ACTIVITY CODE ACTIVITY DISCRIPTION PRED DURATION

B1 A MACHINE EXCAVATION:

B1 A1 SAND

B1 A2 EXCAVATION AND BACKFILL B1 A1

B1 FORM WORKS INSTALLATION

B1 A3 RC FOOTING

PC FOOTING

B1 A5 BEAMS B1 A4

B1 A6 COLUMN B1 A5

B1 CONCRETE AND REBAR WORKS B1 A6

B1 PLACING CONCRETE:

B1 A8 COLUMNS B1 A7

B1 A9 RC FOOTING B1 A8

B1 A10 PC FOOTING B1 A9
B1 REBAR WORKS: B1 A10

B1 A12 FOOTING B1 A11

BASMENT 01 B1 A12

B1 FORM WORKS INSTALLATION

B1 B3 BEAMS

B1 B4 COLUMN

B1 C CONCRETE AND REBAR WORKS B1 B1

B1 C1 PLACING CONCRETE: B1 B2

B1 C2 SLAB ON FILL B1 B3

B1 C3 COLUMNS B1 B4
B1 REBAR WORKS: B1 C2

B1 C6 FLR. INSTALLATION B1 C3

B1 D TRADE MASONRY WORKS B1 C5

B1 D1 GROUTING and TOL PLASTERING B1

B1 D7 CONC. BLOCK INT. WALL B1 D3

B1 D9 PLASTER WALL AND CEILING B1 D5

B1 E DOORS AND WINDOWS B1 D6

B1 E1 W-PANEL INSTALLATION B1 D7
B1 E2 STEEL WINDOWS INSTALLATION B1 D8

B1 E3 LOUVER WINDOWS INSTALLATION: B1 D9

B1 E4 FIXED ASBESTOS B1 E

B1 E5 FIXED METAL LOUVERS B1 E1

B1 E6 FIXED GI SHEETS B1 E2

B1 E7 FIXED GLASS B1 E3

B1 E8 FIXED WOODEN B1 E4

B1 E9 ALUMINUM FRAME WINDOWS B1 E5

B1 E10 SLIDING GLASS DOOR B1 E6

B1 E11 HOLLOW METAL DOOR B1 E7

B1 E8

B2 B BASEMENT 02 B1 E9

B2 FORM WORKS INSTALLATION B1 E10


B2 B3 BEAMS B2 B

B2 B4 COLUMN B2

B2 C CONCRETE AND REBAR WORKS B2 B1

B2 C1 PLACING CONCRETE: B2 B2

B2 C2 SLABS B2 B3

B2 C3 COLUMNS B2 B4

B2 REBAR WORKS: B2 C2

SALB

COLUMNS

B2 D TRADE MASONRY WORKS B2 C5

B2 D1 GROUTING and TOL PLASTERING B2

B2 C6

B2 C7
B2 D

B2 D1

B2 D2

B2 D7 CONC. BLOCK INT. WALL B2 D3

B2 D8 CONC. BLOCK EXT. WALL B2 D4

B2 D9 PLASTER WALL AND CEILING B2 D5

B2 E DOORS AND WINDOWS B2 D6

B2 E1 W-PANEL INSTALLATION B2 D7

B2 E2 STEEL WINDOWS INSTALLATION B2 D8

B2 E3 LOUVER WINDOWS INSTALLATION: B2 D9

B2 E4 FIXED ASBESTOS B2 E

B2 E5 FIXED METAL LOUVERS B2 E1

B2 E6 FIXED GI SHEETS B2 E2

B2 E7 FIXED GLASS B2 E3

B2 E8 FIXED WOODEN B2 E4
B2 E9 ALUMINUM FRAME WINDOWS B2 E5

B2 E10 SLIDING GLASS DOOR B2 E6

B2 E11 HOLLOW METAL DOOR B2 E7

B2 E8

F1 B FIRST FLOOR B2 E9

F1 FORM WORKS INSTALLATION B2 E10

F1 B1 WALL ON THE GROUND B2 E11

F1 B2 WALL ABOVER GROUND

F1 B3 BEAMS F1 B

F1 B4 COLUMN F1

F1 C CONCRETE AND REBAR WORKS F1 B1

F1 C1 PLACING CONCRETE: F1 B2

F1 C2 SLABS F1 B3

F1 C3 COLUMNS F1 B4

F1 C4 FLR FINISH UNHARDENED F1 C


F1 C5 CONC. FINISH HARDENED F1 C1

F1 REBAR WORKS: F1 C2

F1 C6 GROUND FLR. INSTALLATION F1 C3

F1 C7 UPPER FLR. INSTALLATION F1 C4

F1 D TRADE MASONRY WORKS F1 C5

F1 D1 GROUTING and TOL PLASTERING F1

F1 D2 PEBBLE FINISHED F1 C6

F1 D3 MABLE INSTALLATION F1 C7

F1 D4 GLAZED TILES F1 D

F1 D5 UNGLAZED TILES F1 D1

F1 D6 GLAZED TILE WALL F1 D2

F1 D7 CONC. BLOCK INT. WALL F1 D3

F1 D8 CONC. BLOCK EXT. WALL F1 D4

F1 D9 PLASTER WALL AND CEILING F1 D5

F1 E DOORS AND WINDOWS F1 D6


F1 E1 W-PANEL INSTALLATION F1 D7

F1 E2 STEEL WINDOWS INSTALLATION F1 D8

F1 E3 LOUVER WINDOWS INSTALLATION: F1 D9

F1 E4 FIXED ASBESTOS F1 E

F1 E5 FIXED METAL LOUVERS F1 E1

F1 E6 FIXED GI SHEETS F1 E2

F1 E7 FIXED GLASS F1 E3

F1 E8 FIXED WOODEN F1 E4

F1 E9 ALUMINUM FRAME WINDOWS F1 E5

F1 E10 SLIDING GLASS DOOR F1 E6

F1 E11 HOLLOW METAL DOOR F1 E7

F1 E8

B SECOND FLOOR F1 E9

F2 FORM WORKS INSTALLATION F1 E10

F2 B1 WALL ON THE GROUND F1 E11


F2 B2 WALL ABOVER GROUND

F2 B3 BEAMS B

F2 B4 COLUMN F2

F2 C CONCRETE AND REBAR WORKS F2 B1

F2 C1 PLACING CONCRETE: F2 B2

F2 C2 SLABS F2 B3

F2 C3 COLUMNS F2 B4

F2 C4 FLR FINISH UNHARDENED F2 C

F2 C5 CONC. FINISH HARDENED F2 C1

F2 REBAR WORKS: F2 C2

F2 C6 GROUND FLR. INSTALLATION F2 C3

F2 C7 UPPER FLR. INSTALLATION F2 C4

F2 D TRADE MASONRY WORKS F2 C5

F2 D1 GROUTING and TOL PLASTERING F2

F2 D2 PEBBLE FINISHED F2 C6
F2 D3 MABLE INSTALLATION F2 C7

F2 D4 GLAZED TILES F2 D

F2 D5 UNGLAZED TILES F2 D1

F2 D6 GLAZED TILE WALL F2 D2

F2 D7 CONC. BLOCK INT. WALL F2 D3

F2 D8 CONC. BLOCK EXT. WALL F2 D4

F2 D9 PLASTER WALL AND CEILING F2 D5

F2 E DOORS AND WINDOWS F2 D6

F2 E1 W-PANEL INSTALLATION F2 D7

F2 E2 STEEL WINDOWS INSTALLATION F2 D8

F2 E3 LOUVER WINDOWS INSTALLATION: F2 D9

F2 E4 FIXED ASBESTOS F2 E

F2 E5 FIXED METAL LOUVERS F2 E1

F2 E6 FIXED GI SHEETS F2 E2

F2 E7 FIXED GLASS F2 E3
F2 E8 FIXED WOODEN F2 E4

F2 E9 ALUMINUM FRAME WINDOWS F2 E5

F2 E10 SLIDING GLASS DOOR F2 E6

F2 E11 HOLLOW METAL DOOR F2 E7

F2 E8

F3 B THIRD FLOOR F2 E9

F3 FORM WORKS INSTALLATION F2 E10

F3 B1 WALL ON THE GROUND F2 E11

F3 B2 WALL ABOVER GROUND

F3 B3 BEAMS F3 B

F3 B4 COLUMN F3

F3 C CONCRETE AND REBAR WORKS F3 B1

F3 C1 PLACING CONCRETE: F3 B2

F3 C2 SLABS F3 B3

F3 C3 COLUMNS F3 B4
F3 C4 FLR FINISH UNHARDENED F3 C

F3 C5 CONC. FINISH HARDENED F3 C1

F3 REBAR WORKS: F3 C2

F3 C6 GROUND FLR. INSTALLATION F3 C3

F3 C7 UPPER FLR. INSTALLATION F3 C4

F3 D TRADE MASONRY WORKS F3 C5

F3 D1 GROUTING and TOL PLASTERING F3

F3 D2 PEBBLE FINISHED F3 C6

F3 D3 MABLE INSTALLATION F3 C7

F3 D4 GLAZED TILES F3 D

F3 D5 UNGLAZED TILES F3 D1

F3 D6 GLAZED TILE WALL F3 D2

F3 D7 CONC. BLOCK INT. WALL F3 D3

F3 D8 CONC. BLOCK EXT. WALL F3 D4

F3 D9 PLASTER WALL AND CEILING F3 D5


F3 E DOORS AND WINDOWS F3 D6

F3 E1 W-PANEL INSTALLATION F3 D7

F3 E2 STEEL WINDOWS INSTALLATION F3 D8

F3 E3 LOUVER WINDOWS INSTALLATION: F3 D9

F3 E4 FIXED ASBESTOS F3 E

F3 E5 FIXED METAL LOUVERS F3 E1

F3 E6 FIXED GI SHEETS F3 E2

F3 E7 FIXED GLASS F3 E3

F3 E8 FIXED WOODEN F3 E4

F3 E9 ALUMINUM FRAME WINDOWS F3 E5

F3 E10 SLIDING GLASS DOOR F3 E6

F3 E11 HOLLOW METAL DOOR F3 E7

F3 E8

F4 B FORTH FLOOR F3 E9

F4 FORM WORKS INSTALLATION F3 E10


F4 B1 WALL ON THE GROUND F3 E11

F4 B2 WALL ABOVER GROUND

F4 B3 BEAMS F4 B

F4 B4 COLUMN F4

F4 C CONCRETE AND REBAR WORKS F4 B1

F4 C1 PLACING CONCRETE: F4 B2

F4 C2 SLABS F4 B3

F4 C3 COLUMNS F4 B4

F4 C4 FLR FINISH UNHARDENED F4 C

F4 C5 CONC. FINISH HARDENED F4 C1

F4 REBAR WORKS: F4 C2

F4 C6 GROUND FLR. INSTALLATION F4 C3

F4 C7 UPPER FLR. INSTALLATION F4 C4

F4 D TRADE MASONRY WORKS F4 C5

F4 D1 GROUTING and TOL PLASTERING F4


F4 D2 PEBBLE FINISHED F4 C6

F4 D3 MABLE INSTALLATION F4 C7

F4 D4 GLAZED TILES F4 D

F4 D5 UNGLAZED TILES F4 D1

F4 D6 GLAZED TILE WALL F4 D2

F4 D7 CONC. BLOCK INT. WALL F4 D3

F4 D8 CONC. BLOCK EXT. WALL F4 D4

F4 D9 PLASTER WALL AND CEILING F4 D5

F4 E DOORS AND WINDOWS F4 D6

F4 E1 W-PANEL INSTALLATION F4 D7

F4 E2 STEEL WINDOWS INSTALLATION F4 D8

F4 E3 LOUVER WINDOWS INSTALLATION: F4 D9

F4 E4 FIXED ASBESTOS F4 E

F4 E5 FIXED METAL LOUVERS F4 E1

F4 E6 FIXED GI SHEETS F4 E2
F4 E7 FIXED GLASS F4 E3

F4 E8 FIXED WOODEN F4 E4

F4 E9 ALUMINUM FRAME WINDOWS F4 E5

F4 E10 SLIDING GLASS DOOR F4 E6

F4 E11 HOLLOW METAL DOOR F4 E7

F4 E8

F5 B FIFTH FLOOR F4 E9

F5 FORM WORKS INSTALLATION F4 E10

F5 B1 WALL ON THE GROUND F4 E11

F5 B2 WALL ABOVER GROUND

F5 B3 BEAMS F5 B

F5 B4 COLUMN F5

F5 C CONCRETE AND REBAR WORKS F5 B1

F5 C1 PLACING CONCRETE: F5 B2

F5 C2 SLABS F5 B3
F5 C3 COLUMNS F5 B4

F5 C4 FLR FINISH UNHARDENED F5 C

F5 C5 CONC. FINISH HARDENED F5 C1

F5 REBAR WORKS: F5 C2

F5 C6 GROUND FLR. INSTALLATION F5 C3

F5 C7 UPPER FLR. INSTALLATION F5 C4

F5 D TRADE MASONRY WORKS F5 C5

F5 D1 GROUTING and TOL PLASTERING F5

F5 D2 PEBBLE FINISHED F5 C6

F5 D3 MABLE INSTALLATION F5 C7

F5 D4 GLAZED TILES F5 D

F5 D5 UNGLAZED TILES F5 D1

F5 D6 GLAZED TILE WALL F5 D2

F5 D7 CONC. BLOCK INT. WALL F5 D3

F5 D8 CONC. BLOCK EXT. WALL F5 D4


F5 D9 PLASTER WALL AND CEILING F5 D5

F5 E DOORS AND WINDOWS F5 D6

F5 E1 W-PANEL INSTALLATION F5 D7

F5 E2 STEEL WINDOWS INSTALLATION F5 D8

F5 E3 LOUVER WINDOWS INSTALLATION: F5 D9

F5 E4 FIXED ASBESTOS F5 E

F5 E5 FIXED METAL LOUVERS F5 E1

F5 E6 FIXED GI SHEETS F5 E2

F5 E7 FIXED GLASS F5 E3

F5 E8 FIXED WOODEN F5 E4

F5 E9 ALUMINUM FRAME WINDOWS F5 E5

F5 E10 SLIDING GLASS DOOR F5 E6

F5 E11 HOLLOW METAL DOOR F5 E7

F5 E8

F5 E9
F5 E10

F5 E11
QTY PROD

37000

1728

30

60

333

333

1728

30
1728

60

80

1233

80
1312

12315

404

57.6666667
145

1312

145

1312

145
1407
145

610
2715
80

565

80
401

80
80

401
80

401
80