm)
-5
-10
-15
-20
472.5 507.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.5
Uniform Temperature variation +20°C in deck 9.6
Uniform Temperature variation +20°C in stays -18.2
Temperature Gradient +3°C in deck -7.8
Temperature Gradient +3°C in pylon 1.2
Distributed Loads 10KN/m on cantilever -5.9
100KN load at end of cantilever -2.8
Parameters comparison
15
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
-30
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.9
Uniform Temperature variation +20°C in deck 12.5
Uniform Temperature variation +20°C in stays -23.6
Temperature Gradient +3°C in deck -8.8
Temperature Gradient +3°C in pylon 0.7
Distributed Loads 10KN/m on cantilever -7.9
100KN load at end of cantilever -3.7
Parameters comparison
15
10
5
Deflection (mm)
-5
-10
-15
-20
-25
469 504
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.5
Uniform Temperature variation +20°C in deck 10.5
Uniform Temperature variation +20°C in stays -19.7
Temperature Gradient +3°C in deck -9.0
Temperature Gradient +3°C in pylon 1.3
Distributed Loads 10KN/m on cantilever -7.6
100KN load at end of cantilever -3.4
Parameters comparison
20
15
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
-30
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.9
Uniform Temperature variation +20°C in deck 13.5
Uniform Temperature variation +20°C in stays -25.6
Temperature Gradient +3°C in deck -10.0
Temperature Gradient +3°C in pylon 0.7
Distributed Loads 10KN/m on cantilever -10.1
100KN load at end of cantilever -4.4
Parameters comparison
20
15
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
-30
465.5 500.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.1
Uniform Temperature variation +20°C in deck 14.7
Uniform Temperature variation +20°C in stays -26.7
Temperature Gradient +3°C in deck -8.5
Temperature Gradient +3°C in pylon 1.6
Distributed Loads 10KN/m on cantilever -8.0
100KN load at end of cantilever -3.4
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.3
Uniform Temperature variation +20°C in deck 18.1
Uniform Temperature variation +20°C in stays -33.1
Temperature Gradient +3°C in deck -8.6
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -10.4
100KN load at end of cantilever -4.3
Parameters comparison
20
15
10
5
Deflection (mm)
0
-5
-10
-15
-20
-25
-30
-35
462 497
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.0
Uniform Temperature variation +20°C in deck 15.8
Uniform Temperature variation +20°C in stays -28.7
Temperature Gradient +3°C in deck -9.7
Temperature Gradient +3°C in pylon 1.8
Distributed Loads 10KN/m on cantilever -10.0
100KN load at end of cantilever -4.0
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 1.3
Uniform Temperature variation +20°C in deck 19.4
Uniform Temperature variation +20°C in stays -35.5
Temperature Gradient +3°C in deck -9.7
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -12.9
100KN load at end of cantilever -5.0
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
458.5 493.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.4
Uniform Temperature variation +20°C in deck 20.3
Uniform Temperature variation +20°C in stays -35.8
Temperature Gradient +3°C in deck -8.6
Temperature Gradient +3°C in pylon 2.0
Distributed Loads 10KN/m on cantilever -10.4
100KN load at end of cantilever -4.0
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
-50
175 210
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.8
Uniform Temperature variation +20°C in deck 24.2
Uniform Temperature variation +20°C in stays -42.8
Temperature Gradient +3°C in deck -8.3
Temperature Gradient +3°C in pylon 0.9
Distributed Loads 10KN/m on cantilever -12.9
100KN load at end of cantilever -4.8
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
-50
455 490 525
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.5
Uniform Temperature variation +20°C in deck 21.7
Uniform Temperature variation +20°C in stays -38.3
Temperature Gradient +3°C in deck -9.7
Temperature Gradient +3°C in pylon 2.2
Distributed Loads 10KN/m on cantilever -12.8
100KN load at end of cantilever -4.7
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
-50
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.8
Uniform Temperature variation +20°C in deck 25.7
Uniform Temperature variation +20°C in stays -45.5
Temperature Gradient +3°C in deck -10.2
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -15.4
100KN load at end of cantilever -5.5
Parameters comparison
30
20
10
Deflection (mm)
-10
-20
-30
-40
-50
451.5 486.5 521.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.9
Uniform Temperature variation +20°C in deck 26.3
Uniform Temperature variation +20°C in stays -45.0
Temperature Gradient +3°C in deck -8.6
Temperature Gradient +3°C in pylon 2.4
Distributed Loads 10KN/m on cantilever -13.3
100KN load at end of cantilever -4.7
Parameters comparison
40
30
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
-60
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.3
Uniform Temperature variation +20°C in deck 30.3
Uniform Temperature variation +20°C in stays -52.1
Temperature Gradient +3°C in deck -8.9
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -15.6
100KN load at end of cantilever -5.4
Parameters comparison
40
30
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
-60
448 483 518
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.0
Uniform Temperature variation +20°C in deck 27.8
Uniform Temperature variation +20°C in stays -47.8
Temperature Gradient +3°C in deck -9.8
Temperature Gradient +3°C in pylon 2.6
Distributed Loads 10KN/m on cantilever -16.0
100KN load at end of cantilever -5.5
Parameters comparison
40
30
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
-60
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge 0.2
Uniform Temperature variation +20°C in deck 32.1
Uniform Temperature variation +20°C in stays -55.1
Temperature Gradient +3°C in deck -10.0
Temperature Gradient +3°C in pylon 0.8
Distributed Loads 10KN/m on cantilever -18.7
100KN load at end of cantilever -6.2
Parameters comparison
40
30
20
10
Deflection (mm)
0
-10
-20
-30
-40
-50
-60
444.5 479.5 514.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.4
Uniform Temperature variation +20°C in deck 32.6
Uniform Temperature variation +20°C in stays -54.5
Temperature Gradient +3°C in deck -8.6
Temperature Gradient +3°C in pylon 2.8
Distributed Loads 10KN/m on cantilever -16.4
100KN load at end of cantilever -5.4
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.3
Uniform Temperature variation +20°C in deck 36.7
Uniform Temperature variation +20°C in stays -61.6
Temperature Gradient +3°C in deck -8.6
Temperature Gradient +3°C in pylon 0.7
Distributed Loads 10KN/m on cantilever -18.8
100KN load at end of cantilever -6.0
Parameters comparison
40
Deflection (mm) 20
-20
-40
-60
-80
441 476 511
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.6
Uniform Temperature variation +20°C in deck 34.4
Uniform Temperature variation +20°C in stays -57.5
Temperature Gradient +3°C in deck -9.8
Temperature Gradient +3°C in pylon 3.0
Distributed Loads 10KN/m on cantilever -19.5
100KN load at end of cantilever -6.2
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.4
Uniform Temperature variation +20°C in deck 38.6
Uniform Temperature variation +20°C in stays -64.8
Temperature Gradient +3°C in deck -9.8
Temperature Gradient +3°C in pylon 0.7
Distributed Loads 10KN/m on cantilever -22.2
100KN load at end of cantilever -6.9
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
437.5 472.5 507.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.0
Uniform Temperature variation +20°C in deck 39.3
Uniform Temperature variation +20°C in stays -64.2
Temperature Gradient +3°C in deck -8.5
Temperature Gradient +3°C in pylon 3.2
Distributed Loads 10KN/m on cantilever -19.9
100KN load at end of cantilever -6.1
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -0.9
Uniform Temperature variation +20°C in deck 43.4
Uniform Temperature variation +20°C in stays -71.1
Temperature Gradient +3°C in deck -8.4
Temperature Gradient +3°C in pylon 0.6
Distributed Loads 10KN/m on cantilever -22.2
100KN load at end of cantilever -6.7
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
434 469 504
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.2
Uniform Temperature variation +20°C in deck 41.2
Uniform Temperature variation +20°C in stays -67.4
Temperature Gradient +3°C in deck -9.7
Temperature Gradient +3°C in pylon 3.4
Distributed Loads 10KN/m on cantilever -23.3
100KN load at end of cantilever -7.0
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
-100
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.0
Uniform Temperature variation +20°C in deck 45.4
Uniform Temperature variation +20°C in stays -74.5
Temperature Gradient +3°C in deck -9.5
Temperature Gradient +3°C in pylon 0.5
Distributed Loads 10KN/m on cantilever -25.9
100KN load at end of cantilever -7.6
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
-100
430.5 465.5 500.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.7
Uniform Temperature variation +20°C in deck 46.7
Uniform Temperature variation +20°C in stays -74.7
Temperature Gradient +3°C in deck -8.0
Temperature Gradient +3°C in pylon 3.6
Distributed Loads 10KN/m on cantilever -23.0
100KN load at end of cantilever -6.7
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
-100
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.6
Uniform Temperature variation +20°C in deck 50.7
Uniform Temperature variation +20°C in stays -81.2
Temperature Gradient +3°C in deck -7.7
Temperature Gradient +3°C in pylon 0.4
Distributed Loads 10KN/m on cantilever -25.2
100KN load at end of cantilever -7.2
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
-100
427 462 497
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.9
Uniform Temperature variation +20°C in deck 48.8
Uniform Temperature variation +20°C in stays -78.0
Temperature Gradient +3°C in deck -9.2
Temperature Gradient +3°C in pylon 3.9
Distributed Loads 10KN/m on cantilever -26.7
100KN load at end of cantilever -7.6
Parameters comparison
60
40
20
Deflection (mm)
-20
-40
-60
-80
-100
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -1.8
Uniform Temperature variation +20°C in deck 52.8
Uniform Temperature variation +20°C in stays -84.7
Temperature Gradient +3°C in deck -8.8
Temperature Gradient +3°C in pylon 0.4
Distributed Loads 10KN/m on cantilever -29.1
100KN load at end of cantilever -8.1
Parameters comparison
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
423.5 458.5 493.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -3.5
Uniform Temperature variation +20°C in deck 55.1
Uniform Temperature variation +20°C in stays -86.0
Temperature Gradient +3°C in deck -6.9
Temperature Gradient +3°C in pylon 4.0
Distributed Loads 10KN/m on cantilever -25.2
100KN load at end of cantilever -7.0
Parameters comparison
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
175 210 245
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.5
Uniform Temperature variation +20°C in deck 58.8
Uniform Temperature variation +20°C in stays -92.0
Temperature Gradient +3°C in deck -6.4
Temperature Gradient +3°C in pylon 0.3
Distributed Loads 10KN/m on cantilever -27.2
100KN load at end of cantilever -7.3
Parameters comparison
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
420 455 490 525
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -3.7
Uniform Temperature variation +20°C in deck 57.4
Uniform Temperature variation +20°C in stays -89.6
Temperature Gradient +3°C in deck -8.0
Temperature Gradient +3°C in pylon 4.2
Distributed Loads 10KN/m on cantilever -28.9
100KN load at end of cantilever -7.9
Parameters comparison
80
60
40
20
Deflection (mm)
0
-20
-40
-60
-80
-100
-120
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -2.7
Uniform Temperature variation +20°C in deck 61.1
Uniform Temperature variation +20°C in stays -95.7
Temperature Gradient +3°C in deck -7.5
Temperature Gradient +3°C in pylon 0.2
Distributed Loads 10KN/m on cantilever -31.1
100KN load at end of cantilever -8.3
Parameters comparison
80
60
40
20
Deflection (mm)
0
-20
-40
-60
-80
-100
-120
416.5 451.5 486.5 521.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -4.4
Uniform Temperature variation +20°C in deck 63.6
Uniform Temperature variation +20°C in stays -97.4
Temperature Gradient +3°C in deck -5.8
Temperature Gradient +3°C in pylon 4.3
Distributed Loads 10KN/m on cantilever -27.2
100KN load at end of cantilever -7.2
Parameters comparison
80
60
40
20
Deflection (mm)
0
-20
-40
-60
-80
-100
-120
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -3.4
Uniform Temperature variation +20°C in deck 66.9
Uniform Temperature variation +20°C in stays -102.8
Temperature Gradient +3°C in deck -5.3
Temperature Gradient +3°C in pylon 0.1
Distributed Loads 10KN/m on cantilever -29.1
100KN load at end of cantilever -7.5
Parameters comparison
80
60
40
20
Deflection (mm)
0
-20
-40
-60
-80
-100
-120
413 448 483 518
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -4.6
Uniform Temperature variation +20°C in deck 66.1
Uniform Temperature variation +20°C in stays -101.1
Temperature Gradient +3°C in deck -6.8
Temperature Gradient +3°C in pylon 4.5
Distributed Loads 10KN/m on cantilever -31.0
100KN load at end of cantilever -8.1
Parameters comparison
80
60
40
20
Deflection (mm)
0
-20
-40
-60
-80
-100
-120
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -3.6
Uniform Temperature variation +20°C in deck 69.4
Uniform Temperature variation +20°C in stays -106.5
Temperature Gradient +3°C in deck -6.4
Temperature Gradient +3°C in pylon 0.0
Distributed Loads 10KN/m on cantilever -33.0
100KN load at end of cantilever -8.4
Parameters comparison
100
80
60
40
Deflection (mm)
20
0
-20
-40
-60
-80
-100
-120
409.5 444.5 479.5 514.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -5.3
Uniform Temperature variation +20°C in deck 72.1
Uniform Temperature variation +20°C in stays -108.6
Temperature Gradient +3°C in deck -4.9
Temperature Gradient +3°C in pylon 4.6
Distributed Loads 10KN/m on cantilever -29.4
100KN load at end of cantilever -7.5
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -4.3
Uniform Temperature variation +20°C in deck 75.1
Uniform Temperature variation +20°C in stays -113.3
Temperature Gradient +3°C in deck -4.5
Temperature Gradient +3°C in pylon 0.0
Distributed Loads 10KN/m on cantilever -31.0
100KN load at end of cantilever -7.7
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
406 441 476 511
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -5.6
Uniform Temperature variation +20°C in deck 74.7
Uniform Temperature variation +20°C in stays -112.5
Temperature Gradient +3°C in deck -6.0
Temperature Gradient +3°C in pylon 4.8
Distributed Loads 10KN/m on cantilever -33.3
100KN load at end of cantilever -8.4
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -4.5
Uniform Temperature variation +20°C in deck 77.7
Uniform Temperature variation +20°C in stays -117.2
Temperature Gradient +3°C in deck -5.5
Temperature Gradient +3°C in pylon -0.1
Distributed Loads 10KN/m on cantilever -35.0
100KN load at end of cantilever -8.6
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
402.5 437.5 472.5 507.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -6.2
Uniform Temperature variation +20°C in deck 80.5
Uniform Temperature variation +20°C in stays -119.6
Temperature Gradient +3°C in deck -4.3
Temperature Gradient +3°C in pylon 4.9
Distributed Loads 10KN/m on cantilever -31.7
100KN load at end of cantilever -7.9
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -5.1
Uniform Temperature variation +20°C in deck 83.2
Uniform Temperature variation +20°C in stays -123.8
Temperature Gradient +3°C in deck -3.8
Temperature Gradient +3°C in pylon -0.1
Distributed Loads 10KN/m on cantilever -33.2
100KN load at end of cantilever -8.0
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
399 434 469 504
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -6.5
Uniform Temperature variation +20°C in deck 83.2
Uniform Temperature variation +20°C in stays -123.6
Temperature Gradient +3°C in deck -5.3
Temperature Gradient +3°C in pylon 5.1
Distributed Loads 10KN/m on cantilever -35.7
100KN load at end of cantilever -8.8
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -5.4
Uniform Temperature variation +20°C in deck 85.9
Uniform Temperature variation +20°C in stays -127.7
Temperature Gradient +3°C in deck -4.9
Temperature Gradient +3°C in pylon -0.3
Distributed Loads 10KN/m on cantilever -37.2
100KN load at end of cantilever -9.0
Parameters comparison
100
50
Deflection (mm)
-50
-100
-150
395.5 430.5 465.5 500.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -7.1
Uniform Temperature variation +20°C in deck 89.0
Uniform Temperature variation +20°C in stays -130.5
Temperature Gradient +3°C in deck -3.8
Temperature Gradient +3°C in pylon 5.1
Distributed Loads 10KN/m on cantilever -34.2
100KN load at end of cantilever -8.3
Parameters comparison
150
100
Deflection (mm)
50
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -6.0
Uniform Temperature variation +20°C in deck 91.3
Uniform Temperature variation +20°C in stays -134.2
Temperature Gradient +3°C in deck -3.4
Temperature Gradient +3°C in pylon -0.3
Distributed Loads 10KN/m on cantilever -35.5
100KN load at end of cantilever -8.4
Parameters comparison
150
50
-50
-100
-150
392 427 462 497
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -7.4
Uniform Temperature variation +20°C in deck 91.8
Uniform Temperature variation +20°C in stays -134.6
Temperature Gradient +3°C in deck -4.8
Temperature Gradient +3°C in pylon 5.4
Distributed Loads 10KN/m on cantilever -38.4
100KN load at end of cantilever -9.3
Parameters comparison
150
100
Deflection (mm)
50
-50
-100
-150
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -6.3
Uniform Temperature variation +20°C in deck 94.0
Uniform Temperature variation +20°C in stays -138.1
Temperature Gradient +3°C in deck -4.5
Temperature Gradient +3°C in pylon -0.4
Distributed Loads 10KN/m on cantilever -39.7
100KN load at end of cantilever -9.4
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
388.5 423.5 458.5 493.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -8.1
Uniform Temperature variation +20°C in deck 97.4
Uniform Temperature variation +20°C in stays -141.3
Temperature Gradient +3°C in deck -3.3
Temperature Gradient +3°C in pylon 5.4
Distributed Loads 10KN/m on cantilever -36.9
100KN load at end of cantilever -8.8
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -6.9
Uniform Temperature variation +20°C in deck 99.5
Uniform Temperature variation +20°C in stays -144.6
Temperature Gradient +3°C in deck -3.0
Temperature Gradient +3°C in pylon -0.4
Distributed Loads 10KN/m on cantilever -38.1
100KN load at end of cantilever -8.9
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
385 420 455 490 525
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -8.4
Uniform Temperature variation +20°C in deck 100.3
Uniform Temperature variation +20°C in stays -145.4
Temperature Gradient +3°C in deck -4.5
Temperature Gradient +3°C in pylon 5.7
Distributed Loads 10KN/m on cantilever -41.2
100KN load at end of cantilever -9.8
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -7.2
Uniform Temperature variation +20°C in deck 102.3
Uniform Temperature variation +20°C in stays -148.6
Temperature Gradient +3°C in deck -4.1
Temperature Gradient +3°C in pylon -0.6
Distributed Loads 10KN/m on cantilever -42.5
100KN load at end of cantilever -9.9
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
381.5 416.5 451.5 486.5 521.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -9.0
Uniform Temperature variation +20°C in deck 105.7
Uniform Temperature variation +20°C in stays -151.9
Temperature Gradient +3°C in deck -3.1
Temperature Gradient +3°C in pylon 5.7
Distributed Loads 10KN/m on cantilever -39.9
100KN load at end of cantilever -9.3
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -7.7
Uniform Temperature variation +20°C in deck 107.5
Uniform Temperature variation +20°C in stays -154.7
Temperature Gradient +3°C in deck -2.8
Temperature Gradient +3°C in pylon -0.6
Distributed Loads 10KN/m on cantilever -41.0
100KN load at end of cantilever -9.4
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
378 413 448 483 518
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -9.3
Uniform Temperature variation +20°C in deck 108.6
Uniform Temperature variation +20°C in stays -156.1
Temperature Gradient +3°C in deck -4.3
Temperature Gradient +3°C in pylon 6.0
Distributed Loads 10KN/m on cantilever -44.5
100KN load at end of cantilever -10.4
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -8.1
Uniform Temperature variation +20°C in deck 110.4
Uniform Temperature variation +20°C in stays -158.7
Temperature Gradient +3°C in deck -4.0
Temperature Gradient +3°C in pylon -0.8
Distributed Loads 10KN/m on cantilever -45.6
100KN load at end of cantilever -10.5
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
374.5 409.5 444.5 479.5 514.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -9.9
Uniform Temperature variation +20°C in deck 113.6
Uniform Temperature variation +20°C in stays -162.2
Temperature Gradient +3°C in deck -3.3
Temperature Gradient +3°C in pylon 6.1
Distributed Loads 10KN/m on cantilever -44.1
100KN load at end of cantilever -10.2
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -8.6
Uniform Temperature variation +20°C in deck 115.2
Uniform Temperature variation +20°C in stays -164.5
Temperature Gradient +3°C in deck -3.0
Temperature Gradient +3°C in pylon -0.8
Distributed Loads 10KN/m on cantilever -45.1
100KN load at end of cantilever -10.3
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
371 406 441 476 511
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -10.2
Uniform Temperature variation +20°C in deck 116.6
Uniform Temperature variation +20°C in stays -166.3
Temperature Gradient +3°C in deck -4.5
Temperature Gradient +3°C in pylon 6.3
Distributed Loads 10KN/m on cantilever -49.1
100KN load at end of cantilever -11.3
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -8.9
Uniform Temperature variation +20°C in deck 118.1
Uniform Temperature variation +20°C in stays -168.6
Temperature Gradient +3°C in deck -4.3
Temperature Gradient +3°C in pylon -1.0
Distributed Loads 10KN/m on cantilever -50.1
100KN load at end of cantilever -11.4
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
367.5 402.5 437.5 472.5 507.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -10.8
Uniform Temperature variation +20°C in deck 121.5
Uniform Temperature variation +20°C in stays -172.2
Temperature Gradient +3°C in deck -3.7
Temperature Gradient +3°C in pylon 6.4
Distributed Loads 10KN/m on cantilever -49.3
100KN load at end of cantilever -11.2
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -9.4
Uniform Temperature variation +20°C in deck 122.8
Uniform Temperature variation +20°C in stays -174.2
Temperature Gradient +3°C in deck -3.5
Temperature Gradient +3°C in pylon -1.1
Distributed Loads 10KN/m on cantilever -50.2
100KN load at end of cantilever -11.3
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
364 399 434 469 504
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -11.1
Uniform Temperature variation +20°C in deck 124.5
Uniform Temperature variation +20°C in stays -176.4
Temperature Gradient +3°C in deck -5.0
Temperature Gradient +3°C in pylon 6.7
Distributed Loads 10KN/m on cantilever -54.8
100KN load at end of cantilever -12.5
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -9.7
Uniform Temperature variation +20°C in deck 125.7
Uniform Temperature variation +20°C in stays -178.2
Temperature Gradient +3°C in deck -4.7
Temperature Gradient +3°C in pylon -1.3
Distributed Loads 10KN/m on cantilever -55.7
100KN load at end of cantilever -12.5
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
360.5 395.5 430.5 465.5 500.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -11.7
Uniform Temperature variation +20°C in deck 129.6
Uniform Temperature variation +20°C in stays -182.5
Temperature Gradient +3°C in deck -3.9
Temperature Gradient +3°C in pylon 6.8
Distributed Loads 10KN/m on cantilever -54.4
100KN load at end of cantilever -12.2
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -10.2
Uniform Temperature variation +20°C in deck 130.6
Uniform Temperature variation +20°C in stays -184.0
Temperature Gradient +3°C in deck -3.6
Temperature Gradient +3°C in pylon -1.3
Distributed Loads 10KN/m on cantilever -55.3
100KN load at end of cantilever -12.3
Parameters comparison
150
100
Deflection (mm)
50
-50
-100
357 392 427 462 497
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -12.0
Uniform Temperature variation +20°C in deck 132.6
Uniform Temperature variation +20°C in stays 7.0
Temperature Gradient +3°C in deck -5.2
Temperature Gradient +3°C in pylon 7.0
Distributed Loads 10KN/m on cantilever -60.4
100KN load at end of cantilever -13.5
Parameters comparison
150
100
50
Deflection (mm)
-50
-100
-150
-200
-250
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -10.6
Uniform Temperature variation +20°C in deck 133.6
Uniform Temperature variation +20°C in stays -188.1
Temperature Gradient +3°C in deck -5.0
Temperature Gradient +3°C in pylon -1.5
Distributed Loads 10KN/m on cantilever -61.3
100KN load at end of cantilever -13.6
Parameters comparison
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
353.5 388.5 423.5 458.5 493.5
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TU+20 (Stay) Shivpuri - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -12.6
Uniform Temperature variation +20°C in deck 137.9
Uniform Temperature variation +20°C in stays -192.8
Temperature Gradient +3°C in deck -3.8
Temperature Gradient +3°C in pylon 7.1
Distributed Loads 10KN/m on cantilever -59.7
100KN load at end of cantilever -13.2
Parameters comparison
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
175 210 245 280 315
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TU+20 (Stay) Chittorgarh - TG+3 (Deck)
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -11.0
Uniform Temperature variation +20°C in deck 138.8
Uniform Temperature variation +20°C in stays -194.1
Temperature Gradient +3°C in deck -3.7
Temperature Gradient +3°C in pylon -1.6
Distributed Loads 10KN/m on cantilever -60.5
100KN load at end of cantilever -13.2
Parameters comparison
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
350 385 420 455 490 525
x (m)
Shivpuri - TU+20 (All) Shivpuri - TU+20 (Deck) Shivpuri - TG+3 (Deck) Shivpuri - PGlongi+3 (Pylon)
Shivpuri - TU+20 (Stay) Shivpuri - CLLU-10KN Shivpuri - Load 49'
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -12.9
Uniform Temperature variation +20°C in deck 140.2
Uniform Temperature variation +20°C in stays -196.1
Temperature Gradient +3°C in deck -4.9
Temperature Gradient +3°C in pylon 7.3
Distributed Loads 10KN/m on cantilever -64.6
100KN load at end of cantilever -14.4
Parameters comparison
200
150
100
Deflection (mm)
50
0
-50
-100
-150
-200
-250
175 210 245 280 315 350
x (m)
Chittorgarh - TU+20 (All) Chittorgarh - TU+20 (Deck) Chittorgarh - TG+3 (Deck) Chittorgarh - PGlongi+3 (Pylon)
Chittorgarh - TU+20 (Stay) Chittorgarh - CLLU-10KN Chittorgarh - Load 49
Parameter Deflection at end of cantilever (mm) Equation (pylon at x=0 and x>0 in cantilever)
Uniform Temperature variation +20°C in bridge -11.4
Uniform Temperature variation +20°C in deck 140.6
Uniform Temperature variation +20°C in stays -196.8
Temperature Gradient +3°C in deck -4.7
Temperature Gradient +3°C in pylon -1.7
Distributed Loads 10KN/m on cantilever -65.2
100KN load at end of cantilever -14.4
0,2
0,1
Deflection
0,0
-0,1
-0,2
-0,3
-0,4
-0,5
Deflection calculated with absolute convention - Shivpuri Side - casting of 1th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,5
segment 0 (mm)
0,0
Deflection
-0,5
-1,0
-1,5
Deflection calculated with absolute convention - Chittorgarh Side - casting of 1th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 99 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
1,0
segment 1' (mm)
0,5
Deflection
0,0
-0,5
-1,0
-1,5
Deflection calculated with absolute convention - Shivpuri Side - casting of 2th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
2,0
segment 1 (mm)
1,0
Deflection
0,0
-1,0
-2,0
-3,0
-4,0
-5,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 2th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 100 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 2' (mm) 2,0
1,0
Deflection
0,0
-1,0
-2,0
-3,0
-4,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 3th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -1,3 -2,9 1,4
80% -1,0 -2,2 1,0
100% -0,9 -2,0 0,8
130% -0,8 -1,7 0,7
200% -0,6 -1,4 0,5
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
4,0
segment 2 (mm)
2,0
Deflection
0,0
-2,0
-4,0
-6,0
-8,0
-10,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 3th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -4,0 -8,8 3,1
80% -2,5 -5,5 1,9
100% -2,0 -4,4 1,5
130% -1,6 -3,4 1,2
200% -1,0 -2,3 0,8
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 101 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 3' (mm) 4,0
2,0
Deflection
0,0
-2,0
-4,0
-6,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 4th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -2,5 -5,5 2,1
80% -1,9 -4,2 1,5
100% -1,7 -3,7 1,3
130% -1,4 -3,2 1,1
200% -1,1 -2,4 0,8
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
10,0
segment 3 (mm)
5,0
Deflection
0,0
-5,0
-10,0
-15,0
-20,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 4th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -7,1 -15,8 4,6
80% -4,4 -9,8 2,8
100% -3,6 -7,9 2,3
130% -2,7 -6,1 1,8
200% -1,8 -4,0 1,1
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 102 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 4' (mm) 4,0
2,0
Deflection
0,0
-2,0
-4,0
-6,0
-8,0
-10,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 5th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -4,1 -8,5 2,6
80% -3,1 -6,4 1,9
100% -2,7 -5,6 1,6
130% -2,3 -4,8 1,3
200% -1,8 -3,6 1,0
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
10,0
segment 4 (mm)
5,0
Deflection
0,0
-5,0
-10,0
-15,0
-20,0
-25,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 5th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -11,2 -23,2 5,6
80% -7,0 -14,4 3,5
100% -5,6 -11,6 2,8
130% -4,3 -8,9 2,2
200% -2,8 -5,8 1,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 103 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 5' (mm) 10,0
5,0
Deflection
0,0
-5,0
-10,0
-15,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 6th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -6,3 -12,7 4,4
80% -4,7 -9,4 3,1
100% -4,1 -8,2 2,7
130% -3,5 -6,9 2,2
200% -2,6 -5,2 1,6
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
20,0
segment 5 (mm)
10,0
Deflection
0,0
-10,0
-20,0
-30,0
-40,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 6th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -16,4 -32,9 9,2
80% -10,2 -20,5 5,8
100% -8,2 -16,4 4,6
130% -6,3 -12,6 3,5
200% -4,1 -8,2 2,3
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 104 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 6' (mm) 10,0
5,0
Deflection
0,0
-5,0
-10,0
-15,0
-20,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 7th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -9,2 -17,8 5,9
80% -6,8 -13,1 4,2
100% -5,8 -11,3 3,5
130% -4,9 -9,5 2,9
200% -3,7 -7,1 2,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
20,0
segment 6 (mm)
10,0
Deflection
0,0
-10,0
-20,0
-30,0
-40,0
-50,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 7th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -22,8 -44,0 12,6
80% -14,2 -27,4 7,8
100% -11,3 -21,9 6,2
130% -8,7 -16,8 4,8
200% -5,7 -11,0 3,1
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 105 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 7' (mm) 10,0
5,0
Deflection
0,0
-5,0
-10,0
-15,0
-20,0
-25,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 8th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -12,9 -22,7 6,5
80% -9,3 -16,5 4,7
100% -8,0 -14,2 4,0
130% -6,7 -11,9 3,3
200% -5,0 -8,8 2,4
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
20,0
10,0
segment 7 (mm)
0,0
Deflection
-10,0
-20,0
-30,0
-40,0
-50,0
-60,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 8th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -30,4 -53,6 14,3
80% -18,9 -33,4 8,9
100% -15,1 -26,7 7,1
130% -11,6 -20,5 5,4
200% -7,6 -13,4 3,5
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 106 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 8' (mm) 20,0
10,0
Deflection
0,0
-10,0
-20,0
-30,0
-40,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 9th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -17,4 -29,6 8,8
80% -12,5 -21,3 6,1
100% -10,7 -18,2 5,1
130% -8,9 -15,2 4,1
200% -6,6 -11,2 2,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
20,0
segment 8 (mm)
0,0
Deflection
-20,0
-40,0
-60,0
-80,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 9th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring Prestressing
50% -39,4 -67,1 15,4
80% -24,5 -41,8 9,6
100% -19,6 -33,4 7,7
130% -15,1 -25,7 5,9
200% -9,8 -16,8 3,8
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 107 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 9' (mm) 40,0
20,0
Deflection
0,0
-20,0
-40,0
-60,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 10th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
60,0
segment 9 (mm)
40,0
20,0
Deflection
0,0
-20,0
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 10th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 108 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-10,0
10' (mm)
-20,0
-30,0
-40,0
-50,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 11th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -23,1 -38,5
80% -17,6 -29,2
100% -15,3 -25,4
130% -12,9 -21,4
200% -9,5 -15,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-10,0
-20,0
10 (mm)
-30,0
-40,0
-50,0
-60,0
-70,0
-80,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 11th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -41,4 -69,1
80% -28,6 -47,7
100% -23,8 -39,6
130% -18,9 -31,6
200% -12,9 -21,5
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 109 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
60,0
Deflection segment
40,0
20,0
11' (mm)
0,0
-20,0
-40,0
-60,0
-80,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 12th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -29,2 19,8 -55,5 41,2 18,1 6,0
80% -22,1 16,8 -41,9 28,9 13,1 4,8
100% -19,2 15,4 -36,4 24,3 10,9 4,5
130% -16,1 13,7 -30,6 19,7 8,7 4,1
200% -11,9 10,7 -22,7 13,7 5,7 3,6
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
80,0
60,0
Deflection segment
40,0
20,0
11 (mm)
0,0
-20,0
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 12th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -50,9 56,7 -86,0 43,6 18,8 5,5
80% -35,2 38,8 -61,9 30,8 13,9 6,7
100% -29,2 32,2 -52,3 26,0 11,7 6,3
130% -23,3 25,7 -42,5 21,0 9,4 5,6
200% -15,8 17,5 -29,6 14,5 6,1 4,0
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 110 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-10,0
12' (mm)
-20,0
-30,0
-40,0
-50,0
-60,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 13th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -29,2 -48,5
80% -23,2 -38,6
100% -20,6 -34,2
130% -17,6 -29,3
200% -13,4 -22,3
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
12 (mm)
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 13th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -46,1 -76,9
80% -34,4 -57,4
100% -29,5 -49,2
130% -24,3 -40,6
200% -17,3 -28,9
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 111 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 13' (mm) 80,0
60,0
40,0
Deflection
20,0
0,0
-20,0
-40,0
-60,0
-80,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 14th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
100,0
segment 13 (mm)
50,0
Deflection
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 14th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 112 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-10,0
-20,0
14' (mm)
-30,0
-40,0
-50,0
-60,0
-70,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 15th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -35,1 -58,5
80% -28,9 -48,2
100% -26,0 -43,3
130% -22,7 -37,8
200% -17,6 -29,4
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
14 (mm)
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 15th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -49,7 -82,9
80% -39,4 -65,7
100% -34,7 -57,9
130% -29,5 -49,2
200% -21,9 -36,5
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 113 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
80,0
Deflection segment 60,0
40,0
20,0
15' (mm)
0,0
-20,0
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 16th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -42,7 42,0 -79,6 67,8 30,5 12,0
80% -34,8 36,3 -65,2 53,9 24,0 10,7
100% -31,2 33,4 -58,5 47,6 21,2 9,9
130% -27,1 29,5 -51,0 40,7 18,0 9,6
200% -21,0 23,9 -39,7 30,6 12,9 7,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
100,0
Deflection segment
50,0
15 (mm)
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 16th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -59,1 79,3 -102,8 70,3 31,8 19,4
80% -46,7 62,5 -83,0 56,8 25,5 16,7
100% -41,0 54,9 -73,8 50,4 22,6 15,2
130% -34,8 46,6 -63,4 43,2 19,3 13,4
200% -25,8 34,4 -47,9 32,5 13,7 9,7
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 114 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-10,0
-20,0
16' (mm)
-30,0
-40,0
-50,0
-60,0
-70,0
-80,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 17th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -41,2 -68,7
80% -34,7 -57,9
100% -31,6 -52,7
130% -28,0 -46,7
200% -22,2 -37,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
16 (mm)
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 17th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -53,2 -88,8
80% -44,0 -73,4
100% -39,6 -66,1
130% -34,5 -57,6
200% -26,6 -44,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 115 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 17' (mm) 100,0
50,0
Deflection
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 18th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
100,0
segment 17 (mm)
50,0
Deflection
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 18th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 116 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
18' (mm)
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 19th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -47,6 -79,5
80% -40,8 -68,0
100% -37,5 -62,5
130% -33,5 -55,9
200% -27,2 -45,3
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
18 (mm)
-60,0
-80,0
-100,0
-120,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 19th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -57,4 -95,7
80% -48,8 -81,4
100% -44,6 -74,4
130% -39,6 -66,0
200% -31,5 -52,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 117 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
150,0
Deflection segment
100,0
50,0
19' (mm)
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 20th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -56,7 56,9 -106,5 96,1 43,1 17,9
80% -48,0 50,8 -90,3 79,3 35,4 16,2
100% -43,9 46,8 -82,6 71,7 31,9 16,0
130% -39,1 42,9 -73,8 63,0 28,0 14,7
200% -31,5 35,9 -59,7 49,7 21,1 12,4
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
150,0
Deflection segment
100,0
50,0
19 (mm)
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 20th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -67,3 84,1 -122,3 97,2 43,8 25,4
80% -56,8 72,0 -104,0 81,6 36,5 22,4
100% -51,7 65,9 -95,2 74,2 33,2 19,2
130% -45,7 58,6 -84,7 65,6 29,3 17,5
200% -36,2 45,9 -67,8 52,0 22,1 15,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 118 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
20' (mm)
-40,0
-60,0
-80,0
-100,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 21th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -54,4 -90,8
80% -47,1 -78,6
100% -43,6 -72,6
130% -39,3 -65,6
200% -32,4 -54,0
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
20 (mm)
-60,0
-80,0
-100,0
-120,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 21th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -62,5 -104,2
80% -54,1 -90,2
100% -49,9 -83,2
130% -44,9 -74,8
200% -36,5 -60,9
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 119 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 21' (mm) 150,0
100,0
Deflection
50,0
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 22th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
150,0
segment 21 (mm)
100,0
Deflection
50,0
0,0
-50,0
-100,0
-150,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 22th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 120 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
22' (mm)
-40,0
-60,0
-80,0
-100,0
-120,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 23th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -62,1 -103,5
80% -54,0 -90,1
100% -50,2 -83,7
130% -45,6 -76,0
200% -38,0 -63,4
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
22 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 23th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -68,8 -114,9
80% -60,1 -100,2
100% -55,8 -93,1
130% -50,7 -84,5
200% -42,0 -70,0
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 121 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
150,0
Deflection segment
100,0
50,0
23' (mm)
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 24th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -72,8 61,3 -138,5 120,3 54,2 21,2
80% -62,6 56,7 -118,8 100,5 45,1 19,6
100% -57,8 54,1 -109,8 91,7 41,1 18,7
130% -52,3 50,5 -99,3 81,8 34,6 17,5
200% -43,3 43,7 -82,4 66,4 28,4 15,2
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
150,0
Deflection segment
100,0
50,0
23 (mm)
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 24th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -80,0 79,7 -150,0 120,7 54,5 23,7
80% -69,0 72,1 -129,5 102,1 45,9 21,9
100% -63,9 67,9 -119,9 93,7 42,0 20,9
130% -57,7 61,4 -108,6 84,0 35,6 20,6
200% -47,6 51,9 -90,0 68,6 29,4 17,6
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 122 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
24' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 25th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -69,5 -115,9
80% -60,8 -101,4
100% -56,7 -94,5
130% -51,8 -86,4
200% -43,7 -72,8
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
24 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 25th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -75,1 -125,4
80% -66,0 -110,1
100% -61,6 -102,7
130% -56,3 -93,9
200% -47,4 -79,0
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 123 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
24' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 25th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -69,5 -115,9
80% -60,8 -101,4
100% -56,7 -94,5
130% -51,8 -86,4
200% -43,7 -72,8
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
24 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 25th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -75,1 -125,4
80% -66,0 -110,1
100% -61,6 -102,7
130% -56,3 -93,9
200% -47,4 -79,0
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 124 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
26' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 27th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -75,0 -125,1
80% -66,1 -110,2
100% -61,9 -103,2
130% -56,9 -94,9
200% -48,7 -81,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
26 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 27th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -79,6 -132,9
80% -70,4 -117,4
100% -66,0 -110,1
130% -60,8 -101,4
200% -52,0 -86,7
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 125 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment
150,0
100,0
27' (mm)
50,0
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 28th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -86,9 68,8 -164,5 143,3 62,3 19,4
80% -75,6 64,7 -142,6 119,6 54,8 18,4
100% -70,5 62,3 -132,7 110,3 50,3 17,8
130% -64,5 58,9 -121,4 99,7 45,3 16,9
200% -54,7 52,3 -103,1 83,2 37,7 15,2
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment
150,0
100,0
27 (mm)
50,0
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 28th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -91,7 79,8 -171,9 143,3 62,4 23,2
80% -80,1 74,3 -149,7 120,5 55,3 21,8
100% -74,8 71,1 -139,7 111,5 51,0 21,1
130% -68,5 66,8 -128,1 101,3 46,1 18,3
200% -58,2 58,7 -109,1 85,1 38,6 16,5
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 126 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
28' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 29th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -76,5 -127,7
80% -68,2 -113,7
100% -64,2 -107,1
130% -59,6 -99,3
200% -51,7 -86,2
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
28 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
-160,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 29th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -80,0 -133,6
80% -71,4 -119,2
100% -67,4 -112,5
130% -62,6 -104,5
200% -54,5 -90,9
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 127 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 29' (mm) 200,0
150,0
100,0
Deflection
50,0
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 30th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
segment 29 (mm)
100,0
Deflection
0,0
-100,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 30th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 128 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
30' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
-160,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 31th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -77,9 -145,0
80% -70,0 -130,1
100% -66,2 -123,1
130% -61,8 -114,9
200% -54,4 -101,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
30 (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
-160,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 31th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -80,5 -149,9
80% -72,4 -134,8
100% -68,7 -127,7
130% -64,2 -119,4
200% -56,6 -105,3
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 129 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment
150,0
100,0
31' (mm)
50,0
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 32th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -89,6 72,4 -170,5 140,3 64,7 21,1
80% -79,4 68,4 -150,6 121,6 55,7 20,1
100% -74,8 66,1 -141,6 113,3 51,8 19,6
130% -69,4 62,1 -131,3 103,9 47,4 19,9
200% -60,6 56,5 -114,7 89,1 40,5 18,3
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment
150,0
100,0
31 (mm)
50,0
0,0
-50,0
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 32th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -92,2 78,0 -174,9 140,4 64,8 22,0
80% -81,9 73,4 -154,9 122,1 56,0 21,0
100% -77,3 70,9 -146,0 114,0 52,2 20,5
130% -71,9 67,7 -135,7 104,8 47,9 19,7
200% -62,9 60,3 -118,9 90,4 41,2 19,2
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 130 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-20,0
-40,0
32' (mm)
-60,0
-80,0
-100,0
-120,0
-140,0
-160,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 33th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -80,9 -150,4
80% -72,8 -135,4
100% -69,1 -128,5
130% -64,7 -120,3
200% -57,5 -106,8
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
32 (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 33th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -82,8 -154,1
80% -74,7 -139,0
100% -71,0 -132,0
130% -66,6 -123,9
200% -59,3 -110,2
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 131 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 33' (mm) 200,0
100,0
Deflection
0,0
-100,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 34th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
segment 33 (mm)
100,0
Deflection
0,0
-100,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 34th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 132 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
34' (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 35th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -84,2 -156,8
80% -76,0 -141,3
100% -72,2 -134,3
130% -67,8 -126,1
200% -60,6 -112,6
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
34 (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 35th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -85,6 -159,4
80% -77,4 -144,0
100% -73,6 -137,0
130% -69,3 -128,8
200% -62,0 -115,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 133 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment 150,0
100,0
50,0
35' (mm)
0,0
-50,0
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 36th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -96,5 75,5 -185,1 148,1 68,3 23,1
80% -85,9 70,6 -164,0 128,4 59,0 23,2
100% -81,2 68,7 -154,7 119,8 54,9 22,6
130% -75,8 66,1 -144,3 110,2 50,5 21,8
200% -67,1 61,2 -127,6 95,5 43,7 20,2
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
150,0
Deflection segment
100,0
50,0
35 (mm)
0,0
-50,0
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 36th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -97,6 78,3 -186,4 147,5 68,1 27,8
80% -87,1 73,1 -165,7 128,3 58,9 27,7
100% -82,4 71,2 -156,7 119,9 55,0 26,8
130% -77,1 68,6 -146,4 110,6 50,7 25,8
200% -68,5 63,5 -130,1 96,2 44,0 23,8
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 134 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
36' (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 37th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -88,7 -165,2
80% -80,0 -148,8
100% -76,0 -141,4
130% -71,5 -132,9
200% -64,1 -119,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
36 (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 37th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -89,8 -167,5
80% -81,1 -151,1
100% -77,2 -143,7
130% -72,6 -135,2
200% -65,3 -121,5
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 135 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 37' (mm) 200,0
100,0
Deflection
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 38th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
segment 37 (mm)
100,0
Deflection
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 38th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 136 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
38' (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 39th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -94,9 -176,8
80% -85,3 -158,7
100% -81,0 -150,7
130% -76,1 -141,5
200% -68,2 -126,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
38 (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 39th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -95,6 -178,2
80% -86,0 -160,2
100% -81,8 -152,3
130% -77,0 -143,2
200% -69,2 -128,8
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 137 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
Deflection segment 150,0
100,0
50,0
39' (mm)
0,0
-50,0
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 40th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -108,2 74,7 -210,5 158,8 73,7 28,5
80% -96,0 71,9 -185,7 137,0 63,3 27,2
100% -90,6 70,2 -175,0 127,5 58,9 26,5
130% -84,6 68,1 -163,1 117,2 54,1 25,6
200% -75,2 63,7 -144,8 101,6 44,4 23,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
150,0
Deflection segment
100,0
50,0
39 (mm)
0,0
-50,0
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 40th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -109,1 75,5 -213,5 159,8 74,3 25,1
80% -96,9 72,9 -188,3 137,8 63,8 24,0
100% -91,5 71,3 -177,5 128,3 59,3 23,5
130% -85,6 69,2 -165,6 117,9 54,5 22,8
200% -76,3 65,0 -147,2 102,4 44,8 21,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 138 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
40' (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 41th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -100,5 -187,8
80% -90,2 -168,1
100% -85,6 -159,5
130% -80,4 -149,7
200% -72,2 -134,3
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
40 (mm)
-100,0
-150,0
-200,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 41th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -100,9 -188,2
80% -90,6 -168,9
100% -86,1 -160,4
130% -81,0 -150,8
200% -72,9 -135,6
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 139 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 41' (mm) 200,0
100,0
Deflection
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 42th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
200,0
segment 41 (mm)
100,0
Deflection
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 42th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 140 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
42' (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 43th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -109,8 -205,7
80% -98,0 -183,3
100% -92,8 -173,6
130% -87,0 -162,6
200% -77,9 -145,5
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
42 (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 43th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -109,9 -206,0
80% -98,3 -183,9
100% -93,2 -174,3
130% -87,5 -163,5
200% -78,5 -146,7
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 141 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
300,0
Deflection segment
200,0
100,0
43' (mm)
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 44th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -125,3 89,3 -248,8 197,1 90,9 31,7
80% -110,2 85,9 -217,3 168,3 73,3 30,5
100% -103,8 83,9 -203,9 156,0 68,3 29,8
130% -96,6 81,3 -189,3 142,6 62,8 28,8
200% -85,7 76,4 -167,3 120,7 56,8 27,1
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
300,0
Deflection segment
200,0
100,0
43 (mm)
0,0
-100,0
-200,0
-300,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 44th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -125,2 89,5 -248,9 197,0 90,9 31,8
80% -110,4 86,3 -217,8 168,3 73,3 30,6
100% -104,1 84,5 -204,7 156,0 68,4 29,9
130% -97,0 82,0 -190,2 142,7 62,9 29,0
200% -86,3 77,2 -168,6 121,0 56,9 27,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 142 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
44' (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 45th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -120,4 -201,6
80% -107,0 -178,8
100% -101,1 -168,9
130% -94,5 -157,9
200% -84,4 -140,9
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
44 (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 45th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -120,3 -201,5
80% -107,1 -179,1
100% -101,3 -169,3
130% -94,8 -158,4
200% -84,9 -141,7
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 143 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
segment 45' (mm) 300,0
200,0
Deflection
100,0
0,0
-100,0
-200,0
-300,0
-400,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 46th segment
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
300,0
segment 45 (mm)
200,0
Deflection
100,0
0,0
-100,0
-200,0
-300,0
-400,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 46th segment
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 144 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
46' (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 47th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -129,5 -216,8
80% -114,9 -192,1
100% -108,5 -181,3
130% -101,3 -169,3
200% -90,4 -150,8
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
46 (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 47th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -129,2 -216,4
80% -114,8 -192,1
100% -108,5 -181,5
130% -101,5 -169,6
200% -90,7 -151,4
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 145 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
300,0
Deflection segment
200,0
100,0
47' (mm)
0,0
-100,0
-200,0
-300,0
-400,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 48th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -147,0 120,7 -293,7 259,0 121,8 42,4
80% -128,7 114,3 -255,0 220,4 103,4 40,1
100% -120,8 111,1 -238,7 203,9 95,6 39,0
130% -112,1 107,1 -220,8 185,8 82,6 37,7
200% -99,0 100,1 -194,3 159,4 71,5 35,2
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
300,0
Deflection segment
200,0
100,0
47 (mm)
0,0
-100,0
-200,0
-300,0
-400,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 48th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Side Cable - 1 Pouring Main Cable - 1 Main Cable - 2 Side Cable - 2
50% -146,6 119,7 -293,2 259,2 121,8 40,9
80% -128,6 113,9 -255,0 220,5 103,4 38,9
100% -120,8 110,8 -238,9 204,0 95,7 37,8
130% -112,3 107,1 -221,3 186,0 82,7 36,6
200% -99,4 100,4 -195,1 159,7 71,7 34,3
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 146 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
-100,0
48' (mm)
-150,0
-200,0
-250,0
-300,0
-350,0
-400,0
Deflection calculated with absolute convention - Shivpuri Side - casting of 49th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -137,8 -367,9
80% -122,3 -326,5
100% -115,5 -308,2
130% -107,8 -287,8
200% -96,1 -256,5
Equation
(x = Edesign / Edeck)
E_deck variation
Edesign/E_deck
0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2
0,0
Deflection segment
-50,0
48 (mm)
-100,0
-150,0
-200,0
-250,0
Deflection calculated with absolute convention - Chittorgarh Side - casting of 49th segment
Deflection at end of cantilever (mm)
E_deck / E_design
Form Traveler Pouring
50% -128,7 -215,1
80% -114,6 -191,4
100% -108,4 -180,9
130% -101,4 -169,1
200% -90,6 -151,1
Equation
(x = Edesign / Edeck)
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 147 / 169
Issue 7 KOTA BYPASS
Issue 7
Ref : A104/R/MB/SD/524-12
1400.000
1000.000
Humidity = 50%
800.000
600.000
KOTA BYPASS
400.000
200.000
0.000
0.00 25.00 50.00 75.00 100.00
Measured actual strain 5 days (report dated 04.2012) Theoretical creep strain 5 days - Actual temp / humidity Age of
concrete after
Measured actual strain 28 days (report dated 04.2012) Theoretical creep strain 28 days - Actual temp / humidity
loading (days)
Measured actual strain 90 days (report dated 04.2012) Theoretical creep strain 90 days - Actual temp / humidity
Page 148 / 169
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
• Stay cables for B-type segments are tensioned at the following dates:
o day 9 for first tensioning of the stay anchored to the lateral span
o day 13 for tensioning of the stay anchored to the central span
o day 14 for 2nd tensioning of the stay anchored to the lateral span
• Actual concreting dates of segments S1’ to S36’ have been considered and actual
concreting dates of segments S1 to S38 have been considered.
Planning used in the model for construction of both lateral spans, as expected, is given
below. Creep and shrinkage effects of each portion of lateral spans cast from 2015 are
calculated as per the casting dates of various stages.
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 149 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 150 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 151 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 152 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 153 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 154 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 155 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 156 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 157 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 158 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 159 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 160 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 161 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 162 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 163 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 164 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 165 / 169
Issue 7 KOTA BYPASS
Cable Stayed Bridge across River Chambal, India
Work Programme (Rev.14.3)
ID WBS Task Name Duration Start Finish Total Slack Half 2011, Half 2012, Half 2012, Half 2013, Half 2013, Half 2014, Half 2014, Half 2015, Half 2015, Half 2016, Half 2016, Half 2017, Half 2017,
AM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A S
1 1 Cable Stayed Bridge across River Chambal 2101 days 2011-08-31 2017-05-31 0 days
2 1.1 Design 46 days 2016-09-15 2016-10-30 0 days
3 1.1.1 Remaining Drawings to be approved by Proof Check Consultant 46 days 2016-09-15 2016-10-30 0 days
4 1.1.1.1 Revised Drawings for Key Segment 21 days 2016-09-15 2016-10-05 0 days
5 1.1.1.1.1 Submission 0 days 2016-09-15 2016-09-15 0 days 09-15
6 1.1.1.1.2 Review / Approval of Proof Check Consultant 21 days 2016-09-15 2016-10-05 89 days 09-15 10-05
7 1.1.1.2 Revised Drawings for Reinforcement at Pier Caps P6 and P7 21 days 2016-09-15 2016-10-05 123 days
8 1.1.1.2.1 Submission 0 days 2016-09-15 2016-09-15 123 days 09-15
9 1.1.1.2.2 Review / Approval of Proof Check Consultant 21 days 2016-09-15 2016-10-05 123 days 09-15 10-05
10 1.1.1.3 Updated Geometry Control Report 21 days 2016-10-10 2016-10-30 72 days
11 1.1.1.3.1 Submission 0 days 2016-10-10 2016-10-10 72 days 10-10
12 1.1.1.3.2 Review / Approval of Proof Check Consultant 21 days 2016-10-10 2016-10-30 72 days 10-10 10-30
13 1.2 Procurement 1855 days 2012-03-01 2017-03-29 9 days
14 1.2.1 Hand-over of Equipment and Materials by Gammon to Hyundai 157 days 2014-06-05 2014-11-08 0 days 06-05 11-08
15 1.2.2 Subcontractor for Repair of P5-P6-P7 and PT Work for Lateral Spans 109 days 2014-11-19 2015-03-07 0 days
16 1.2.2.1 Novation of Subcontract with Freyssinet by Gammon to Hyundai 49 days 2014-11-19 2015-01-06 0 days 11-19 01-06
17 1.2.2.2 Re-mobilization of Subcontractor's Site Team & Equipment 60 days 2015-01-07 2015-03-07 0 days 01-07 03-07
18 1.2.3 Bearings for P3 1 day 2014-07-26 2014-07-26 0 days
19 1.2.3.1 Delievery at Site by Gammon 1 day 2014-07-26 2014-07-26 0 days 07-26 07-26
20 1.2.4 Bearings for P1, P2 and P8 175 days 2014-10-28 2015-04-20 0 days
21 1.2.4.1 Purchase Order by Hyundai 1 day 2014-10-28 2014-10-28 0 days 10-28 10-28
22 1.2.4.2 Revised Manufacturer's Design 55 days 2014-10-29 2014-12-22 0 days 10-29 12-22
23 1.2.4.3 Manufacturing and Transportation 174 days 2014-10-29 2015-04-20 0 days 10-29 04-20
24 1.2.4.4 Delivery at Site 1 day 2015-04-20 2015-04-20 0 days 04-20 04-20
25 1.2.5 Bearings for P6 and P7 326 days 2015-08-19 2016-07-09 0 days
26 1.2.5.1 Purchase Order 1 day 2015-08-19 2015-08-19 0 days 08-19 08-19
27 1.2.5.2 Detailed Design 84 days 2015-10-23 2016-01-14 0 days 10-23 01-14
28 1.2.5.3 Manufacturing, Transportation and Delivery at Site 159 days 2016-02-02 2016-07-09 0 days 02-02 07-09
29 1.2.6 Expansion Joints for P1 and P8 1772 days 2012-03-01 2017-01-05 92 days
30 1.2.6.1 Detailed Design 0 days 2012-03-01 2012-03-01 0 days 03-01
31 1.2.6.2 Manufacturing, Transportation and Delivery at Site 210 days 2016-06-10 2017-01-05 92 days 06-10 01-05
32 1.2.7 Expansion Joints for Access Bridges 88 days 2016-10-10 2017-01-05 85 days
33 1.2.7.1 Detailed Design submission 0 days 2016-10-10 2016-10-10 85 days 10-10
34 1.2.7.2 Manufacturing, Transportation and Delivery at Site 62 days 2016-11-05 2017-01-05 85 days 11-05 01-05
35 1.2.8 Instrumentatioin 293 days 2016-06-10 2017-03-29 3 days
36 1.2.8.1 Purchase Order 1 day 2016-06-10 2016-06-10 0 days 06-10 06-10
37 1.2.8.2 Method Statement / Work Plan 0 days 2016-10-01 2016-10-01 0 days 10-01
38 1.2.8.3 Manufacturing, Transportation and Delivery at Site 180 days 2016-10-01 2017-03-29 3 days 10-01 03-29
39 1.3 Construction 1988 days 2011-08-31 2017-02-07 113 days
40 1.3.1 Main Bridge P4 Side 1949 days 2011-08-31 2016-12-30 152 days
41 1.3.1.1 Foundation & Substructure 1397 days 2011-08-31 2015-06-27 0 days
42 1.3.1.1.1 Pier P3 1045 days 2011-10-07 2014-08-16 0 days
43 1.3.1.1.1.1 In-situ Threading in Projected Rebars 5 days 2011-10-07 2011-10-11 0 days 10-07 10-11
44 1.3.1.1.1.2 1st Lift - Reinforcement Work 13 days 2011-11-07 2011-11-19 0 days 11-07 11-19
45 1.3.1.1.1.3 1st Lift - Shuttering Work 3 days 2011-12-08 2011-12-10 0 days 12-08 12-10
46 1.3.1.1.1.4 1st Lift - Concreting 1 day 2011-12-30 2011-12-30 0 days 12-30 12-30
47 1.3.1.1.1.5 2nd Lift - Reinforcement Work 3 days 2012-01-05 2012-01-07 0 days 01-05 01-07
48 1.3.1.1.1.6 2nd Lift - Shuttering Work 3 days 2012-01-15 2012-01-17 0 days 01-15 01-17
49 1.3.1.1.1.7 2nd Lift - Concreting 1 day 2012-01-18 2012-01-18 0 days 01-18 01-18
50 1.3.1.1.1.8 3rd Lift - Reinforcement Work 3 days 2012-02-02 2012-02-04 0 days 02-02 02-04
51 1.3.1.1.1.9 3rd Lift - Shuttering Work 2 days 2012-02-05 2012-02-06 0 days 02-05 02-06
52 1.3.1.1.1.10 3rd Lift - Concreting 1 day 2012-02-07 2012-02-07 0 days 02-07 02-07
53 1.3.1.1.1.11 4th Lift - Reinforcement Work 4 days 2012-02-15 2012-02-18 0 days 02-15 02-18
54 1.3.1.1.1.12 4th Lift - Shuttering Work 2 days 2012-02-23 2012-02-24 0 days 02-23 02-24
55 1.3.1.1.1.13 4th Lift - Concreting 1 day 2012-03-10 2012-03-10 0 days 03-10 03-10
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 166 / 169
Issue 7 KOTA BYPASS
Project : CHAMBAL RIVER BRIDGE Ref : A104/GCOA/IN/1190-16
Date : 14/03/2016
Letter: Hyundai’s email of 8h February 2016
Page : 1 / 8
To : H. K. Kang
Chief Project Manager
M/s. Hyundai Engineering & Construction Co. Ltd.- Gammon India Ltd. (JV)
Behind Tilam Sangh, Rawat Bhata Road
Kota- Rajasthan
We write in response to Hyundai’s email dated 8th February 2016 regarding survey of
cantilever at P5 side, and discussions held on the same subject in February and March
2016.
As per survey data received from Hyundai, the profile of deck cantilever at P5 side has
been modified between casting of S16’ segment (in 2009) and current situation. The
comparison of deck profiles (after corrections for temperature and loads) is shown in
graph below.
313.000
420 427 434 441 448 455 462 469 476 483 490 497 504 511 518 525
312.900
312.800
End of
S15'
End of
312.700
S16'
Altitudes(m)
Theoretical altitude at top of concrete
312.600
End
After S15 of S8'
312.500
Before sandbag removal
312.300
312.200
Chittorgarh Shivpuri
312.100
Distance from axis of pier(m)
DISTRIBUTION LIST
J.C. VOLLERY I V.MAUVISSEAU I
S. MONTENS I P. JAIN I
OTHERS
HDEC-GIL JV A
A (for Action) – O (for Observation) – I (for Information)
A global lowering of cantilever from segment S9’ to S16’ is observed, whereas the deck
altitude between pier segment and segment S8’ is close to deck altitude of 2009.
The theoretical profile shown in above graph is the profile which should be reached at
current stage to ensure the deck profile would be perfectly as per project profile at the
end of the construction (this profile is also called “expected profile”).
It is to be noted that at the time of casting of segments S1’ to S16’, the construction
planning was different since these segments were cast before the accident occurred.
Therefore, it is not surprising that the actual profile at current stage does not match the
expected profile.
As per the survey data, the difference between actual profile and expected profile at the
end of segment S16’ (after correction for temperatures and loads) is -75mm (actual profile
lower than expected profile). The maximum positive difference is observed at end of
segment S8’ with a +48mm difference.
It is expected that retensioning of stay cables will bring the cantilever upwards and reduce
the difference between actual and expected profiles for segment S16’. However it is
expected that this operation will also bring S8’ segment upwards, thus increasing the
difference at this location.
Therefore, the stay cable retensioning operations shall maximize the vertical
displacement at S16’ location without increasing too much the vertical displacement at
S8’ location.
In order to avoid any additional bending moment in P5 pylon, stay cable forces applied
during retensioning operations are considered identical for main side and lateral side
cables.
The effect of stay cable retensioning on deck profile has been studied.
An increase of tension of 1000kN for each pair of stay cables at current stage was
considered in the model and the impact on deck profile was observed. As per results, the
following can be deduced:
- Retensioning of any pair of stay cables brings the whole cantilever upwards (from
S1’ to S16’),
- The more the distance of stay cable anchorage from pier segment axis, the more
the vertical displacement at end of segment S16’ (for same retensioning force),
- The more stay cable anchorage is far from pier segment axis, the more the profile
bends upwards, which means the ratio of vertical displacement of S16’ by vertical
displacement of S8’ is higher for retensioning of stay cables L04’ and M04’ than
for retensioning of stay cables L01’ and M01’.
These results are in conformity with the expected behavior of deck cantilever, embedded
at P5 pier segment location.
Since the target of stay cable retensioning is to bring the segment S16’ upwards while
reducing the impact at S8’ location, it is preferable to increase stay cable forces of L04’
and M04’ stay cables only.
A survey of stay cables has been provided by Hyundai on 7th March 2016. This survey was
performed at the stage after moving form traveler to position of segment S18’. Stay cable
forces after correction of temperature and loads, as received by Systra, are provided
hereafter:
Force correction due to temperature and construction loads effect
Measure When When When When When When When Corrected
d force temperatur temperature temperature temperature temperature concentrated distributed measured
Stay e of pylon is of deck is of stays is gradient of gradient of loads on the loads on the force
cable +20 +20 +10 deck is +6 pylon is +6 end of deck deck is
ID is 10 kN/m
(B) (C) (D) (E) (F) (G) 100 kN (I) (J)
(kN) (kN) (kN) (kN) (kN) (kN) (H)
(kN) (kN) (kN)
P5L01 3631 119 117 -133 100 -42 14 41 3518
P5M01 4201 108 96 -115 109 56 19 53 4123
P5L02 3869 103 138 -135 106 -52 15 41 3754
P5M02 4083 81 105 -105 139 54 22 57 4000
P5L03 4768 89 153 -136 109 -61 15 41 4653
P5M03 4460 62 113 -98 170 54 24 59 4370
P5L04 4965 79 166 -137 110 -69 15 40 4849
P5M04 4836 48 122 -95 206 57 27 61 4736
Based on the effects of retensioning for each pair of stay cable and stay cable survey
provided by Hyundai, it was decided to consider retensioning stay cables L04’ and M04’
to a target force of 5600kN (for each cable), for neutral conditions of temperature and
loads (i.e. 23.75°C in whole structure and no construction loads).
Graph below shows the impact of retensioning of each pair of stay cables, and the impact
of retensioning stay cables L04’ & M04’ to a force of 5600kN (for neutral conditions of
temperature and loads) at the current stage (site situation as of 14th March 2016). The
difference between expected and actual profile after retensioning operations are also
shown in below graph (in dark blue).
mm Displacements (mm)
80,0
60,0
40,0
20,0
0,0
455 462 469 476 483 490 497 504 511 518 525
-20,0
-40,0
-60,0
-80,0
Additional 1MN on M01' & L01' Additional 1MN on M02' & L02' Additional 1MN on M03' & L03' Additional 1MN on M04' & L04'
Total Force 5600kN in M04' & M04' Profile difference Profile difference after retensioning
Retensioning of stay cables L04’ & M04’ to 5600kN (under neutral conditions of
temperature and loads) would reduce the profile difference at end of segment S16’ to
53mm, while limiting the difference at S8’ location to 55mm.
Therefore a retensioning of stay cables to 5600kN is considered.
It is to be noted that stay cable tensions to be implemented after installation of SIDL are
not planned to be modified. Therefore, the drawing A104-DWG-MB-FD-970 rev 5A,
approved in ER letter OUT-4182, remains valid.
2. Impact on structure
The impact of stay cable retensioning on structure is checked hereafter for construction
stage and service stage.
Retensioning of stay cables L04’ & M04’ induces an increase of normal forces and bending
moments in deck cantilever. This will create a decrease of compression forces at bottom
fiber and increase of compression forces at top fiber.
0,40
0,20
Stresses (MPa)
0,00
350 385 420 455 490 525 560 595 630 665 700
-0,20
-0,40
-0,60
-0,80
Mid-span P5 P6 P7
Cantilever
Stresses Span P5-P6 Span P6-P7
(main span)
-0.68 -> 0 MPa -0.39 -> 0.20 MPa 0 -> 0.16 MPa
Bottom fiber Tension (mostly in Mostly tension / small Compression (mostly
first 10 segments) compression near P6 near P6)
0 -> 0.59 MPa
-0.14 -> 0.29 MPa -0.11 -> 0 MPa
Compression
Top fiber Mostly compression / Tension (mostly near
(mostly in first 10
small tension near P6 P6)
segments)
Stresses induced by the stay cable retensioning will remain in the structure until final stay
cable retensioning, at the end of construction. Therefore it is compared with envelope of
stresses during construction, after current stage.
i. Main span
For Span P5-P6, minimum stresses at bottom fiber are observed before tensioning stay
cables L01’ to L04’. At current stage these stay cables are already tensioned, therefore the
tensile stresses for remaining construction stages are limited. The graph below shows
stress envelope in bottom fiber of span P5-P6 during remaining construction stages.
Maximum tensile stress within span P5-P6 from current stage until end of construction is
1.36 MPa (near P6 pier segment), whereas bottom fiber remains in compression near P5
pier segment.
Retensioning of stay cables L04’ & M04’ produces a very small stress near P6 pier segment
and therefore it can be concluded that the maximum tensile stress would not be
significantly modified. Even if maximum tensile stress in span P5-P6 due to retensioning
operations (0.39 MPa) is added to the envelope of tensile stress, the maximum tensile
stress would not be greater than 1.36 + 0.39 = 1.75 MPa < 4.45 MPa (maximum allowable
tensile stress in lateral spans).
Therefore the stresses at bottom fiber of span P5-P6 remain within the allowable limits,
when considering retensioning operations at current stage.
Maximum stress at top fiber of span P5-P6 during construction is 10.25 MPa, as shown at
page 19/383 of Recalculation of the Entire Bridge (A104-R-MB-SD-506-12 issue 2).
Therefore an increase of 0.29 MPa would be acceptable, considering the compression
limit of 30 MPa (stress would remain below 10.54 MPa < 30 MPa).
Maximum stress at bottom fiber of span P6-P7 during construction is 11.11 MPa (with
local stress of 14.55 MPa at P6 pier segment), as shown at page 19/383 of Recalculation
of the Entire Bridge (A104-R-MB-SD-506-12 issue 2). Therefore an increase of 0.16 MPa
would have no impact on acceptability of stresses, considering the compression limit of
30 MPa.
Minimum stress at top fiber of span P6-P7 during construction is 2.29 MPa tensile stress
near P6 pier segment and no tensile stress away from P6 pier segment, as shown at page
19/383 of Recalculation of the Entire Bridge (A104-R-MB-SD-506-12 issue 2). Therefore
an increase of 0.11 MPa of tensile stress would have no impact on acceptability of
stresses, as maximum tensile stress would be 2.29 + 0.11 = 2.40 MPa < 4.45 MPa.
Stay cable tensions to be implemented after installation of SIDL are defined in drawing
A104-DWG-MB-FD-970 rev 5A.
Though the final stay cable tensions are not changed with respect to design calculations,
the stay cable forces implemented before and after stitching of the deck are modified (e.g.
more stay cable force is implemented before stitching and less force after stitching for
stay cables L04’ & M04’).
Since effects of stay cable tensioning on the free cantilever are different form the effect
of tensioning stay cables in the stitched deck, slight modifications of deck stresses under
permanent loads are expected locally. These possible modifications are checked
hereafter.
The graphs below show comparison of deck stresses under permanent loads with and
without considering retensioning operations.
Permanent loads before losses
25,00
Bottom Fiber before losses (retensioning)
Top Fiber before losses (retensioning)
Bottom Fiber before losses (design)
20,00
Top Fiber before losses (design)
15,00
10,00
5,00
0,00
0 100 200 300 400 500 600 700
-5,00
P4 P5
15,00
10,00
5,00
0,00
0 100 200 300 400 500 600 700
-5,00
P4 P5
As per the above, the impact of retensioning operations on stresses during service stage
is minor. Moreover the stress modifications are favorable, since the deck stresses under
permanent loads considering the retensioning operations are within the envelope of
stresses considered in design calculations.
Stresses verifications in service stage are shown in Longitudinal Deck Analysis in Service
stage report (A104-R-MB-SD-513-12 issue 1), pages 22 to 32. As per this report, governing
stresses between segment S27’ and P6 under Service load combinations are compression
stresses at bottom fiber and tension at top fiber.
Since the impact of retensioning operations is a reduction of compression at bottom fiber
and increase of compression at top fiber, retensioning operations are favorable regarding
stresses under Service Limit States.
In conclusion, a retensioning operation of stay cables L04’ and M04’ to achieve target
force of 5600kN in each cable (under neutral temperature and loads conditions) is
proposed in order to limit the profile difference at end of segment S16’ (P5 side).
This retensioning operation would have a minor impact on deck stresses. It was checked
that this minor impact is acceptable for deck stresses during construction. Moreover the
impact on deck stresses at service stage is favorable.
Best Regards,
M. MULS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 167 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON
KOTA BYPASS – GEOMETRY CONTROL
Ref : A104/R/MB/SD/524-12 CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON Page 168 / 169
Issue 7 KOTA BYPASS
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side -
Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler -
X (m)
Step 2: FT Step 3: FT Step 4: FT Step 5: FT Step 6: FT Step 7: FT Step 8: FT Step 9: FT Step 10: FT Step 11: FT Step 12: FT Step 13: FT Step 14: FT Step 15: FT Step 16: FT Step 17: FT
launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching
Position
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
P4 175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
178.5 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1
182 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.2 -0.2 -0.1
185.5 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.5 -0.4 -0.3 -0.3 -0.3 -0.3 -0.2
189 -0.9 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.7 -0.6 -0.5 -0.5 -0.4 -0.4 -0.3
192.5 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -0.9 -0.8 -0.6 -0.6 -0.5 -0.5 -0.4
196 -1.4 -1.4 -1.4 -1.4 -1.4 -1.2 -1.0 -0.8 -0.8 -0.6 -0.6 -0.5
199.5 -1.7 -1.7 -1.7 -1.7 -1.4 -1.3 -1.0 -1.0 -0.8 -0.8 -0.6
203 -2.1 -2.0 -2.0 -1.7 -1.5 -1.2 -1.2 -0.9 -1.0 -0.7
206.5 -2.4 -2.4 -2.0 -1.8 -1.4 -1.5 -1.1 -1.1 -0.9
210 -2.8 -2.3 -2.1 -1.7 -1.7 -1.3 -1.3 -1.0
segment 10 213.5 -2.7 -2.5 -2.0 -2.0 -1.6 -1.6 -1.2
217 -2.9 -2.3 -2.3 -1.8 -1.9 -1.4
220.5 -2.7 -2.7 -2.1 -2.2 -1.7
224 -3.1 -2.5 -2.5 -2.0
227.5 -2.9 -2.9 -2.3
231 -3.3 -2.6
234.5 -3.0
238
241.5
245
segment 20 248.5
252
255.5
259
262.5
266
269.5
273
276.5
280
segment 30 283.5
287
290.5
294
297.5
301
304.5
308
311.5
315
segment 40 318.5
322
325.5
329
332.5
336
339.5
343
346.5
segment 49 349.8
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side -
Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler -
X (m)
Step 18: FT Step 19: FT Step 20: FT Step 21: FT Step 22: FT Step 23: FT Step 24: FT Step 25: FT Step 26: FT Step 27: FT Step 28: FT Step 29: FT Step 30: FT Step 31: FT Step 32: FT Step 33: FT Step 34: FT
launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching
Position
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
P4 175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
178.5 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
182 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
185.5 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
189 -0.3 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 -0.1 0.0 0.0 0.0 0.0 0.0 0.0
192.5 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0
196 -0.5 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0
199.5 -0.6 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0
203 -0.7 -0.5 -0.5 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.0 0.0 0.1 0.1
206.5 -0.9 -0.7 -0.7 -0.5 -0.5 -0.3 -0.4 -0.2 -0.2 -0.1 -0.2 -0.1 -0.1 0.0 0.0 0.1 0.1
210 -1.0 -0.8 -0.8 -0.6 -0.6 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.1 0.1
segment 10 213.5 -1.2 -0.9 -0.9 -0.7 -0.7 -0.5 -0.5 -0.4 -0.4 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.1 0.1
217 -1.4 -1.1 -1.1 -0.8 -0.8 -0.6 -0.6 -0.4 -0.5 -0.3 -0.3 -0.1 -0.1 0.0 0.0 0.1 0.1
220.5 -1.7 -1.3 -1.3 -1.0 -1.0 -0.7 -0.8 -0.5 -0.6 -0.4 -0.4 -0.2 -0.2 0.0 -0.1 0.1 0.0
224 -2.0 -1.5 -1.5 -1.2 -1.2 -0.9 -0.9 -0.7 -0.7 -0.4 -0.5 -0.2 -0.3 -0.1 -0.1 0.0 0.0
227.5 -2.3 -1.8 -1.8 -1.4 -1.4 -1.1 -1.1 -0.8 -0.8 -0.6 -0.6 -0.3 -0.3 -0.1 -0.1 0.0 0.0
231 -2.6 -2.1 -2.1 -1.6 -1.7 -1.3 -1.3 -1.0 -1.0 -0.7 -0.7 -0.4 -0.4 -0.2 -0.2 0.0 0.0
234.5 -3.0 -2.4 -2.4 -1.9 -1.9 -1.5 -1.5 -1.2 -1.2 -0.8 -0.9 -0.5 -0.5 -0.3 -0.3 -0.1 -0.1
238 -3.5 -2.8 -2.8 -2.2 -2.2 -1.8 -1.8 -1.4 -1.4 -1.0 -1.0 -0.6 -0.7 -0.4 -0.4 -0.2 -0.2
241.5 -3.2 -3.2 -2.6 -2.6 -2.1 -2.1 -1.6 -1.7 -1.2 -1.2 -0.8 -0.8 -0.5 -0.5 -0.2 -0.3
245 -3.6 -2.9 -3.0 -2.4 -2.4 -1.9 -1.9 -1.4 -1.5 -1.0 -1.0 -0.6 -0.6 -0.3 -0.4
segment 20 248.5 -3.4 -3.4 -2.7 -2.8 -2.2 -2.2 -1.7 -1.7 -1.2 -1.2 -0.8 -0.8 -0.4 -0.5
252 -3.9 -3.1 -3.2 -2.5 -2.6 -2.0 -2.0 -1.4 -1.4 -0.9 -1.0 -0.6 -0.6
255.5 -3.6 -3.6 -2.9 -3.0 -2.3 -2.3 -1.6 -1.7 -1.1 -1.2 -0.7 -0.8
259 -4.1 -3.3 -3.4 -2.6 -2.7 -1.9 -2.0 -1.4 -1.4 -0.9 -1.0
262.5 -3.8 -3.8 -3.0 -3.1 -2.2 -2.3 -1.6 -1.7 -1.1 -1.2
266 -4.3 -3.4 -3.5 -2.6 -2.6 -1.9 -1.9 -1.4 -1.4
269.5 -3.9 -3.9 -3.0 -3.0 -2.2 -2.3 -1.6 -1.7
273 -4.5 -3.4 -3.4 -2.6 -2.6 -1.9 -1.9
276.5 -3.9 -3.9 -2.9 -3.0 -2.2 -2.3
280 -4.4 -3.4 -3.4 -2.6 -2.6
segment 30 283.5 -3.8 -3.9 -3.0 -3.0
287 -4.4 -3.4 -3.4
290.5 -3.9 -3.9
294 -4.4
297.5
301
304.5
308
311.5
315
segment 40 318.5
322
325.5
329
332.5
336
339.5
343
346.5
segment 49 349.8
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side - Chittorgarh side -
Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler -
X (m)
Step 35: FT Step 36: FT Step 37: FT Step 38: FT Step 39: FT Step 40: FT Step 41: FT Step 42: FT Step 43: FT Step 44: FT Step 45: FT Step 46: FT Step 47: FT Step 48: FT Step 49: FT
launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching
Position
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
P4 175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
178.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
182 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
185.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
189 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1
192.5 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
196 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
199.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
203 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
206.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2
210 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
segment 10 213.5 0.1 0.1 0.2 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
217 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
220.5 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3
224 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3
227.5 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3
231 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
234.5 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
238 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4
241.5 -0.1 -0.1 0.1 0.1 0.2 0.2 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4
245 -0.1 -0.1 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4
segment 20 248.5 -0.2 -0.2 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.4
252 -0.3 -0.3 -0.1 -0.1 0.0 0.0 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4
255.5 -0.4 -0.5 -0.2 -0.2 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.4
259 -0.6 -0.6 -0.3 -0.3 -0.1 -0.1 0.1 0.0 0.2 0.1 0.2 0.2 0.3 0.3 0.4
262.5 -0.7 -0.8 -0.4 -0.5 -0.2 -0.2 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.2 0.3
266 -0.9 -1.0 -0.6 -0.6 -0.3 -0.4 -0.1 -0.1 0.0 0.0 0.1 0.1 0.2 0.2 0.3
269.5 -1.2 -1.2 -0.8 -0.8 -0.5 -0.5 -0.2 -0.3 -0.1 -0.1 0.0 0.0 0.2 0.1 0.3
273 -1.4 -1.4 -1.0 -1.0 -0.6 -0.7 -0.4 -0.4 -0.2 -0.2 0.0 -0.1 0.1 0.1 0.2
276.5 -1.7 -1.7 -1.2 -1.2 -0.8 -0.8 -0.5 -0.5 -0.3 -0.3 -0.2 -0.2 0.0 0.0 0.2
280 -2.0 -2.0 -1.4 -1.5 -1.0 -1.1 -0.7 -0.7 -0.5 -0.5 -0.3 -0.3 -0.1 -0.1 0.1
segment 30 283.5 -2.3 -2.3 -1.7 -1.8 -1.3 -1.3 -0.9 -0.9 -0.6 -0.7 -0.4 -0.5 -0.2 -0.3 0.0
287 -2.7 -2.7 -2.0 -2.1 -1.5 -1.6 -1.1 -1.1 -0.8 -0.9 -0.6 -0.6 -0.4 -0.4 -0.1
290.5 -3.0 -3.1 -2.4 -2.4 -1.8 -1.9 -1.4 -1.4 -1.0 -1.1 -0.8 -0.8 -0.5 -0.6 -0.3
294 -3.5 -3.5 -2.8 -2.8 -2.1 -2.2 -1.6 -1.7 -1.3 -1.3 -1.0 -1.0 -0.7 -0.8 -0.4
297.5 -4.0 -4.0 -3.2 -3.2 -2.5 -2.6 -1.9 -2.0 -1.6 -1.6 -1.2 -1.3 -0.9 -1.0 -0.6
301 -4.6 -3.6 -3.7 -2.9 -2.9 -2.3 -2.3 -1.9 -1.9 -1.5 -1.5 -1.2 -1.2 -0.8
304.5 -4.1 -4.2 -3.3 -3.4 -2.7 -2.7 -2.2 -2.2 -1.8 -1.8 -1.4 -1.5 -1.0
308 -4.7 -3.8 -3.8 -3.1 -3.1 -2.5 -2.6 -2.1 -2.2 -1.7 -1.7 -1.2
311.5 -4.3 -4.3 -3.5 -3.6 -2.9 -3.0 -2.5 -2.5 -2.0 -2.1 -1.5
315 -4.9 -4.0 -4.0 -3.4 -3.4 -2.9 -2.9 -2.4 -2.4 -1.8
segment 40 318.5 -4.5 -4.5 -3.8 -3.9 -3.3 -3.3 -2.7 -2.8 -2.1
322 -5.1 -4.3 -4.4 -3.7 -3.8 -3.1 -3.2 -2.5
325.5 -4.9 -4.9 -4.2 -4.3 -3.6 -3.6 -2.9
329 -5.5 -4.7 -4.8 -4.0 -4.1 -3.3
332.5 -5.3 -5.4 -4.6 -4.6 -3.7
336 -6.0 -5.1 -5.2 -4.2
339.5 -5.7 -5.8 -4.7
343 -6.4 -5.3
346.5 -5.9
segment 49 349.8
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side -
Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler -
X (m)
Step 2': FT Step 3': FT Step 4': FT Step 5': FT Step 6': FT Step 7': FT Step 8': FT Step 9': FT Step 10': FT Step 11': FT Step 12': FT Step 13': FT Step 14': FT Step 15': FT Step 16': FT Step 17': FT Step 18': FT
launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching
Position
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
segment 49 350
353.5
357
360.5
364
367.5
371
374.5
378
segment 40 381.5
385
388.5
392
395.5
399
402.5
406
409.5
413
segment 30 416.5
420
423.5
427
430.5
434
437.5
441
444.5
448
segment 20 451.5
455
458.5
462 -3.2
465.5 -3.5 -2.7
469 -2.7 -3.0 -2.4
472.5 -2.3 -2.3 -2.6 -2.0
476 -2.4 -2.0 -2.0 -2.3 -1.7
479.5 -2.1 -2.0 -1.7 -1.7 -1.9 -1.5
483 -2.1 -1.7 -1.7 -1.4 -1.4 -1.6 -1.2
segment 10 486.5 -1.8 -1.7 -1.4 -1.4 -1.2 -1.2 -1.4 -1.0
490 -1.7 -1.5 -1.4 -1.2 -1.2 -1.0 -1.0 -1.2 -0.8
493.5 -1.5 -1.4 -1.2 -1.2 -1.0 -1.0 -0.8 -0.8 -1.0 -0.7
497 -1.2 -1.2 -1.2 -1.0 -1.0 -0.8 -0.8 -0.7 -0.7 -0.8 -0.6
500.5 -1.0 -0.9 -0.9 -0.9 -0.8 -0.8 -0.6 -0.6 -0.5 -0.5 -0.6 -0.4
504 -0.8 -0.7 -0.7 -0.7 -0.7 -0.6 -0.6 -0.5 -0.5 -0.4 -0.4 -0.5 -0.3
507.5 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.5 -0.5 -0.4 -0.4 -0.3 -0.3 -0.4 -0.3
511 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.3 -0.3 -0.3 -0.2 -0.2 -0.3 -0.2
514.5 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.1
518 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1
521.5 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 -0.1 0.0
P5 525 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side - Shivpuri side -
Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler - Form traveler -
X (m)
Step 19': FT Step 20': FT Step 21': FT Step 22': FT Step 23': FT Step 24': FT Step 25': FT Step 26': FT Step 27': FT Step 28': FT Step 29': FT Step 30': FT Step 31': FT Step 32': FT Step 33': FT Step 34': FT Step 35': FT
launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching launching
Position
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
segment 49 350
353.5
357
360.5
364
367.5
371
374.5
378
segment 40 381.5
385
388.5
392
395.5
399
402.5 -4.0
406 -4.4 -3.5
409.5 -3.8 -3.9 -3.0
413 -4.3 -3.4 -3.4 -2.6
segment 30 416.5 -3.8 -3.8 -2.9 -3.0 -2.3
420 -4.3 -3.3 -3.4 -2.6 -2.6 -1.9
423.5 -3.8 -3.8 -2.9 -3.0 -2.2 -2.2 -1.7
427 -4.4 -3.3 -3.4 -2.5 -2.6 -1.9 -1.9 -1.4
430.5 -3.8 -3.8 -2.9 -3.0 -2.2 -2.2 -1.6 -1.6 -1.1
434 -4.2 -3.3 -3.4 -2.5 -2.6 -1.9 -1.9 -1.3 -1.4 -0.9
437.5 -3.7 -3.7 -2.9 -3.0 -2.2 -2.2 -1.6 -1.6 -1.1 -1.1 -0.7
441 -3.9 -3.2 -3.2 -2.5 -2.6 -1.9 -1.9 -1.3 -1.4 -0.9 -0.9 -0.6
444.5 -3.4 -3.4 -2.8 -2.8 -2.2 -2.2 -1.6 -1.6 -1.1 -1.1 -0.7 -0.7 -0.4
448 -3.6 -3.0 -3.0 -2.4 -2.5 -1.9 -1.9 -1.3 -1.4 -0.9 -0.9 -0.6 -0.6 -0.3
segment 20 451.5 -3.1 -3.1 -2.6 -2.6 -2.1 -2.1 -1.6 -1.6 -1.1 -1.2 -0.7 -0.8 -0.4 -0.5 -0.2
455 -3.3 -2.7 -2.7 -2.2 -2.2 -1.8 -1.8 -1.4 -1.4 -0.9 -1.0 -0.6 -0.6 -0.3 -0.3 -0.1
458.5 -2.9 -2.8 -2.3 -2.4 -1.9 -1.9 -1.5 -1.5 -1.1 -1.2 -0.7 -0.8 -0.5 -0.5 -0.2 -0.2 -0.1
462 -2.5 -2.5 -2.0 -2.0 -1.6 -1.6 -1.3 -1.3 -0.9 -1.0 -0.6 -0.6 -0.3 -0.4 -0.1 -0.2 0.0
465.5 -2.1 -2.1 -1.7 -1.7 -1.4 -1.4 -1.1 -1.1 -0.8 -0.8 -0.5 -0.5 -0.2 -0.3 -0.1 -0.1 0.0
469 -1.8 -1.8 -1.4 -1.5 -1.1 -1.2 -0.9 -0.9 -0.6 -0.6 -0.4 -0.4 -0.2 -0.2 0.0 0.0 0.1
472.5 -1.5 -1.5 -1.2 -1.2 -0.9 -1.0 -0.7 -0.7 -0.5 -0.5 -0.3 -0.3 -0.1 -0.1 0.0 0.0 0.1
476 -1.3 -1.3 -1.0 -1.0 -0.8 -0.8 -0.6 -0.6 -0.4 -0.4 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.1
479.5 -1.1 -1.1 -0.8 -0.8 -0.6 -0.6 -0.5 -0.5 -0.3 -0.3 -0.1 -0.2 0.0 0.0 0.1 0.1 0.1
483 -0.9 -0.9 -0.7 -0.7 -0.5 -0.5 -0.4 -0.4 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.1 0.1 0.1
segment 10 486.5 -0.7 -0.7 -0.6 -0.6 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.1 0.1 0.1
490 -0.6 -0.6 -0.4 -0.5 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1
493.5 -0.5 -0.5 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1
497 -0.4 -0.4 -0.3 -0.3 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1
500.5 -0.3 -0.3 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1
504 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1
507.5 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
511 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
514.5 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
518 -0.1 -0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
521.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P5 525 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS – GEOMETRY CONTROL
∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm) ∆Z (mm)
Ref : A104/R/MB/SD/524-12
CABLE STAYED BRIDGE ACROSS CHAMBAL RIVER ON KOTA BYPASS Appendix 12