You are on page 1of 4

Step 1 Step 2 Step 3 Step 4

Takt Time (Min) 0.95 0.95 0.95 0.95


Ideal Cycle Time ( 0.8 1 0.5 0.5
Cycle Time 0.13 0.15 0.18 0.13

Cycle Time I
1.4
1.2
1
0.8
0.6
0.4
0.2
0
Step 1
Cycle Time Ideal Cycle Time (Min) Takt Time (Min)
1.4
1.2
1
0.8
0.6
0.4
0.2
0
Step 1 Step 2 Step 3 Step 4
Customer Demand 340 Units
Scheduled Time 340 MInutes
Takt Time 1 minutes
Actual time 280 minutes
Units run 280 units
Cycle Time 1 minutes
Downtime 60 minutes
Improved time 330 minutes
Units run 380 units
Cycle Time 2 0.868421 minutes 380 330

Ideal Cycle Time 0.7 minutes


OEE Factor Step 1 Step 2 Step 3
Availability 98.2% 82.4% 95.3%
Performance 89.4% 70.0% 87.0%
Quality 99.2% 98.6% 99.7%
OEE 87.2% 56.8% 82.7%

Availability 0.982 0.824 0.953


Actual Operating time 334 280 324
Planned Production Time 340 340 340
Performance 0.894 0.700 0.870
Total Units Produced 393 280 381
Ideal Cycle Time 0.76 0.7 0.74
Quality 0.992 0.986 0.997
Good Count 390 276 380
Total Count 393 280 381

Downtime 5 40 6
Changeover time 1 20 4

You might also like