Observation Details/
S. Hazards / Immed iate Respons ible Target Act ion
Date Time CATEGORY KRA LOCATION desc ription & witnes ses & Image (Before) Image (After) Reported By Reported To CAP Remarks
N. Risks/Benefits Ac tion person/ dept. Date St at us
Root C au se
Contractor Conducted a meeting with Hanif (Jr. Officer, Topics covered-Oxygen cylinder Contractor
359 10/Oct/21 11.00AM Safe Act SYRU Manager EHS F&M Closed
(Shaharasti) contractors about TBT/TBM EHS) handling ,Proper PPE. (Shaharasti)
Contractor
old apt plant- Mr. Kawsar working without Hanif (Jr. Officer, Contractor
362 10/Oct/21 12.00PM Unsafe act (Washkoroni Manager EHS Asked him to wear & he worn F&M Closed
1 helmet EHS) (Washkoroni)
)
Contractor
New chemical Found Mr. Shofi working welding Hanif (Jr. Officer, Contractor Stop working & asked him to Contractor
373 12/Oct/21 09.00AM Unsafe act (Shihab F&M Closed
shed working without safety goggles. EHS) (Shihab Engr.) wear & he worn (Shihab Engr.)
Engr.)
Contractor LAF ground Check ground floor for contractor Hanif (Jr. Officer, Mr. Jamil (Engr. Request Mr. Jamil for manage a Contractor (Nurul
374 12/Oct/21 10.00AM Safe Act (Nurul safa) floor workers H/K activity EHS) SMS-Electrical) light & He manage instantly Done Safa) Closed
D&D office Mr. Joynal He told me that he will inform Stacking rebar to
Unsafe Rebar bundle kept in risky Hanif (Jr. Officer,
376 12/Oct/21 12.40PM D&D front adjacent (Delivery shift in B-shift and remove within B- kept 2 bundle one D&D Closed
condition condition EHS)
area (RIO-1) charge) shift. after the other.
All (P-1) EHS Work on F/A Box medicine weekly Hanif (Jr. Officer,
400 14/Oct/21 6.00AM Medical Info EHS Manager (EHS) Inspection it -F/A by tomorrow F&M EHS Closed
Office check list EHS)
Found a Submersible pump line Told Mr. Shamim Its Not safe to
connect with CB by risky way. It's Mr. Shamim Cannot with cb line & it may
Unsafe Hanif (Jr. Officer,
427 16/Oct/21 05.00 PM SMS EMD Physical Lab not safe to connect with CB line (Manager- lead to damages pump coil. He Closed
Condition EHS)
and it may lead to damage pump Electrical, CCM) told me that he will remove the
coil line by his workers ASAP
WTP pump Collect pump name plate photo Hanif (Jr. Officer, Send Photos to Mr. Mohasin by
428 16/Oct/21 06.00 PM Safe Act WTP MMD Manager EHS Closed
room By Mr. Mohsin instruction EHS) Whats APPs
Issue 2 pcs PTW for MMD & Civil Hanif (Jr. Officer,
438 17/Oct/21 12.00PM Safe Act Contractor SMS & ASU Manager (EHS) Ensure PTW F&M EHS Closed
dept. work EHS)
Unsafe
Condition RM MMD Regarding CB & MCB without Hanif (Jr. Officer, Mr. Monir sir
452 18/Oct/21 12.00PM RM EMD Work Done F&M RM EMD Closed
Follow Up Workshop JB/DB EHS) ( EMD Manager )
426
Unsafe
Mr. Shamim
condition SMS Hanif (Jr. Officer,
453 18/Oct/21 9.00AM Physical Lab Unsafe conditional line. (Manager- Work Done F&M SMS Electrical Closed
Follow Up Electrical EHS)
Electrical, CCM)
427
Contractor
old apc plant- 3 persons found working without Hanif (Jr. Officer, Asked them to wear & they Contractor
471 19/Oct/21 04.00PM Unsafe act (Washkoroni Manager EHS F&M Closed
1 helmet EHS) worn (washkoroni)
)
Unsafe QEAF platform A window found on broken Hanif (Jr. Officer, Tanjim (Jr. He told me that he will install
472 19/Oct/21 01.13PM F&E F&M F&E Closed
condition stair room condition EHS) Officer- F & E) window ASAP
Mr. Nayeem
Unsafe RM Cooling Hanif (Jr. Officer,
486 20/Oct/21 4.00PM RM Prod. (Manager, RM
Condition bed west side Cooling way found without stair Slip/ Trip / Fall Hazard EHS) Will install a stair ASAP F&M RM Production Closed
Prod.)
Handover hotline number board Hanif (Jr. Officer, He will displayed all over the
489 20/Oct/21 3.00PM Safe Act EHS Project Office to Sumon (EHS, Promoter) EHS) Manager (EHS) plant ASAP F&M EHS Closed
Visit all over the plant with Hanif (Jr. Officer, Visit for to knowing the plant-2
491 20/Oct/21 2.20PM Safe Act EHS Plant-2 Promoter Sumon EHS) Manager (EHS) locations F&M EHS Closed
Work on medicine register & Hanif (Jr. Officer, Repot to complete and sent to
524 22/Oct/21 10.00 Pm Safe Act EHS Offices medicine costing EHS) Manager EHS manager Sir F&M EHS ` Closed
All over the No unsafe activities found during Hanif (Jr. Officer,
526 23/Oct/21 07.00 AM Safe Act EHS Manager EHS N/A F&M EHS Closed
plant safety round EHS)
03.00AM
Visited scrap yard & plant-1 with Hanif (Jr. Officer, Brief EHS Marsal about his
575 25/Oct/21 to safe Act EHS SYRU Manager EHS F&M EHS Closed
Mr. Anwar (Jr. officer-EHS) EHS) responsibilities
05.00AM
Conducted TBM with Ansar Hanif (Jr. Officer, About scrap yard unloading
593 26/Oct/21 12.00AM Safe act EHS SYRU Manager EHS F&M EHS Closed
contractor workers EHS) work
04.00 room confirm for EHS Hanif (Jr. Officer, Mr. Mihir (Jr. He told me that write the
614 28/Oct/21 Safe Act F&E Training Ro omTraining N/A F&E Closed
Am meeting EHS) Officer-F&E) schedule on training room door.
Name: Mr. Shahin, ID- 100326
Des- Asst. Engr, SMS Prod.
Brief him about
When he was walking on a Hanif (Jr. Officer, F/A has been given to him and
615 28/Oct/21 02.20 AM Medical info SMS prod. QEAF Manager (EHS) the workplace SMS Production Closed
furnace stair at that time his leg ( EHS) returned to the work place
awareness
R ) had been slip & he got highly
pain
All over the Observed the visitors walkway for Hanif (Jr. Officer, Ensured No obstacle found on
642 29/Oct/21 4.00PM Safe Act EHS Manager (EHS) F&M EHS Closed
plant visiting EHS) walkway
Mr. Shantush
Ladle lining Conducted awareness training on Hanif (Jr. Officer,
674 30/Oct/21 5.00PM TBM EHS Safety Awareness (Supervisor, About housekeeping & PPE F&M EHS Closed
platform Re-fractory area EHS)
Refractory)
Observation Details/
SL Image Image Hazards/ Immediate Responsible Target Action
Date Time CATEGORY KRA LOCATION description & witnesses & Reported By Reported To CAP Remarks
No. (Before) (After) Risks/Benefits Action person/ dept. Date Status
Root Cause
Muhammad Nurul Borhan Uddin
Hand sanitizer needed at project Provided savlon bottle for hand
247 01/Oct/21 12.00AM Safe Act EHS Main gate Disinfection Alam (Manager, Done EHS Closed
gate on billet delivery container sanitizing purposes
(Jr. Engineer, EHS) Distribution)
Muhammad Nurul
Round visit at site factory main Observed the pending issues
248 01/Oct/21 12.10AM Safe Act EHS Plant- 2 . Alam Manager (EHS) F&M EHS Closed
gate to ISY and unsafe acts & conditions
(Jr. Engineer, EHS)
A casual found marking on billet Muhammad Nurul
Contractor CCM billet Possibility of Head
249 01/Oct/21 12.30AM Unsafe Act at CCM billet point without Alam . Stopped him for compliance Done QC Closed
(Kurban Ali) point injury
helmet (Jr. Engineer, EHS)
Muhammad Nurul Briefed the EHS promoter to
Visited scrap loading & unloading
250 01/Oct/21 1.30AM Safe Act EHS SYRU . Alam Manager (EHS) keep continue aware the F&M EHS Closed
at scrap yard and road conditions
(Jr. Engineer, EHS) people at working area
Visited at scrap yard- 2, scrap
Muhammad Nurul
container unloading and
251 01/Oct/21 3.00AM Safe Act Logistics SYRU- 2 . Alam Manager (EHS) N/A F&M Logistics Closed
segregation work going on
(Jr. Engineer, EHS)
properly
Mr. Shofi (Shift
Billet delivery Visited at billet delivery point and Muhammad Nurul officer,
Contractor Slipping / Falling Awakened him and briefed to
252 01/Oct/21 3.20AM Unsafe Act point (beside a casual (K.A.) found sleeping on Alam Distribution) and F&M Contractor Closed
(Kurban Ali) hazard don't sleep at work place
slag pit) billets (Jr. Engineer, EHS) Mr. Mukhles (SVS,
K.A.)
Unsafe Beside of Doing gas cutting work near gas Anwar (Jr. Officer, Mr. Jubayer (Sr. Relocated the work at another
260 02/Oct/21 12.40AM RM Prod. Fire/ Explosion F&M RM Production Closed
Condition common room cylinder storage EHS) Engr.-RM Prod.) location
Unsafe Entrance of Visitors gallery entrance has Anwar (Jr. Officer, Mr. Jubayer (Sr.
261 02/Oct/21 12.44AM RM Prod. Relocated the bucket Done RM Production Closed
Condition visitors gallery blocked by chopping bucket EHS) Engr.-RM Prod.)
Unsafe Some materials bags stores gate Parvez Khan (Jr. Mr. Masrukh (Jr.
267 02/Oct/21 9.30AM SMS Prod. Inclined hoist Block Exit Instant action taken Done SMS Production Closed
Condition site Engineer, EHS) Engr- SMS Prod.)
Muhammad Nurul
Mr. Mohsin (In Ensure obstacles free visitors
271 02/Oct/21 2.00PM Safe Act EHS Plant- 2 Round visit at site RM to SMS . . . Alam Done EHS Closed
charge, EHS) way
(Jr. Engineer, EHS)
Muhammad Nurul
Mr. Mohsin (In
272 02/Oct/21 2.30PM Safe Act EHS Plant- 2 Visited Plant- 2 with the visitors . . Alam N/A Done EHS Closed
charge, EHS)
(Jr. Engineer, EHS)
Muhammad Nurul
Communicated RM MMD about Shoumitra (Engr.
273 02/Oct/21 4.30PM Safe Act EHS RM . Alam N/A Done EHS Closed
yesterday's MTC RM MMD)
(Jr. Engineer, EHS)
Billet delivery Muhammad Nurul
Unsafe Contractor An incident occur at billet
274 02/Oct/21 3.15PM point (beside . Alam Manager (EHS) Taken him to the Hospital F&M Contractor Closed
Procedure (Kurban Ali) delivery point beside slag pit
slag pit) (Jr. Engineer, EHS)
EHS( Nur
Safa and TBM Conducted with the Nur Safa Parvez Khan (Jr.
284 03/Oct/21 8.40 Am Safe Act Lucky yard Safety awareness Manager (EHS) TBM Topices : Closed
Korban Ali and Korban Ali Contractor Engineer, EHS)
Contractor )
Due to over speed driving Driver Parvez Khan (Jr. Mr. Fahim (officer Briefed him about speed limit
285 03/Oct/21 12.00 PM Safe Act F&E RM Gate awareness F&M F&E Closed
Name: Mr. Nitai Engineer, EHS) F&E) inside plant Also
Muhammad Nurul
289 03/Oct/21 2.45PM Safe Act EHS Plant- 2 Round visit at site RM to SMS . Alam Manager (EHS) N/A N/A EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Meeting with HOD and Manager
290 03/Oct/21 3.30PM Safe Act EHS Admin building . Alam Manager (EHS) Operational planning F&M EHS Closed
sir
(Jr. Engineer, EHS)
Beside of
Unsafe central Rain water stack an road The Anwar (Jr. Officer, Informed to Mr. Motaleb Engr.-
298 03/Oct/21 11.54PM Civil Manager EHS F&M Civil Closed
condition store(North- watering has very strong EHS) Civil. He observed physically.
East)
Unsafe Roll shop to RM main gate walk Anwar (Jr. Officer, Called duty gird and relocated
302 04/Oct/21 01.51AM Security Main gate RM Security guard Done Security Closed
condition way blocked by truck. EHS) the truck
I was checking the Maintenance Parvez Khan (Jr. I was following to see if that
304 04/Oct/21 7.40 Am Safe Act EHS RM TO SMS F&M EHS Closed
work in this area Engineer, EHS) unsafe work was going On
Unsafe Round bucket There is some rain water Parvez Khan (Jr. Mr. Fahim officer After giving informed to Mr.
305 04/Oct/21 8.30 Am F&E Slipping hazard F&M Facility and Estate Closed
Condition SMS Gate accumulated Engineer, EHS) (F&E) Fahim steps have been Taken
Muhammad Nurul
Conducted a meeting with
308 04/Oct/21 3.00PM Safe Act EHS Project Office Making awareness Alam HOD (EHS) Saftey breifing done F&M EHS Closed
contractors about TBT/TBM
(Jr. Engineer, EHS)
Muhammad Nurul
311 04/Oct/21 9.00PM Safe Act EHS Office Making monthly report . Alam Manager (EHS) Work is ongoing F&M EHS Closed
(Jr. Engineer, EHS)
ISY Control TBM Conducted For ISY area shift Parvez Khan (Jr. TBT about ISY operation safety
315 05/Oct/21 09.10 AM Safe Act SMS Prod. Safety awareness Manager (EHS) F&M SMS Prod. Closed
Room in charge and Employees Engineer, EHS) procedures
Contractor(
Found some cutter set without Parvez Khan (Jr. He says will install a flashback
317 05/Oct/21 11.30 AM Unsafe Act K.N Scrap Yard Back Fire Mr. Arif F&M K.M Brothers Closed
flashback arrestors Engineer, EHS) arrestors In the tomorrow
Brothers )
LBSS Infront Mr. Ronton And Sojib cutting Parvez Khan (Jr. TBM Mr. Shakawat sir this
318 05/Oct/21 12.45 AM Unsafe Act SMS Prod. Burns Mr. Shakawat sir Done SMS Prod. Closed
Site work without a safety jacket Engineer, EHS) Worker
Muhammad Nurul
326 07/Oct/21 12.00AM Safe Act EHS Plant- 2 Round visit at site RM to SMS . Alam Manager (EHS) N/A F&M EHS Closed
(Jr. Engineer, EHS)
Plant- 2 (in
Muhammad Nurul Stopped him and briefed to
front of A scrap truck running over speed
329 07/Oct/21 3.45AM Unsafe Act Transport Unwanted accident Alam N/A maintain safe speed in factory F&M Security Closed
dedusting on factory premises
(Jr. Engineer, EHS) premises
road)
Muhammad Nurul
Visited pending observations
330 08/Oct/21 12.00AM Safe Act EHS Plant- 2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
and unsafe acts and conditions
(Jr. Engineer, EHS)
Infront of A casual labor has smoking in Anwar (Jr. Officer, Called him and instructed for
339 08/Oct/21 10.14AM Unsafe act Store Done Closed
Mosque plant premises EHS) out doing further.
Follow up and monitoring all work Anwar (Jr. Officer, Anwar (Jr. Officer,
340 08/Oct/21 11.00AM Safe Act EHS GPH NP Manager EHS ??? F&M Closed
activities EHS) EHS)
Muhammad Nurul
Observed the pending issues
342 09/Oct/21 12.00AM Safe Act EHS Plant- 2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
and drainage conditions
(Jr. Engineer, EHS)
Muhammad Nurul
343 09/Oct/21 5.00AM Safe Act EHS Office Collecting data from register book . Alam Manager (EHS) ??? F&M EHS Closed
(Jr. Engineer, EHS)
Unsafe Plant inside road condition are Anwar (Jr. Officer, Informed to Mr. Akbor -
344 09/Oct/21 06.00PM Civil Plant-2 Ded CS Mr. Mohsin Islam F&M Civil Closed
condition very poor EHS) Manager Civil
Shakawat (Sup. -
Unsafe Oxygen cylinder has kept on the Anwar (Jr. Officer, After briefed them has been
347 09/Oct/21 10.23AM QEAF QEAF slag pit Slag Done QEAF Closed
Procedure ground laid condition. EHS) kept upright condition
management)
Power aid contractor people Anwar (Jr. Officer, Brief them to safe work Mr. Jewel (Power
348 09/Oct/21 10.40AM Safe Act MRSS MRSS Shamsuddin sir F&M Closed
working at MRSS EHS) procedure aid)
Unsafe Rahmot Dust bag has fall down from Anwar (Jr. Officer, Mr. Motin Give them a barricading tape
353 09/Oct/21 05.03PM DED Done Rahmot cont. Closed
Procedure Contractor quenching tower EHS) (Rahmot cont.) to barricade
Muhammad Nurul
Visited plant's overall
354 10/Oct/21 12.00AM Safe Act EHS Plant- 2 Round visit at site RM to ISY . Alam Manager (EHS) F&E EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul Mr. Mitun (Shift
Unsafe Short rebars have been kept at Notified to the concern to take
355 10/Oct/21 12.10AM Distribution RM gate Slip/ Trip Alam person, Done Distribution Closed
Condition RM gate on unsafe condition step for covering those
(Jr. Engineer, EHS) Distribution)
Muhammad Nurul
Unsafe SMS (inclined Housekeeping needed at inclined Mr. Tanzim Notified to the concern to take
357 10/Oct/21 1.00AM F&E Poor housekeeping Alam Done F&E Closed
condition hoist) hoist area (Officer, F&E) step
(Jr. Engineer, EHS)
Muhammad Nurul
Ensue the visitors way
358 10/Oct/21 5.30AM Safe Act EHS Plant-2 Round visit at site RM to SMS . Alam Manager (EHS) F&M EHS Closed
obstacles free
(Jr. Engineer, EHS)
Contractor Conducted a meeting with Hanif (Jr. Officer, Topics covered-Oxygen Contractor
359 10/Oct/21 11.00AM Safe Act SYRU Manager EHS F&M Closed
(Shaharasti) contractors about TBT/TBM EHS) cylinder handling ,Proper PPE. (Shaharasti)
Contractor
Mr. Kawsar working without Hanif (Jr. Officer, Contractor
362 10/Oct/21 12.00PM Unsafe act (Washkoroni old apt plant-1 Manager EHS Asked him to wear & he worn F&M Closed
helmet EHS) (Washkoroni)
)
Muhammad Nurul
Observed the on going
365 11/Oct/21 12.10AM Safe Act EHS Plant-2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
maintenance works
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Housekeeping needed at RM cold Mr. Tanzim Informed to the concern to
366 11/Oct/21 1.00AM F&E RM Poor housekeeping Alam Done F&E Closed
condition share side (Officer, F&E) take step
(Jr. Engineer, EHS)
Muhammad Nurul
367 11/Oct/21 5.00AM Safe Act EHS Plant- 2 Round visit at site . Alam Manager (EHS) ??? F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
368 11/Oct/21 11.30PM Safe Act EHS Plant- 2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
maintenance works
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Bin has filled up beside RM Mr. Tanzim Informed to the concern to
369 12/Oct/21 12.30AM F&E RM Poor housekeeping Alam F&M F&E Closed
Condition mechanical shop (Officer, F&E) take step
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
370 12/Oct/21 2.00AM Safe Act EHS Plant- 2 Round visit at site . Alam Manager (EHS) F&M EHS Closed
maintenance works
(Jr. Engineer, EHS)
Contractor LAF ground Check ground floor for contractor Hanif (Jr. Officer, Mr. Jamil (Engr. Request Mr. Jamil for manage Contractor (Nurul
374 12/Oct/21 10.00AM Safe Act Done Closed
(Nurul safa) floor workers H/K activity EHS) SMS-Electrical) a light & He manage instantly Safa)
Stacking rebar
D&D office Mr. Joynal He told me that he will inform
Unsafe Rebar bundle kept in risky Hanif (Jr. Officer, to kept 2 bundle
376 12/Oct/21 12.40PM D&D front adjacent (Delivery shift in B-shift and remove within B- D&D Closed
condition condition EHS) one after the
area (RIO-1) charge) shift.
other.
Found south side SY walk way Mr. Emran (DY Informed to Mr. Emran he told
Unsafe Hanif (Jr. Officer,
380 13/Oct/21 10.00AM Logistics SY like a pond condition it's very Manager- me that he is taking immediate F&M Logistics Closed
condition EHS)
risky. Logistics) action.
Muhammad Nurul
Observed the contractors on
381 13/Oct/21 2.30PM Safe Act EHS Plant-2 Round visit at Plant-2 . Alam Manager (EHS) F&M EHS Closed
going work
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
382 13/Oct/21 4.00PM Safe Act EHS Plant-2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
maintenance work
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
383 13/Oct/21 6.00PM Safe Act EHS MRSS Visited the MRSS area Alam Manager (EHS) . EHS Closed
maintenance work
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
384 13/Oct/21 7.00PM Safe Act EHS SYRU Visited the SYRU area Alam Manager (EHS) F&M EHS Closed
operation at SYRU
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
385 13/Oct/21 8.00PM Safe Act EHS Plant-1 & 2 Visited the Plant-1 & 2 Alam Manager (EHS) F&M EHS Closed
operation at Plants
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Notified the condition of the
386 13/Oct/21 4.20PM RM Prod. Roll shop Roll shop floor found slippery Alam Shift duty person F&M RM Production Closed
condition floor to take steps
(Jr. Engineer, EHS)
A welding machine power cable Muhammad Nurul Mr. Nur Hossain Immediately shut down the
Unsafe Will be changed RM Production (P-
388 13/Oct/21 7.50PM RM Prod. Plant-1 found defective (insulation Alam (Dy. Manager, power and informed to the Pending
condition ASAP 1)
damaged) at RM area (P-1) (Jr. Engineer, EHS) RM) concerned to change the cable
Muhammad Nurul
Contractor Plant-1 (Bar Found 2 casuals without helmet Mr. Rifat (Pulpit Instant managed by the RM Production (P-
389 13/Oct/21 8.15PM Unsafe Act Alam Done Closed
(Ansar) handling area) at bar handling area Operator) concerned 1)
(Jr. Engineer, EHS)
Plant-1 Muhammad Nurul
Contractor Another one casual found without Mr. Rifat (Pulpit Instant managed by the RM Production (P-
390 13/Oct/21 8.30PM Unsafe Act (Cooling bed Alam Done Closed
(Ansar) helmet at cooling bed area Operator) concerned 1)
area) (Jr. Engineer, EHS)
Muhammad Nurul
391 13/Oct/21 8.45PM Safe Act EHS Plant-2 Round visit at site Alam Manager (EHS) Over all conditions are ok F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the pending issues
392 14/Oct/21 2.40PM Safe Act EHS Plant-2 Round visit at site RM to ISY Alam Manager (EHS) F&M EHS Closed
and over all conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Mr. Tanvir (Engr, Notified to the shift in charge
393 14/Oct/21 3.00PM RM Prod. Roll shop Roll shop floor found slippery Alam F&M RM Production Closed
Condition RM Prod.) to take step
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Need a railing beside carbon silo Mr. Faruk (Asst. Informed to the concerned
394 14/Oct/21 4.00PM SMS MMD SMS Alam F&M SMS MMD Closed
Condition bottom side Engr, SMS MMD) person to take step ASAP
(Jr. Engineer, EHS)
All (P-1) EHS Work on F/A Box medicine Hanif (Jr. Officer,
400 14/Oct/21 6.00AM Medical Info EHS Manager (EHS) Inspection it -F/A by tomorrow F&M EHS Closed
Office weekly check list EHS)
Found new casual Mr. Azizul talked to Mr. Reduan sir (shift
Mr. Reduan sir
( Nur Safa contractors) he is Unauthorized Parvez Khan (Jr. in-charge SMS production)
402 15/Oct/21 08.30 AM Unsafe Act SMS Prod. QEAF furnace (shift in-charge TBT SMS Prod. Closed
working QEAF furnace area under People Engineer, EHS) and had a TBT with the new
SMS production)
of SMS production Department casual and furnace technician.
Shihab Parvez Khan (Jr. Mr. Akash (Sup. TBM Topics General Safety and
404 15/Oct/21 10.40 AM Safe Act ISY TBM Conducted for Shihab Con. Safety Awareness Closed
Contractor Engineer, EHS) Shihab Con.) PPE
Muhammad Nurul
Observed all over condition
411 16/Oct/21 12.00AM Safe Act EHS Plant- 2 Round visit at site RM to ISY . Alam Manager (EHS) F&M EHS Closed
and unsafe acts and conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Briefed the supervisor how to
414 16/Oct/21 1.15AM Safe Act EHS SMS (Slag pit) Safety Awareness Alam Manager (EHS) ??? F&M EHS Closed
continue TBM/TBT regularly
(Jr. Engineer, EHS)
Muhammad Nurul
416 16/Oct/21 4.30AM Safe Act EHS Plant-2 Round visit at site RM to SMS . Alam Manager (EHS) Over all conditions are ok F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the Condition Of the
417 16/Oct/21 07.30 AM Safe Act EHS Plant-1 & 2 Round visit at site both plant Alam Manager (EHS) F&M EHS
Plants
(Jr. Engineer, EHS)
Contractor Muhammad Nurul
Unsafe Some Rebar have been kept at Mr. Ekram (SVR. Informed to removed
418 16/Oct/21 08.00 AM (Shihab ISY Slip/ Trip Alam Done Contractor Closed
Condition beside road site Engr ) immediately
Engr.) (Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Notified the condition of the
422 16/Oct/21 09.05 Am CCM Prod. CCM Plant 1 Gas Cylinder Found lag on floor Housekeeping Alam Working person F&M CCM Production Closed
Condition cylinder to place it properly
(Jr. Engineer, EHS)
Drum filled with used oil has kept Muhammad Nurul Informed to shift incharge for
Unsafe
423 16/Oct/21 09.15 Am CCM Prod. SMS Plant 1 beside road, also drum cap is Slip & Fire Alam Shift EHS P-1 remove the drum from that F&M SMS-Production Closed
Condition
open (Jr. Engineer, EHS) palce
Muhammad Nurul
Taken The pictorial views for Mr. Mohsin ( In He will make plan for direction
424 16/Oct/21 11.30 Am Safe Act EHS Plant 1 & 2 Alam F&M EHS Closed
indication Signage Purposes charge, EHS ) signages implimentation
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Housekeeping Needed at 25no Mr. Tanzim
425 16/Oct/21 1.00 PM F&E 25no Gate Poor housekeeping Alam Notified him to take step F&M Facility and Estate Closed
Condition gate behind (Officer, F&E)
(Jr. Engineer, EHS)
Mr. Shamim
Unsafe inside the near Found some CB a MCB without Hanif (Jr. Officer, He told me that he will remove
426 16/Oct/21 04.00 Pm CCM EMD Electric shock (Manager- Closed
Condition Workshop JB/DB EHS) the line by his workers ASAP.
Electrical, CCM)
Told Mr. Shamim Its Not safe
Found a Submersible pump line
to Cannot with cb line & it may
connect with CB by risky way. It's Mr. Shamim
Unsafe Hanif (Jr. Officer, lead to damages pump coil.
427 16/Oct/21 05.00 PM SMS EMD Physical Lab not safe to connect with CB line Electrocution (Manager- Closed
Condition EHS) He told me that he will
and it may lead to damage pump Electrical, CCM)
remove the line by his workers
coil
ASAP
WTP pump Collect pump name plate photo Hanif (Jr. Officer, Send Photos to Mr. Mohasin
428 16/Oct/21 06.00 PM Safe Act WTP MMD Manager EHS Closed
room By Mr. Mohsin instruction EHS) by Whats APPs
Unsafe Mim Found some cutter set without Parvez Khan (Jr. He says will install a flashback
430 17/Oct/21 12.30AM Scrap Yard Back Fire Mr. Belal F&M Mim Contractors Pending
Condition Contractor flashback arrestors Engineer, EHS) arrestors In the next 7 days
Issue 2 pcs PTW for MMD & Civil Hanif (Jr. Officer,
438 17/Oct/21 12.00PM Safe Act Contractor SMS & ASU Manager (EHS) Ensure PTW F&M EHS Closed
dept. work EHS)
Muhammad Nurul
2.40PM Observed the pending issues
440 17/Oct/21 Safe Act EHS Plant-2 & 1 Round visit at site Plant-2 & 1 Alam Manager (EHS) F&M EHS Closed
7.00PM and over all conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Visited all drainage conditions
441 17/Oct/21 6.30PM Safe Act EHS Plant-2 Alam Manager (EHS) Found ok. F&M Civil Closed
due to the rain
(Jr. Engineer, EHS)
Plant 1,2 & Parvez Khan (Jr. Hazards identify and pending
444 17/Oct/21 11.10 PM Safe Act EHS Round at site Hazards identify Manager( EHS) F&M EHS Closed
scrap yard Engineer, EHS) observation chacking
Safe Act SL- Parvez Khan (Jr.
445 18/Oct/21 2.30 Am SMS Prod. SMS Remove this materials Manager( EHS) Observation Closed F&M SMS Prod. Closed
406 Engineer, EHS)
Faruq Maji RM Re-bar Parvez Khan (Jr. Informed to Mr. Sabuj Faruq Maji
446 18/Oct/21 04.10 AM Unsafe act Found 1 people sleeping Manager( EHS) F&M Closed
contractors binding Engineer, EHS) (Supervisor Faruq Majhi) contractors
Unsafe Some plastic kept LRF floor. Parvez Khan (Jr. He Will take steps By Today
447 18/Oct/21 04.40 Am F&E LRF Fire Mr. Rofik Sir F&M Facility and Estate Closed
Condition Need to be cleaning Engineer, EHS) morning
Unsafe Damping Some wood kept Roof. Need to Parvez Khan (Jr. He Will take steps By Today
448 18/Oct/21 05.00 AM F&E Mr. Rofik Sir F&M Facility and Estate Closed
Condition Station be cleaning Engineer, EHS) morning
Unsafe
RM MMD Regarding CB & MCB without Hanif (Jr. Officer, Mr. Monir sir
452 18/Oct/21 12.00PM Condition RM EMD Work Done F&M RM-Electrical Closed
Workshop JB/DB EHS) ( EMD Manager )
Follow Up 426
Muhammad Nurul
455 18/Oct/21 2.45PM Safe Act EHS Plant 2 Round visit at site RM to SMS Alam Manager EHS Pending observation checking F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Make Poster for Hot Line
456 18/Oct/21 3.30PM Safe Act EHS Office Alam Manager EHS Done EHS Closed
Numbers
(Jr. Engineer, EHS)
Muhammad Nurul
459 18/Oct/21 04.45 Pm Safe Act EHS Plant 1 Visited Plant 1 . Alam Good going ALL F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Rebar short Pics has kept
460 18/Oct/21 07.50 PM RM Prod. RM Poor housekeeping Alam Shift duty person Instant remove this rebar Done RM Prod. Closed
Condition walkway
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Poor housekeeping at RM Roll Mr. Tanvir (Engr,
461 18/Oct/21 08.00 PM RM Prod. RS Poor housekeeping Alam Notified him to take step RM Prod. Closed
Condition shop RM Prod.)
(Jr. Engineer, EHS)
Muhammad Nurul
SMS (Dumping Forklift operator found without
462 18/Oct/21 08.30 PM Unsafe Act CS 0 PPE violation Alam Mr. Anis (officer) Informed to Mr. Anis (officer) F&M Store Closed
Station ) helmet and shoes
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe SMS (Dumping Water stuck at chemical dumping Informed Anis bhai (store) to
463 18/Oct/21 08.35 PM CS Drainage block Alam Mr. Anis (officers) F&M Store Closed
Condition Station ) station area. take step immediately
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe SMS (Dumping
464 18/Oct/21 08.50 PM CS Another tarpaulin found on drain Drainage block Alam Mr. Anis (officers) Done F&M Store Closed
Condition Station )
(Jr. Engineer, EHS)
Billet delivery
I have checked this crane Diving Parvez Khan (Jr.
467 19/Oct/21 12.00 AM Safe Act EHS point (beside Ensure Manager EHS Ensure Done EHS Closed
License Engineer, EHS)
slag pit)
Contractor
3 persons found working without Hanif (Jr. Officer, Asked them to wear & they Contractor
471 19/Oct/21 04.00PM Unsafe act (Washkoroni old apc plant-1 Manager EHS F&M Closed
helmet EHS) worn (washkoroni)
)
Unsafe QEAF platform A window found on broken Hanif (Jr. Officer, Tanjim (Jr. He told me that he will install
472 19/Oct/21 01.13PM F&E F&M F&E Closed
condition stair room condition EHS) Officer- F & E) window ASAP
Unsafe Damping Parvez Khan (Jr. Mr, Fahim( Officer Infromed to Mr, Fahim .He will
477 19/Oct/21 11.25 PM Civil Another tarpaulin found on drain F&M Civil Closed
Condition Station Engineer, EHS) F&E) taken staps
Mr. Nayeem
Unsafe RM Cooling Cooling bed way found without Slip/ Trip / Fall Hanif (Jr. Officer,
486 20/Oct/21 4.00PM RM Prod. (Manager, RM Will install a stair ASAP F&M RM Production Pending
Condition bed west side stair Hazard EHS)
Prod.)
Handover hotline number board Hanif (Jr. Officer, He will displayed all over the
489 20/Oct/21 3.00PM Safe Act EHS Project Office Manager (EHS) F&M EHS Closed
to Sumon (EHS, Promoter) EHS) plant ASAP
Hanif (Jr. Officer, No unsafe conditions found
490 20/Oct/21 4.10PM Safe Act EHS Plant-1 Visit all over the plant Manager (EHS) F&M EHS Closed
EHS) during safety round
Visit all over the plant with Hanif (Jr. Officer, Visit for to knowing the plant-2
491 20/Oct/21 2.20PM Safe Act EHS Plant-2 Manager (EHS) F&M EHS Closed
Promoter Sumon EHS) locations
Muhammad Nurul
Observed the over all
492 20/Oct/21 11.45PM Safe Act EHS Plant-1 & 2 Round visit at both plants Alam Manager (EHS) F&M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Instant remove this by shift
493 21/Oct/21 12.10AM RM Prod. RM Found a cutter set on walkway Slip / Trip Alam . Done RM Production Closed
Condition duty person
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe A safety fire suit found on stair at Instant take it and keep on
494 21/Oct/21 12.30AM RM Prod. RM (IH area) Alam . Done RM Production Closed
Condition RM IH area safe place
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the pending issues
495 21/Oct/21 4.40AM Safe Act EHS Plant-2 Round visit at site RM to SMS Alam Manager (EHS) F&M EHS Closed
and unsafe acts and conditions
(Jr. Engineer, EHS)
Unsafe MMD Work Found Damaged Earth Cable Damage Parvez Khan (Jr.
500 21/Oct/21 04.10 PM CCM MMD Mr. Arif (jr. Eng) He will take steps ASAP F&M CCM Mechanical Pending
Condition shop Clamp Equipment Engineer, EHS)
Unsafe Mechanical Fabrication Found A cutter set without Damage Parvez Khan (Jr. Mr. Zainal (Dy. Mechanical
502 21/Oct/21 05.40 PM He will take steps ASAP F&M Pending
Condition Fabrication Work shop Flashback arrestor Equipment Engineer, EHS) Manager) Fabrication
Unsafe Electrical Fabrication Found Damaged Earth Cable Damage Parvez Khan (Jr. Mr. Zainal (Dy.
503 21/Oct/21 06.00 PM He will take steps ASAP F&M Electrical utility Pending
Condition utility Work shop Clamp Equipment Engineer, EHS) Manager)
Muhammad Nurul
Visited pending issues and
505 21/Oct/21 11.00PM Safe act EHS Plant-2 Round visit at site Alam Manager EHS F&M EHS Closed
over all conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed they over all
506 22/Oct/21 12.30AM Safe act EHS Plant-1 Round visit at plant-1 Alam Manager EHS F&M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
507 22/Oct/21 02.00AM Safe act EHS SYRU Visited at scrap yard Alam Manager EHS F&M EHS Closed
operation of scrap yard
(Jr. Engineer, EHS)
Muhammad Nurul
Contractor Found some people working Mr. Taher (SVR- Stopped them and asked to
508 22/Oct/21 02.30AM Unsafe act SYRU Alam Done Contractor (Belal) Closed
(Mim) without helmet. Mim) take PPE's
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Contractor Some cutter set found without Mr. Taher (SVR- Notified this matter to the SVR Will manage
509 22/Oct/21 02.30AM SYRU Explosion Alam Contractor (Mim) Closed
condition (Mim) arrestor at SYRU Belal) to take set ops. ASAP ASAP
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe Contractor Immediate mitigate the fire by
510 22/Oct/21 02.45AM SYRU Fire made at working area Explosion Alam - Done Contractor (K & B) Closed
condition (K & B) working person
(Jr. Engineer, EHS)
Store hydra operator (Rubel) Muhammad Nurul Seized the ear phone and
SMS dumping
513 22/Oct/21 03.00AM Unsafe act Store found using earphone during Unwanted incident Alam warned him to don't repeat F&M Store Closed
station
operation (Jr. Engineer, EHS) such that thing
Muhammad Nurul
Observed the overall
514 22/Oct/21 05.00AM Safe act EHS Plant-2 Round visit at site Alam Manager EHS F&M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the pending issues
515 22/Oct/21 07.40AM Safe Act EHS Plant 1,2 Round at site Plant -1 & 2 Alam Manager EHS F&M EHS Closed
and over all conditions
(Jr. Engineer, EHS)
Plant 1,2 & Parvez Khan (Jr. Hazards identify and pending
519 22/Oct/21 03.00 Pm Safe Act EHS Round At site Hazards identify Manager EHS F&M EHS Closed
scrap yard Engineer, EHS) observation checking
Contractor(
K.N bothers contracts cutting Parvez Khan (Jr. Stopped job and Were safety K.N bothers
520 22/Oct/21 05.00 PM Unsafe Act K.N Scrap Yard Burns, Fire Manager EHS F&M Closed
work without safety goggles Engineer, EHS) goggles contracts
bothers)
Contractor(
K.N bothers contracts cutting Parvez Khan (Jr. Stopped job and Were safety K.N bothers
521 22/Oct/21 05.10 PM Unsafe Act K.N Scrap Yard Burns, Fire Manager EHS F&M Closed
work without safety goggles Engineer, EHS) goggles contracts
bothers)
Work on medicine register & Hanif (Jr. Officer, Repot to complete and sent to
524 22/Oct/21 10.00 Pm Safe Act EHS Offices Manager EHS F&M EHS ` Closed
medicine costing EHS) manager Sir
Contractor shihad closed previous Md. Mohsin Islam Will follow-up Contractor
532 23/Oct/21 02.00 PM PTW Contracture Canteen area Manager EHS They raised a new PTW Closed
PTW (Officer, EHS) and Monitoring (shihab)
Shihab Ensure PTW for Shihab Parvez Khan (Jr. Mr. Belal (Engr. Contractor
534 23/Oct/21 04.00 Pm Safe Act Canteen area Ensure PTW done F&M Closed
Contractor Contractor Engineer, EHS) Shihab) (Shihab)
Parvez Khan (Jr.
535 23/Oct/21 05.00 PM Safe Act EHS Admin building EHS Meeting with HoEHS sir Manager EHS Done F&M EHS Closed
Engineer, EHS)
Muhammad Nurul
Observed the pending issues
540 24/Oct/21 07.30 AM Safe Act EHS Plant 1,2 Round visit at site Alam Manager EHS F&M EHS Closed
and over all conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the on going
541 24/Oct/21 09.00 AM Safe Act EHS SYRU Visited scrap yard Alam Manager EHS F&M EHS Closed
operation of scrap yard
(Jr. Engineer, EHS)
Muhammad Nurul
Contractor Follow up and
545 24/Oct/21 11.00AM Safe act SMS PTW raised for BSF at SMS area Alam Manager EHS ??? Civil Closed
(BSF) monitoring
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe SMS (inclined Housekeeping needed at inclined Mr. Fahim (officer
547 24/Oct/21 01.00PM F&E Poor housekeeping Alam Notified him to take step F&M F&E Closed
condition hoist) hoist area F&E)
(Jr. Engineer, EHS)
I was checking the illumination in Parvez Khan (Jr. Some halogen light have been
551 24/Oct/21 06.00 PM Safe Act EHS SMS TO CCM Manager EHS F&M EHS Closed
the SMS area Engineer, EHS) installed
Muhammad Nurul
Observed the over all
559 25/Oct/21 07.30AM Safe act EHS Plant-2 ASU Round visit at plant-2 & ASU Alam Manager EHS F&M EHS Closed
conditions and visitors ways
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe RM Mr. Shifat (Engr.- Informed him to remove the
561 25/Oct/21 08.15AM RM visiting way Found visitors way blocked at RM Slip/ Trip Alam Done RM Production Closed
condition Production RM Production) bucket.
(Jr. Engineer, EHS)
Muhammad Nurul
Unsafe SMS SMS incline Housekeeping needed at inclined Mr. Aliullah (Jr.
562 25/Oct/21 08.30AM Slip/ Trip Alam Informed him to clean the area Done SMS Production Closed
condition Production hoist hoist area Engr.- Production)
(Jr. Engineer, EHS)
Infront of
Unsafe Oxygen Oxygen plant area big water Md. Ashraf Ullah Shift in charge Empty the water storage
563 25/Oct/21 11.00AM generator Done EHS Closed
condition plant storage with old and dirt water. (Officer-EHS) oxygen plant. instant
room area
Billet storage
area Manager EHS and
Mechanical Welding man welding with out of Md. Ashraf Ullah Stop work force to work safe Mechanical
565 25/Oct/21 10.00AM Unsafe act mechanical Rajib Senior N/A Closed
Fabrication safety glass and also at height. (Officer-EHS) glass and wearing, fabrication
fabrication workshop
shop
Billet storage
area
Unsafe Mechanical Md. Ashraf Ullah Stop work and Maintenance 24 Mechanical
566 25/Oct/21 10.30AM mechanical Damage welding wire lots of side Manager EHS N/A Closed
condition Fabrication (Officer-EHS) year. fabrication
fabrication
shop
Billet storage
Electrical panel board open and
area Ensure to maintain
Unsafe Mechanical dangerously grounding machine Md. Ashraf Ullah Mechanical
567 25/Oct/21 10.00AM mechanical Manager EHS housekeeping and electrical Done Pending
condition Fabrication on the electrical board (Officer-EHS) fabrication
fabrication equipment properly.
housekeeping not ok
shop
03.00AM to Visited scrap yard & plant-1 with Hanif (Jr. Officer, Brief EHS Marsal about his
575 25/Oct/21 safe Act EHS SYRU Manager EHS F&M EHS Closed
05.00AM Mr. Anwar (Jr. officer-EHS) EHS) responsibilities
Unsafe
Beside main It has been observed that oil Mr. Masud Parvez
condition RM M. Mohsin (officer- They find out the damage
583 26/Oct/21 03.00PM shift in charge spillage from some drum stacking (Manager -RM N/A RM Mechanical Closed
(Follow up Mechanical EHS) drum & clean that area
room area. Mechanical)
482)
New forma
Unsafe Electrical - shed (Back Found a open switch breaker M. Mohsin (officer- Mr. Zainal (Dy. Informed Mr. Zoinal Abedin Follow up and
584 26/Oct/21 04.45PM Electrical Utility Closed
condition Utility side of admin beside new forma shed EHS) Manager) about this issue. monitoring
building)
Contractor It has been witnessed that one After asked Mr.Khalek he told
M. Mohsin (officer- Mr.Khalek Follow up and Contractor
585 26/Oct/21 05.00PM Unsafe act (Khalek Bending point worker carried the bending rod Ergonomic his worker for carried bending Closed
EHS) (Contractor) monitoring (Khalek Majhi)
Majhi) which is more them 50Kg. rod by tow workers.
Contractor
Mr. Ripon cutting work without Parvez Khan (Jr. Mr. Belal (Site Contractor
587 26/Oct/21 03.30PM Unsafe act (Shihab Canteen area Eye Burns He will take steps F&M Closed
safety goggles Engineer, EHS) Engr.) (Shihab Engr.)
Engr.)
Contractor
(Dhola
Parvez Khan (Jr. SVR of Informed to concern
590 26/Oct/21 04.30PM Unsafe act motors, 20 No gate site Scrap segregation without gloves. Physical F&M Contractors Pending
Engineer, EHS) contractors contractors supervisors
Shaharasti
motors)
Conducted TBM with Ansar Hanif (Jr. Officer, About scrap yard unloading
593 26/Oct/21 12.00AM Safe act EHS SYRU Manager EHS F&M EHS Closed
contractor workers EHS) work
Contractor Raised a new PTW for profile M. Mohsin (officer- Mr. Al Mamun Ensured all safety step for this Will follow-up
597 27/Oct/21 11.00AM PTW SMS Shed Contractor (BSF) Pending
(BSF) setting work at SMS shed EHS) (Officer-BSF) work. and Monitoring
Infront of A drainage cover found in
Unsafe M. Mohsin (officer- Mr. Fahim (officer Inform Mr. Fahim for placed it Will follow-up
598 27/Oct/21 03.00PM F&E Dedusting displaced condition in front of Slip and trip F&E Pending
condition EHS) F&E) in right place. and Monitoring
plant dedusting plant
12.00PM to All over the Asked shift in-charges for close M.Mohsin (officer- Mr. Parvez & Mr. Nur Alam Will follow-up
602 27/Oct/21 PTW EHS Manager EHS EHS Closed
04.00PM plant all paw which work was finished. EHS) working on it. and Monitoring
Muhammad Nurul
Unsafe Electrical Beside CS A DB falling a side need to check Mr. Joynal (Dy. Communicated with concerned
603 27/Oct/21 03.00PM Alam F&M Electrical Utility Pending
condition utility scale and repair Manager) to take step ASAP
(Jr. Engineer, EHS)
Muhammad Nurul
Communicated with PTW issues Pending PTW will be closed by
606 27/Oct/21 Safe act EHS Plant-2 Alam Manager EHS F&M All issues PTW Closed
for closing the paw. tomorrow.
(Jr. Engineer, EHS)
Muhammad Nurul
Found over all conditions are
607 27/Oct/21 06.50PM Safe act EHS Plant-1 & 2 Round visit at site both plant Alam Manager EHS F&M EHS Closed
good
(Jr. Engineer, EHS)
Found Mr. Polin working at lucky M.Mohsin (officer- Warned him about safety
618 28/Oct/21 03.30 AM Unsafe Act Distribution Lucky yard Leg injury F&M Distribution Closed
yard without safety shoe EHS) violation
Unsafe
condition M.Mohsin (officer-
619 28/Oct/21
follow up EHS)
observation
Unsafe
condition
M.Mohsin (officer-
620 28/Oct/21 (follow up
EHS)
observation
598)
Safe Act
Parvez Khan (Jr. M.Mohsin (Officer-
621 28/Oct/21 02.00 PM ( follow up EHS Plant 2 All PTW checking and closed task Done F &M EHS Closed
Engineer, EHS) EHS)
safe act)
Contractor HoD saw that Shihab contractor's Mr. Belal (Site I took them down and gave
Parvez Khan (Jr. Contractor
623 28/Oct/21 4.45 Pm Unsafe Act (Shihab Canteen site personnel working at height Engr- Shihab them a briefing on work at F &M Closed
Engineer, EHS) (Shihab Engr.)
Engr.) without safety belt (Mr. Sarif) Engr) height
Muhammad Nurul
Observed the over all
627 28/Oct/21 11.15PM Safe Act EHS Plant -2 Round visit at site plant- 2 Alam Manager (EHS) F &M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the unsafe acts and
630 29/Oct/21 12.40AM Safe Act EHS Plant -1 Visited the plant- 1 Alam Manager (EHS) F&M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the SYRU operation
631 29/Oct/21 1.00AM Safe Act EHS SYRU Visited the SYRU Alam Manager (EHS) F&M EHS Closed
and over all conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the visitors way and
635 29/Oct/21 5.00AM Safe Act EHS Plant -2 Round visit at Plant- 2 Alam Manager (EHS) F&M EHS Closed
over all conditions
(Jr. Engineer, EHS)
Round At site and checking Parvez Khan (Jr. Hazard finding and pending
636 29/Oct/21 7.30AM Safe Act EHS Plant-2 Manager (EHS) F&M EHS Closed
visitors route Engineer, EHS) observation checking
Mr. Faruq
Unsafe Parvez Khan (Jr.
637 29/Oct/21 8.30AM Distribution RM Gate Need to be covering Rebar (Officer- He will take steps F&M Distribution Closed
Condition Engineer, EHS)
Distribution)
Unsafe Parvez Khan (Jr. Mr. Azad (Officer He has been covered after
638 29/Oct/21 10.00AM Store ASU Need to be covering oil drum F&M Store Closed
Condition Engineer, EHS) -Store) giving information
Unsafe RM RM Visitor Need to remove bucket due to Parvez Khan (Jr. He has been removed after
640 29/Oct/21 11.00AM Concern dept. Done RM Production Closed
Condition Production gallery visitor stairs block Engineer, EHS) giving information
All over the Observed the visitors walkway for Hanif (Jr. Officer, Ensured No obstacle found on
642 29/Oct/21 4.00PM Safe Act EHS Manager (EHS) F&M EHS Closed
plant visiting EHS) walkway
No found any non routine
activities. Asked Mr. Belal
All over the Hanif (Jr. Officer, (Engr.- Shihab) about their
643 29/Oct/21 2.30PM Safe Act EHS Follow up mom routine activities Manager (EHS) F&M EHS Closed
plant EHS) activities & he told me that
they will continue from
tomorrow
Muhammad Nurul
650 29/Oct/21 11.20Pm Safe Act EHS Plant- 2 Round visit at site Alam Manager (EHS) Visited all over the plant F&M EHS Closed
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the unsafe acts and
653 30/Oct/21 12.30AM Safe Act EHS Plant- 1 Visited the Plant-1 Alam Manager (EHS) F&M EHS Closed
conditions
(Jr. Engineer, EHS)
Muhammad Nurul
Observed the SYRU on going
654 30/Oct/21 1.15AM Safe Act EHS SYRU Visited the SYRU area Alam Manager (EHS) F&M EHS Closed
operation
(Jr. Engineer, EHS)
Contractor
Unsafe SMS (In front Found Damaged welding Cable in M. Mohsin (officer- Mr. Belal (Engr. After asked them they repair Contractor
667 30/Oct/21 11.00AM (Shihab Electrication Done
condition of LRF) working area EHS) Shihab) the cable instantly (Shihab Engr.)
Engr.)
Mr. Shantush
Ladle lining Conducted awareness training on Hanif (Jr. Officer,
674 30/Oct/21 5.00PM TBM EHS Safety Awareness (Supervisor, About housekeeping & PPE F&M EHS Closed
platform Re-fractory area EHS)
Refractory)
Contractor
295 03/Oct/21 8.15PM Safe Act (Shihab SMS
Engr.)
Contractor
Unsafe
327 07/Oct/21 1.00AM (Shihab SMS
Condition
Engr.)
Contractor
RM (beside
332 08/Oct/21 12.40AM Unsafe Act (Shihab
stand 7no)
Engr.)
Contractor
RM (beside
333 08/Oct/21 12.45AM Mishandling (Shihab
stand 7no)
Engr.)
Contractor
New chemical
373 12/Oct/21 09.00AM Unsafe act (Shihab
shed
Engr.)
Contractor
Unsafe
395 14/Oct/21 4.30PM (Shihab ISY
Condition
Engr.)
Contractor
396 14/Oct/21 4.30PM Unsafe Act (Shihab ISY
Engr.)
Contractor
Unsafe
418 16/Oct/21 08.00 AM (Shihab ISY
Condition
Engr.)
Contractor
Unsafe
419 16/Oct/21 8.10 AM (Shihab ISY
Condition
Engr.)
Contractor
Unsafe
546 24/Oct/21 01.00PM (Shihab SMS
condition
Engr.)
Contractor
587 26/Oct/21 03.30PM Unsafe act (Shihab Canteen area
Engr.)
Contractor
623 28/Oct/21 4.45 Pm Unsafe Act (Shihab Canteen site
Engr.)
Contractor
Unsafe SMS (In front
667 30/Oct/21 11.00AM (Shihab
condition of LRF)
Engr.)
Muhammad Nurul
. Alam
(Jr. Engineer, EHS)
Muhammad Nurul
Extinguisher
Alam
blocked
(Jr. Engineer, EHS)
Muhammad Nurul
Hand burn/ Eye
Alam
irritation
(Jr. Engineer, EHS)
Muhammad Nurul
Unauthorized
Alam
People
(Jr. Engineer, EHS)
Hanif (Jr. Officer,
EHS)
Muhammad Nurul
Alam
(Jr. Engineer, EHS)
Muhammad Nurul
Alam
(Jr. Engineer, EHS)
Muhammad Nurul
Slip/ Trip Alam
(Jr. Engineer, EHS)
Muhammad Nurul
Explosion Alam
(Jr. Engineer, EHS)
Muhammad Nurul
Slip / Trip Alam
(Jr. Engineer, EHS)
M. Mohsin (officer-
Electrication
EHS)
Contractor
EHS Shift person ??? F&M
(Shihab Engr.)
Mr. Humayun
Stopped them for ensuring the
(Engr. Civil) &
PTW and briefed to maintain F&M Contractor
Mr. Ekram (SVR.-
the safe procedure
Shihab Con)
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed