Professional Documents
Culture Documents
ir
water
Solid
Water content Ws
0.14 Ws
Ws+W W
Ws+0.14W 20.63
Ws= 18.10 kN
Ww 20.63-18.10
Ww=2.53 kN
Dry density:
Yd
18.10
Td 1
Yd= 18.10 kN/
Volume of air:
Ws VsYw sp.gr.)
18.10- Vs (9.81)/2.67)
Vs = 0.69 m
Vy= V- Vs
Vy=1-0.69
Vy 0.31 m
Vy(rw (sp.gr.) = Ww
Vw(9.81 2.67) = 2.53
Vw0.097 m
Va Vy-Vw
a 0.31-0.097
Va 0.213 n3
S O L COMEPACTION|
144CEBoprd 2007
The oratory compaction test of a certain
ype of soil gives a maxi dry density of
1.486 Mg/m3 with an optimum moisture
content of 12.5 The followin are the
cults of a field unit weight determination
test using sand cone method.
Volume of soil excava ed from the hole
0.001337 m
Weight of soil from the hole when wet
2220 g
Weight of soil when dry= 1890 g.
o Determine the field unit weight of soil.
What is the in situ water content of soil.
Determine the relative .compaction,is it
within the allowable range for relative
of compaction of 95 t 0.20?
Solution:
O Field unit weight of soi:
2220 (1m_s
Ywet0.001337 m100 cm
Vwet 1.66 g/cm
I n situ water content of soil:
o 2220 1890
x100
1890
=17.46%
Relative compaction:
Ywet
Yary+ .66
Vary +0.1746
ary 1413 g/cm
Rdry
Yary max
R-413
1.486 1000
R95.10%
R95.10%> 94.80%
95.10% < 95.20%
Solution:
ORelative compaction in hefield:
R
R 1-D(1 R)
R Yd min
Yd man
15.25
Ro 18.31
Ro 0.8329
0.3329
R1-0.54!1-0.8329)
R= 0.933 say 93.3%
Ydfield
Relative compaction= Yd max-lab
0.933 d fiekd
18.31
Ydfield 17.08 kN/m
1+
Shrinkage factor=1100
Ydc
(18.14 1100
Shrinkage factor =16.90
Shrinkage factor 7.3%
161 Problem
A highway embankment needs 150000
CU.m. to be completed. DPWH requiress No. of truckloads of
95% compaction and the contractor is to
borrow material:
Dry unit weight of soil
provide soil from a borow site. during
hauling
f the optimum moisture content is Yd GsYw
1+e
18% and the max. dry densityis
18.88 kN/m", how much borrow soil is Yd 2.65(9.81)
1+0.70
required per cu.m. if the moisture Yd 15.29 kN/m3
content of the borrow material is 15%
and the wet unit weight of the borrow
is 16.05 kNIm3 Volume of borrow to be
How many truckloads of borrow hauled
Wt of borrow(hauled)
material are needed if the soil would
have a void ratio of 0.70 and a wt. of embankment needed
sp.gr: V(15.29) = 17.94 (150000)
of 2.65 and the capacity of each truck
is 9 cu.m.. Vol. of borrow to be hauled (V)
How many liters of water are needed.
175,997 cu.m.
Solution:
Volume of borrow needed: No. of truckloads needed= 5997
80730
16.05 Vol. of water to be added-aR1
9.
Y +0.15 Vol. of water to be added= 8229 cu.m.
Y 13.96 kN/m3
Vol. of water to be added
8229000 liters
Vol. of borrow
required 13.96
Vol. of borrow required= 192765 cu.m.
154
SOTLGOMPACTION
Solution:
o Vol. of soll from the excavation
needed to produced 10,000 cu.yd. of
compacted soil.
Borrow pit:
105
Ydry 1+0.18
Ydry 88.98 pcf
Fill site:
Ydry 103.5 pct
Volume 10,000 cu. yd.
Volume 270,000 cu. f.
27945000
No. of truck
loads=40000
No. of truck loads
698.63 say 699 truck loads