Contract No.

DC/2019/10
Special Conditions of Tender Yuen Long Effluent Polishing Plant -
Appendix E Main Works for Stage 1

BEIES Yuen Long Effluent Polishing Plant -


Main Works for Stage 1
Nereda Solution to YLEPP Contract No. DC/2019/10

Item No. Description Quantity Unit Rate $ Amount $

A1.1 Engineering Design for


A1.1.1 Mainstream Bio-Reactor System
A1.1.1.1 Pre-bid engineering design of AGS (except chemical
dosing system)
- Nereda basic engineering design including process
engineering; hydraulic engineering; civil and mechanical
engineering; process automation, instrumentation and
control; startup and commissioning; process operation;
etc.

A1.1.1.2 Engineering design of AGS and Sludge Prethickening


System (except chemical dosing system)
- Nereda basic engineering design including process
engineering; hydraulic engineering; civil and mechanical
engineering; process automation, instrumentation and
control; startup and commissioning; process operation;
etc.
- Detailed engineering design, including

A1.1.1.3 BIM development of AGS and Sludge Prethickening


System (except chemical dosing system)
- Influent pit, Reactors, WLC, Sludge buffer, Sludge
prethickening system

A1.1.1.4 Pre-bid engineering design of AGS - Chemical Dosing

A1.1.1.5 Engineering design of AGS - Chemical Dosing System

A1.1.1.6 BIM development of AGS - Chemical dosing system

Grand Summary for Process Design, Testing & Commissioning of -

AECOM Asia Co. Ltd.


SCT-E/1 February 2020
I-DC_2019_10_SCT_AppE-0
Contract No. DC/2019/10
Special Conditions of Tender Yuen Long Effluent Polishing Plant -
Appendix E Main Works for Stage 1

BEIES Yuen Long Effluent Polishing Plant -


Main Works for Stage 1
Nereda Solution to YLEPP Contract No. DC/2019/10

Item No. Description Quantity Unit Rate $ Amount $


-
Mainstream Bioreactor System and Tertiary Treatment System (A)
(Item No. 1A which is part of Item No. 1 in Appendix R of additional conditions of contract)
Total amount of pricing information -
(Item No. 1A which is part of Item No. 1 in Appendix R of additional conditions of contract)
to bring forward to activity schedule no. 12.1(A) = (A)

AECOM Asia Co. Ltd.


SCT-E/2 February 2020
I-DC_2019_10_SCT_AppE-0
项目开发阶段成本预算

合同签订前业务开发和投标阶段
工作地 工日总
职位 姓名 来自 7 8 9 10 11 12 1 2 3 4 5 6 工日费率 单项成本 计算人 批准人 日期
Items N° 点 计
T01 市场开发
项目前期开发
市场总监 60 4,000.00 240,000.00 SUPPRIMER
投标经理 120 2,500.00 300,000.00 SUPPRIMER
市场开发经理 180 3,500.00 630,000.00 SUPPRIMER
市场开发经理 120 3,500.00 420,000.00 SUPPRIMER

副总经理 1 1 3 3 1 1 1 1 1 1 14 7,000.00 98,000.00


商务总监 1 1 1 1 8 8 8 8 45 45 41 41 207 4,000.00 829,000.00
高级工艺工程师 5 5 5 5 5 5 30 3,800.00 114,000.00

T02 投标阶段设计工作 0
项目总工程师 3 3 3 3 5 5 10 10 10 10 62 7,000.00 434,000.00 SUPPRIMER
项目总经理 5 10 10 10 35 4,500.00 157,500.00 SUPPRIMER
设计总监 5 5 5 5 5 10 45 45 43 43 210 4,000.00 841,000.00
高级工艺工程师 1 1 1 1 1 10 35 37 39 39 165 3,800.00 625,100.00
高级工艺工程师 41 28 22 22 113 3,800.00 430,112.50
高级工艺工程师 1 1 1 1 1 10 35 37 33 31 151 3,800.00 571,900.00
工艺工程师 1 5 35 33 29 31 134 3,000.00 400,875.00
工艺工程师 1 5 35 33 39 31 144 3,000.00 430,687.50
详细设计经理 2 15 33 33 22 105 3,000.00 314,250.00
详细设计经理 2 15 33 33 22 105 3,000.00 314,250.00
高级管道工程师 11 16 18 11 56 3,500.00 196,000.00
高级机械工程师 0 3,500.00 -
机械工程师 0 2,500.00 -
高级电气工程师 2 5 5 5 5 22 3,500.00 77,000.00
电气工程师 2 5 5 5 5 22 2,500.00 55,000.00
高级仪控工程师 10 22 25 25 20 102 3,500.00 357,000.00
仪控工程师 5 22 22 22 20 91 2,500.00 227,500.00
高级土建工程师 0 3,500.00 -
高级水力工程师 0 3,500.00 -
BIM工程师 0 3,000.00 - SUPPRIMER
总图工程师 0 2,500.00 -
给排水工程师 0 2,500.00 -
消防工程师 0 4,500.00 -
暖通工程师 0 2,500.00 -
绘图工程师 0 1,500.00 -
调试总监 5 10 20 10 45 4,000.00 180,000.00
翻译 5 5 5 15 1,000.00 15,000.00
T03 投标阶段采购询价 0
采购管理 0
采购部经理 0 3,500.00 - SUPPRIMER
采购工程师 0 2,500.00 - SUPPRIMER

T04 投标阶段造价 0
造价管理 0

总计 2,246
8,258,175.00
合同执行阶段成本预算
项目名称: YLEPP - MBS
第一年 第二年 第三年 第四年
开始 结束 持续月份 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
元朗标前设计 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
合同生效 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工程设计 1 8 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
BIM 6 10 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
土建施工 7 18 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备采购 6 13 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备安装 12 20 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备现场验收 13 21 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
污泥接种和培育 22 25 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工艺启动 24 27 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工艺调试 27 28 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 26 26 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
系统调试 28 29 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 27 27 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
元朗项目全厂调试 29 30 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 28 28 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
缺陷责任期 31 42 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Items N职位 姓名 来自 工作地点 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 工日总计 工日费率 单项成本 计算人 批准人 日期


T01 项目管理
项目总经理 北京 10 10 10 10 10 10 10 10 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 10 10 1 1 1 1 1 1 1 1 1 1 1 1 242 4,500.00 1,089,000
项目管理总监 北京 5 5 5 5 5 5 5 2 2 2 2 2 2 2 2 2 2 2 2 59 3,500.00 206,500
项目经理 北京 10 10 10 10 10 10 10 3 3 3 3 3 3 3 3 3 3 3 3 106 3,500.00 371,000
计划经理 北京 20 20 20 20 20 20 15 15 15 15 10 10 10 10 10 10 5 5 5 5 3 3 3 3 3 3 3 3 3 3 5 5 5 5 5 5 320 3,000.00 960,000
项目财务经理 北京 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 180 3,000.00 540,000
文档管理工程师 北京 5 5 5 5 5 5 5 5 5 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 315 2,000.00 630,000
HSE工程师 北京 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 180 3,000.00 540,000
翻译 北京 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 10 10 10 10 10 10 10 10 10 225 1,000.00 225,000
0 SUPPRIM
T02 设计
项目总工程师 北京/AMFT 8 8 8 8 8 8 8 8 2 2 2 2 2 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5 5 5 1 1 1 1 1 1 141 7,000.00 987,000
设计总监 北京/AMFT 31 31 27 27 27 27 27 27 3 3 3 3 3 3 3 3 3 3 3 3 3 8 8 8 8 8 10 10 10 10 5 5 5 5 5 5 372 4,000.00 1,489,500
高级工艺工程师 北京/AMFT 31 31 25 25 25 25 25 25 8 8 8 8 8 1 1 1 1 1 1 1 258 3,800.00 981,825
高级工艺工程师 北京/AMFT 15 15 15 10 10 8 8 8 1 1 1 1 1 1 1 1 1 1 1 1 101 3,800.00 383,800
高级工艺工程师 北京/AMFT 0 3,800.00 0
工艺工程师 北京 31 31 25 25 25 25 25 25 3 3 3 3 3 226 3,000.00 679,125
工艺工程师 北京 31 31 25 25 25 25 25 25 2 2 2 2 2 221 3,000.00 664,125
详细设计经理 北京 27 27 29 29 29 31 31 31 8 8 8 8 8 5 5 5 5 5 5 5 308 3,000.00 924,375
详细设计经理 北京 27 27 29 29 29 31 31 31 10 10 10 5 5 3 3 3 3 3 3 3 294 3,000.00 882,375
高级管道工程师 北京 31 31 25 25 25 25 25 25 10 10 5 5 5 5 5 5 5 5 5 5 281 3,500.00 984,813
高级机械工程师 北京 31 31 25 25 25 25 25 25 3 3 3 3 3 1 1 1 1 1 1 1 233 3,500.00 816,813
机械工程师 北京 0 2,500.00 0
高级电气工程师 北京 5 5 5 5 5 5 5 5 5 5 5 5 5 2 2 2 2 2 2 2 79 3,500.00 276,500
电气工程师 北京 8 8 8 8 8 8 8 8 5 5 5 5 5 2 2 2 2 2 2 2 103 2,500.00 257,500
高级仪控工程师 北京 10 10 10 10 10 10 10 10 5 5 5 5 5 2 2 2 2 2 2 2 119 3,500.00 416,500
仪控工程师 北京 15 15 15 15 15 15 15 15 5 5 5 5 5 2 2 2 2 2 2 2 159 2,500.00 397,500
高级土建工程师 北京 5 5 5 3 3 2 2 2 27 3,500.00 94,500
高级水力工程师 北京 0 3,500.00 0
BIM工程师 BIM外包 北京 1 1 1 1 1 1 1 1 2 2 2 2 2 1 1 20 3,000.00 60,000
BIM工程师 北京 1 1 1 1 1 1 1 1 2 2 2 2 2 1 1 20 3,000.00 60,000
总图工程师 北京 0 2,500.00 0
给排水工程师 北京 2 2 2 1 1 1 1 1 11 2,500.00 27,500
消防工程师 北京 2 2 2 1 1 1 1 1 11 4,500.00 49,500
暖通工程师 北京 2 2 2 1 1 1 1 1 11 2,500.00 27,500
绘图工程师 北京 10 15 18 22 22 22 22 15 2 2 2 2 2 2 2 2 2 2 166 1,500.00 249,000
翻译 北京 5 5 5 5 5 8 8 8 8 3 3 3 3 69 1,000.00 69,000
T03 设备采购
采购总监 北京 3 3 3 3 3 3 3 3 1 1 1 1 1 1 1 1 1 1 1 1 36 3,500.00 126,000
采购经理 北京 5 5 5 5 5 5 5 5 3 3 3 3 3 3 3 3 3 3 3 3 76 3,000.00 228,000
设备运输 北京 0 1,500.00 0
质量工程师 北京 0 2,500.00 0
合同管理 北京 0 3,500.00 0
0
T04 施工和安装支持 0
现场总监 北京/元朗 5 5 5 5 5 5 5 5 40 4,000.00 160,000
现场经理 北京/元朗 5 5 10 10 22 22 22 22 22 22 22 22 22 22 250 3,500.00 875,000
现场工艺工程师 北京/元朗 5 5 5 5 22 22 22 22 22 22 22 22 22 22 240 3,000.00 720,000
现场机械工程师 北京/元朗 0 3,000.00 0
现场水力工程师 北京/元朗 0 3,000.00 0
现场电气工程师 北京/元朗 5 5 22 22 22 22 22 22 22 22 22 22 230 3,000.00 690,000
现场仪控工程师 北京/元朗 5 5 22 22 22 22 22 22 22 22 22 22 230 3,000.00 690,000
合同执行阶段成本预算
项目名称: YLEPP - MBS
第一年 第二年 第三年 第四年
开始 结束 持续月份 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
元朗标前设计 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
合同生效 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工程设计 1 8 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
BIM 6 10 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
土建施工 7 18 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备采购 6 13 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备安装 12 20 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
设备现场验收 13 21 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
污泥接种和培育 22 25 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工艺启动 24 27 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
工艺调试 27 28 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 26 26 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
系统调试 28 29 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 27 27 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
元朗项目全厂调试 29 30 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 28 28 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
缺陷责任期 31 42 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Items N职位 姓名 来自 工作地点 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 工日总计 工日费率 单项成本 计算人 批准人 日期


质量工程师 北京/元朗 5 5 10 10 10 15 15 22 22 22 22 22 22 22 224 2,500.00 560,000
HSE工程师 北京/元朗 0 4,500.00 0
BIM工程师 北京/元朗 5 5 5 5 5 5 5 35 3,000.00 105,000
0
T05 工艺启动、系统调试和全厂调试 0
调试总监 北京/元朗 10 10 10 22 22 22 22 26 22 22 22 26 22 26 22 22 22 22 372 4,000.00 1,488,000
高级工艺工程师 北京/元朗 10 10 10 22 22 22 22 26 22 22 22 26 22 26 22 22 22 22 372 3,800.00 1,413,600
水力工程师 北京/元朗 3 3 5 10 10 10 10 10 5 5 5 10 5 10 5 5 5 5 121 3,000.00 363,000
高级机械工程师 北京/元朗 10 10 10 26 26 22 22 26 22 22 22 26 22 22 22 22 22 22 376 3,500.00 1,316,000
高级电气工程师 北京/元朗 10 10 10 22 22 22 10 22 10 10 10 22 10 22 10 10 10 10 252 3,500.00 882,000
高级仪控工程师 北京/元朗 10 10 10 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 360 3,500.00 1,260,000
HSE工程师 北京/元朗 0 3,000.00 0
化验工程师 北京/元朗 5 22 22 22 22 26 22 22 22 26 22 26 22 22 22 22 347 2,500.00 867,500
0
T06 缺陷责任期和运行技术指导 0
运行总监 北京 2 2 2 2 2 2 2 2 2 2 2 2 24 4,000.00 96,000
高级工艺工程师 北京 3 3 3 3 3 3 3 3 3 3 3 3 36 3,800.00 136,800
水力工程师 北京 0 3,000.00 0
高级机械工程师 北京 5 5 5 5 5 5 5 5 5 5 5 5 60 3,500.00 210,000
高级电气工程师 北京 3 3 3 3 3 3 3 3 3 3 3 3 36 3,500.00 126,000
高级仪控工程师 北京 0 3,500.00 0
HSE工程师 北京 0 3,000.00 0
化验工程师 北京 0 2,500.00 0
0
总计 8,577 27,653,150

*工作日加班,按1.5倍计工时;节假日加班,按2倍计工时。
*建设计划主要体现时长,时间为压缩版的相对时间,设计、采购、土建、安装、测试、调试、启动、开车按照土建商排的大时间表。
Rev 0: 2011- 11- 15

项目开发阶段其他成本
差旅费用
持续时间
部门 目的 地点 参加人 人数 旅行数量 往返机票 酒店数量 备注 往返机票单价 酒店单价 出差补助
(天)
业务发展 商务会议 香港 市场总监 1 12 2 12 24 3,000 1,000 120
业务发展 商务会议 香港 投标经理 1 6 3 6 18 3,000 1,000 120
设计 联络会 香港 设计经理 1 3 2 3 6 3,000 1,000 120
设计 联络会 香港 电气自控工程师 1 2 3 2 6 3,000 1,000 120
设计 联络会 香港 机械工程师 1 2 3 2 6 3,000 1,000 120

小记 25 60 75,000 60,000 7,200

商务宴请
部门 目的 地点 参加人 单次人数 宴请数量 宴请人次 宴请人均价格
业务发展 商务会议 香港 8 4 32 500
业务发展 商务会议 香港 8 4 32 800
业务发展 商务会议 香港 8 2 16 1,000
业务发展 商务会议 香港 8 2 16 1,500

小记 12 96 81,600
总计 223,800

差旅费用
持续时间
部门 目的 地点 参加人 人数 旅行数量 往返机票 酒店数量 备注 往返机票单价 酒店单价 出差补助
(天)
业务发展 商务会议 香港 副总经理 1 2 3 2 6 3,000 1,000 120
业务发展 商务会议 香港 商务总监 1 3 3 3 11 3,000 1,000 120

小记 5 17 15,000 17,000 2,040

商务宴请
部门 目的 地点 参加人 单次人数 宴请数量 宴请人次 宴请人均价格
业务发展 商务会议 北京 1 1 8 400

小记 1 8 3,200
总计 37,240

Printed on: 11/15/2022


Rev 0: 2011- 11- 15

合同执行阶段其他成本
差旅费用
持续时间
部门 目的 地点 参加人 人数 旅行数量 往返机票 酒店数量 备注 往返机票单价 酒店单价 出差补助
(天)
合同管理 各种联络会议 香港 项目经理 1 20 2 20 40 3,000 1,000 120
合同管理 各种联络会议 香港 合同计划工程师 1 2 2 2 4 3,000 1,000 120
设计 第一次设计联络会 香港 工艺工程师/自控工程师 4 1 2 4 8 3,000 1,000 120
设计 第二次设计联络会 香港 工艺工程师 2 1 2 2 4 3,000 1,000 120
设计 第三次设计联络会 香港 工艺工程师/机械工程师 2 1 1 2 2 3,000 1,000 120
设计 第四次设计联络会 香港 工艺工程师/自控工程师 2 1 1 2 2 3,000 1,000 120
设计 现场配合 香港 工艺/自控/机械工程师 3 2 2 6 12 3,000 1,000 120
设计 电气自控盘柜检查 香港 电气工程师 1 2 3 2 6 3,000 1,000 120
采购 工厂验收 欧洲 采购工程师/业主/顾问 6 4 7 24 168 8,000 3,000 120
采购 工厂验收 中国/泰国 采购工程师/业主/顾问 6 2 7 12 84 3,000 1,500 120
现场管理 现场安装指导和调试 香港 机械工程师/电气工程师 2 4 1 8 0 3,000 1,000 120
现场管理 现场安装指导和调试 香港 机械工程师/电气工程师 2 4 2 8 16 3,000 1,000 120

项目管理 各种联络会议 香港 项目经理 1 15 2 15 30 3,000 1,000 120


设计 项目开工会-业主土建总包商 香港 项目工程师 2 1 2 2 4 3,000 1,000 120
设计 项目开工会-机电总包商 香港 项目工程师 5 1 2 5 10 3,000 1,000 120
设计 项目开工会 荷兰 项目工程师 6 1 7 6 42 8,000 1,080 120
设计 初步设计 荷兰 项目工程师 6 1 7 6 42 8,000 1,080 120
设计 详细设计 荷兰 项目工程师 6 1 7 6 42 8,000 1,080 120
设计 设计协作 香港 项目工程师 4 3 5 12 60 3,000 1,000 120
设计 设计审查 香港 项目工程师 6 2 7 12 84 3,000 1,000 120
设计 BIM协作 香港 项目工程师 4 1 3 4 12 3,000 1,000 120
采购 工厂验收测试-控制系统 国内 项目工程师 3 2 15 6 90 2,600 750 120
采购 工厂验收测试-内件 国内 项目工程师 4 1 10 4 40 2,600 750 120
采购 工厂验收测试-重要设备 欧洲 项目工程师 3 2 7 6 42 8,000 1,080 120
安装 土建施工支持 香港 项目工程师 4 6 11 24 264 3,000 1,000 120
安装 设备安装支持 香港 项目工程师 6 6 15 36 540 3,000 1,000 120
测试 现场验收测试-控制系统 国内 项目工程师 4 2 10 8 80 3,200 750 120
测试 现场验收测试-内件 国内 项目工程师 4 2 10 8 80 2,600 750 120
测试 现场验收测试-重要设备 香港 项目工程师 4 2 10 8 80 3,000 1,000 120
调试 污泥接种和培养 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 MBS工艺启动 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 MBS系统调试 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 MBS工艺调试 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 MBS性能测试 香港 项目工程师 8 0 7 0 0 3,000 1,000 120
调试 MBS可靠性测试 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 YLEPP全厂调试 香港 项目工程师 8 1 30 8 240 3,000 1,000 120
调试 DLP期间服务 香港 项目工程师 4 12 2 48 96 3,000 1,000 120
庆典 竣工、投运 香港 项目工程师 3 2 2 6 12 3,000 1,000 120
· 小记 70 302 396,000 724,000 41,520
362 3436 1,320,400 3,754,940 412,320

商务宴请
部门 目的 地点 参加人 单次人数 宴请数量 宴请人次 宴请人均价格
合同管理 设计联络会 香港 8 2 16 500
合同管理 现场联络会 香港 8 2 16 800
合同管理 现场联络会 香港 8 2 16 1,000

项目组 初步设计审查 北京 15 1 15 250


项目组 设计协作 北京 15 1 15 250
项目组 详细设计审查 北京 15 1 15 200
项目组 BIM协作 北京 15 1 15 180
项目组 设计协作 香港 15 1 15 500

小记 北控海外 6 48 36,800
北控工业 0 0 0

现场开销 现场开销
部门 名称 地点 数量 成本单价 小记 数量 成本单价 小记
现场管理 现场办公室设备 香港 1 50,000.00 50,000.00 1 50,000.00 50,000.00
现场管理 现场个人防护装备 香港 8 1,000.00 8,000.00 10 1,000.00 10,000.00
现场管理 现场车辆 香港 1 200,000.00 200,000.00 200,000.00 -
现场管理 住宿(公寓) 香港 12 15,000.00 180,000.00 0 15,000.00 -
现场管理 化验分析 深圳 34 3,000.00 102,000.00 3,000.00 -
现场管理 现场小工具 香港 1 30,000.00 30,000.00 30,000.00 -
庆典礼品 2 10,000.00 20,000.00
小记 570,000.00 小计 80,000.00
总计 1,768,320.00 5,567,660.00

调试公寓 4 15,000.00 420,000.00


调试酒店 1,440,000.00
节约 二人一间7个月租期 -1,020,000.00

Printed on: 11/15/2022


工程师类型 费率 调整 Overseas 费率
项目总经理 4,500 HSE工程师 4,500
项目总工程师 7,000 设计总监 4,000
项目管理总监 3,500 成本控制经理 3,500
项目经理 3,500 电气与自控设计经理 3,500
项目财务经理 3,500 3,000 机械工程师 3,500
合同管理 3,500 3,000 联合体管理经理 3,500
计划经理 3,500 3,000 现场经理 3,500
翻译 1,000 总工程师 3,500
设计总监 4,000 采购经理 3,000
电气工程师 2,500 工艺工程师 3,000
高级工艺工程师 3,800 机械工程师 3,000
高级电气工程师 3,500 设计经理 3,000
高级管道工程师 3,500 采购工程师 2,500
高级水力工程师 3,500 电气工程师 2,500
高级土建工程师 3,500 项目经理 2,500
高级仪控工程师 3,500 文件准备助理 2,000
高级机械工程师 3,500 自控工程师 2,000
给排水工程师 2,500 绘图工程师 1,500
工艺工程师 3,000 翻译 1,000
化验工程师 2,500 合同计划工程师 1,000
绘图工程师 1,500 设计部助理 1,000
机械工程师 2,500 设计进度管理员 1,000
暖通工程师 2,500 BIM设计
调试总监 4,000 市场总监 4,000
运行总监 4,000 投标经理 2,500
采购经理 3,000 市场开发经理 3,500
采购总监 3,500 造价部经理 3,500
设备运输 1,500 造价工程师 2,000
水力工程师 3,000
文档管理工程师 2,000
现场电气工程师 3,000
现场工艺工程师 3,000
现场机械工程师 3,000
现场经理 3,500
现场水力工程师 3,000
现场仪控工程师 3,000
现场总监 4,000
详细设计经理 3,000
消防工程师 4,500
仪控工程师 2,500
质量工程师 2,500
总图工程师 2,500
BIM工程师 3,000
HSE工程师 4,500 3,000
商务总监 4,000
副总经理 7,000
Air fair
Shanghai 2,600.00
Europe 8,000.00
Hongkong 3,000.00
Shenzhen 3,200.00

Railway
Shanghai 1,306.00
Shenzhen 2,100.00

Hotel
HK 1,000.00
Europe 1,080.00
Shanghai 750.00

Allowance
domestic 120.00

rmberuo 1.1720
Company Function Daily Rate Currency
RHDHV Principal engineer / leading professional 2,064 Euro
RHDHV Legal or IP counsel 1,608 Euro
RHDHV Project director 2,064 Euro
RHDHV Project manager 1,608 Euro
RHDHV Senior process engineer 1,424 Euro
RHDHV Senior civil engineer 1,248 Euro
RHDHV Senior mechanical engineer 1,248 Euro
RHDHV Senior PAICT engineer 1,248 Euro
RHDHV Senior hydraulic engineer 1,248 Euro
BEIES Project director CNY
BEIES Project manager CNY
BEIES Senior process engineer CNY
BEIES Senior civil engineer CNY
BEIES Senior mechanical engineer CNY
BEIES Senior electrical engineer CNY
BEIES Senior instrument/automation engineer CNY
BEIES Senior hydraulic engineer CNY
BEIES Process engineer CNY
BEIES Civil engineer CNY
BEIES Mechanical engineer CNY
BEIES Electrical engineer CNY
BEIES Instrument/automation engineer CNY
BEIES Hydraulic engineer CNY
Supplier Project director CNY
Supplier Project manager CNY
Supplier Senior process engineer CNY
Supplier Senior civil engineer CNY
Supplier Senior mechanical engineer CNY
Supplier Senior electrical engineer CNY
Supplier Senior instrument/automation engineer CNY
Supplier Senior hydraulic engineer CNY
Supplier Process engineer CNY
Supplier Civil engineer CNY
Supplier Mechanical engineer CNY
Supplier Electrical engineer CNY
Supplier Instrument/automation engineer CNY
Supplier Hydraulic engineer CNY
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
Supplier
职能 币种 费率-2019 费率-2020 费率-2021 费率-2022 费率-2023
总工程师 Euro 2,016 2,064 2,113 2,163 2,215
法律顾问 Euro 1,568 1,608 1,649 1,691 1,734
项目总监 Euro 2,016 2,064 2,113 2,163 2,215
项目经理 Euro 1,568 1,608 1,649 1,691 1,734
高级工艺工程师 Euro 1,392 1,424 1,457 1,490 1,524
高级土建工程师 Euro 1,216 1,248 1,281 1,315 1,350
高级机械工程师 Euro 1,216 1,248 1,281 1,315 1,350
高级电控工程师 Euro 1,216 1,248 1,281 1,315 1,350
高级水力工程师 Euro 1,216 1,248 1,281 1,315 1,350
项目总经理 CNY 5,000
项目总工程师 CNY 7,000
项目管理总监 CNY 4,000
项目经理 CNY 3,500
项目财务经理 CNY 3,000
合同管理 CNY 2,500
计划经理 CNY 3,000
翻译 CNY 1,000
设计总监 CNY 4,000
电气工程师 CNY 3,000
高级电气工程师 CNY 3,800
高级管道工程师 CNY 3,500
高级水力工程师 CNY 3,500
高级土建工程师 CNY 3,500
高级仪控工程师 CNY 3,500
给排水工程师 CNY 3,000
工艺工程师 CNY 3,200
化验工程师 CNY 3,000
绘图工程师 CNY
机械工程师 CNY 3,000
暖通工程师 CNY 3,000
调试总监 CNY 4,000
运行总监 CNY 4,500
采购经理 CNY 2,500
采购总监 CNY 3,500
设备运输 CNY 1,200
水力工程师 CNY 3,000
文档管理工程师 CNY 1,600
现场电气工程师 CNY 3,200
现场工艺工程师 CNY 3,500
现场机械工程师 CNY 3,200
现场经理 CNY 4,000
现场水力工程师 CNY 3,200
现场仪控工程师 CNY 3,200
现场总监 CNY 4,500
详细设计经理 CNY 3,500
消防工程师 CNY 3,000
仪控工程师 CNY 3,000
质量工程师 CNY 3,000
总图工程师 CNY 3,000
BIM工程师 CNY 3,000
HSE工程师 CNY 3,500
费率-2024 费率-2025 Increase
2,268 2,322 1.0238
1,778 1,823 1.0255
2,268 2,322 1.0238
1,778 1,823 1.0255
1,559 1,595 1.0230
1,386 1,422 1.0263
1,386 1,422 1.0263
1,386 1,422 1.0263
1,386 1,422 1.0263
#REF! #REF! #REF! #REF!
OTHER COSTS #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
OTHER COSTS computed as a % of BEIES Tender Price

#REF! #REF! #REF! #REF!

Bond costs #REF! Rate / year Months


Advance payment bond 0% #REF! 0.55% #REF! #REF! #REF! #REF!
Performance bond 0% #REF! 0.55% #REF! #REF! #REF! #REF!
Guarantee bond 0% #REF! 0.55% #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Insurances costs #REF! Rate
Freight #REF! 0.15% #REF! #REF! #REF! #REF!
Third Party Liability #REF! 0.00% #REF! #REF! #REF! #REF!
Contractor All Risks (if applicable) #REF! 0.11% #REF! #REF! #REF! #REF!
Professionnal Indemnity #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Taxes and Duties
Sur Tax (13% Svc or 7% of Supp VAT) #REF! 0.91% 0.00% #REF! #REF! #REF! #REF!
Custom duties #REF! #REF! #REF! #REF! #REF!
Other duties #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Other financial costs
Financial costs #REF! 0.50% #REF! #REF! #REF! #REF!
L/C costs #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Other costs
Agent fees #REF! #REF! #REF! #REF! #REF!
Development fees #REF! #REF! #REF! #REF! #REF!
Leader fee #REF! #REF! #REF! #REF! #REF!
Engineering Stamps #REF! #REF! #REF! #REF! #REF!
Governmental stamp duty tax #REF! 0.03% #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Risks & Contingencies / Warranty (as a % of Tender Price)
Other Risks & Contingencies - R.A.F. for details #REF! 2.00% 0.00% 0.00% #REF! #REF! #REF! #REF!
Provisions for Warranty #REF! 2.00% 0.00% 0.00% 0.00% #REF! #REF! #REF! #REF!
Sub total costs on a % basis on BEIES Tender Price 5.70% 0.00% 0.00% 0.00%
Total costs on a % basis on BEIES Tender Price 5.70%

SUB TOTAL - OTHER COSTS computed on a % basis #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
OTHER COST not computed as a % of BEIES Tender Price

Bond costs Currency Basis Rate / year Months


Tender bond #REF! #REF! #REF! #REF! #REF!
Advance payment bond #REF! #REF! #REF! #REF! #REF!
Performance bond #REF! #REF! #REF! #REF! #REF!
Guarantee bond #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Insurances costs
Freight #REF! #REF! #REF!
Third Party Liability #REF! #REF! #REF!
Contractor All Risks #REF! #REF! #REF!
Professionnal Indemnity #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Taxes and Duties Currency Basis Rate
Custom duties #REF! #REF! 10% #REF! #REF! #REF! #REF!
Custom Clearance #REF! #REF! 0.30% #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
RMB #REF! #REF! #REF!
#REF! 0 #REF! #REF! #REF!
#REF! #REF! #REF!
Other financial costs Currency Basis Rate
Hedging Euro #REF! #REF! #REF! #REF! #REF!
Financial Costs #REF! #REF! #REF!
L/C costs #REF! #REF! #REF!
#REF! #REF! #REF!
Other costs
Agent fees #REF! #REF! #REF!
Development fees #REF! #REF! #REF!
Leader fee #REF! #REF! #REF!
Inspection fees #REF! #REF! #REF!
#REF! #REF! #REF!
Risks & Contingencies / Warranty (as Amounts)
Other Risks & Contingencies - R.A.F. for details #REF! #REF! #REF!
Provisions for Warranty #REF! #REF! #REF!
Specific R&C on RHDHV if in % of total RHDHV 0 #REF! #REF! #REF!
Specific R&C on BEIES if in % of total BEIES 0 #REF! #REF! #REF!
Specific R&C on Overeas if in % of total Overeas 0 #REF! #REF! #REF!
Specific R&C on Atal if in % of total Atal 0 #REF! #REF! #REF!

SUB TOTAL - OTHER COSTS not computed on a % basis #REF! #REF! #REF! #REF!
#REF! #REF! #REF!

OTHER COSTS computed without margin


(taxes and duties, provisional sums, etc.)
Currency Basis Rate

Custom duties #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Contract tax (enter basis CV) Currency Basis Rate #REF! #REF! #REF!
Service VAT #REF! 6.00% 0 #REF! #REF! #REF!
Supply VAT #REF! #REF! 13.00% #REF! #REF! #REF! #REF!
Provisional Sum #REF! #REF! #REF!
#REF! #REF! #REF!

SUB TOTAL - OTHER COSTS computed without margin #REF! #REF! #REF! #REF!
#REF! #REF! #REF!

626346647.xlsx
月份 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 其余

日程 开始 结束
#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

#REF! #REF! #REF! Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 其余

员工人天 合计
511 105 40 40 40 40 40 45 40 4 5 5 0 4 0 0 0 0 0 0 4 5 0 0 0 4 0 90 0 0 0 0 0 0 0 0 0 0

项目管理
项目总经理 文志军 0 0.0
项目管理总监 1 0 0.0
项目经理 1 0
计划经理 1 0
项目财务经理 1 0
文档管理工程师 1 0
HSE工程师 1 0
翻译 0
小计 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

工程设计
项目总工程师 许建民 22 5.0 5.0 4.0 4.0 4.0
设计总监 梅慧瑞 339 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 4.0 5.0 5.0 5.0
高级工艺工程师 1 0
工艺工程师 2 60 60.0
详细设计经理 1 0
高级管道工程师
高级机械工程师 1 0
机械工程师 2 0
高级电气工程师 1 0
电气工程师 2 0
高级仪控工程师 1 0
仪控工程师 2 0
高级土建工程师 1 0
高级水力工程师 1 0
BIM工程师 2 0
绘图工程师 1
总图
给排水工程师
消防工程师
暖通工程师 0
小计 421 105.0 40.0 40.0 40.0 40.0 40.0 45.0 40.0 4.0 5.0 5.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 5.0 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

采购
采购总监 1 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
采购经理 1 0 0.0 0.0
设备运输 1 0 0.0 0.0 0.0
质量工程师 1 0
合同管理 0
0
小计 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

施工安装支持
现场总监 文志军 0
现场经理 1 0
现场工艺工程师 2 0
现场机械工程师 1 0
现场水力工程师 1 0
现场电气工程师 1 0
现场仪控工程师 1 0
质量工程师 1 0
HSE工程师 1 0
BIM工程师 1 0
0
小计 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

启动和调试
Nereda调试总监 周恩胜 0
高级工艺工程师 3 90 90.0
水力工程师 1 0
高级机械工程师 2 0
高级电气工程师 2 0 0.0 0.0 0.0 0.0 0.0 0.0
高级仪控工程师 3 0
安全工程师
化验工程师 2 0
小计 90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 90.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

缺陷责任期技术指导
Nereda运行总监 周恩胜 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
工艺工程师 1
水力工程师 1 0
机械工程师 1 0
电气工程师 1 0
仪控工程师 1 0
化验工程师 1 0
小计 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

626346647.xlsx
北控工业部分 进口-1 相当于 投标总价 投标总价 投标总价
员工 ALL RMB EURO RMB RMB HKD EURO
1.000 7.783 1.000 1.000 0.920 7.783
北控工业 外部员工或其他
单位 数量 单位 数量 币种
费率 days 费率 days
in RMB
项目管理
项目总经理 (文志军) 19000 0 RMB 0 0 0 0 0 0
项目管理总监 (1) 10400 0 0 RMB 0 0 0 0 0 0
项目经理 (1) 2600 0 0 RMB 0 0 0 0 0 0
计划经理 (1) 0 0 RMB 0 0 0 0 0 0
项目财务经理 (1) 2000 0 0 RMB 0 0 0 0 0 0
文档管理工程师 (1) 1300 0 RMB 0 0 0 0 0 0
HSE工程师 (1) 1300 0 RMB 0 0 0 0 0 0
翻译 () 0 RMB 0 0 0 0 0 0
小计 0 0 0 0 0 0 0 0 0
工程设计
项目总工程师 (许建民) 12500 22 RMB 275,000 0 0 275,000 298,946 35,332
设计总监 (梅慧瑞) 9400 339 RMB 3,186,600 0 0 3,186,600 3,464,072 409,415
高级工艺工程师 (1) 870 0 EURO 0 0 0 0 0 0
工艺工程师 (2) 2600 60 0 RMB 156,000 0 0 156,000 169,584 20,043
详细设计经理 (1) 2000 0 0 RMB 0 0 0 0 0 0
高级机械工程师 (1) 1300 0 0 RMB 0 0 0 0 0 0
机械工程师 (2) 2600 0 0 RMB 0 0 0 0 0 0
高级电气工程师 (1) 1700 0 0 RMB 0 0 0 0 0 0
电气工程师 (2) 1700 0 RMB 0 0 0 0 0 0
高级仪控工程师 (1) 2600 0 RMB 0 0 0 0 0 0
仪控工程师 (2) 2000 0 0 RMB 0 0 0 0 0 0
高级土建工程师 (1) 1700 0 0 RMB 0 0 0 0 0 0
高级水力工程师 (1) 2300 0 0 RMB 0 0 0 0 0 0
BIM工程师 (2) 1700 0 RMB 0 0 0 0 0 0
暖通工程师 () 1300 0 RMB 0 0 0 0 0 0
小计 421 0 0 3,617,600 0 0 3,617,600 3,932,601 464,790
采购 0 0 0
采购总监 (1) 870 0 EURO 0 0 0 0 0 0
采购经理 (1) 3600 0 RMB 0 0 0 0 0 0
设备运输 (1) 1700 0 RMB 0 0 0 0 0 0
质量工程师 (1) 1700 0 RMB 0 0 0 0 0 0
合同管理 () 0 RMB 0 0 0 0 0 0
() 0 RMB 0 0 0 0 0 0
小计 0 0 0 0 0 0 0 0 0
施工安装支持
现场总监 (文志军) 6400 0 0 RMB 0 0 0 0 0 0
现场经理 (1) 2100 0 0 RMB 0 0 0 0 0 0
现场工艺工程师 (2) 1700 0 RMB 0 0 0 0 0 0
现场机械工程师 (1) 870 0 EURO 0 0 0 0 0 0
现场水力工程师 (1) 2000 0 0 RMB 0 0 0 0 0 0
现场电气工程师 (1) 2300 0 0 RMB 0 0 0 0 0 0
现场仪控工程师 (1) 1700 0 0 RMB 0 0 0 0 0 0
质量工程师 (1) 1700 0 0 RMB 0 0 0 0 0 0
HSE工程师 (1) 1300 0 0 RMB 0 0 0 0 0 0
BIM工程师 (1) 0 0 RMB 0 0 0 0 0 0
() 0 RMB 0 0 0 0 0 0
小计 0 0 0 0 0 0 0 0 0
启动和调试
Nereda调试总监 (周恩胜) 870 0 EURO 0 0 0 0 0 0
高级工艺工程师 (3) 2000 90 RMB 180,000 0 0 180,000 195,673 23,126
水力工程师 (1) 2000 0 RMB 0 0 0 0 0 0
高级机械工程师 (2) 2000 0 RMB 0 0 0 0 0 0
高级电气工程师 (2) 0 RMB 0 0 0 0 0 0
高级仪控工程师 (3) 0 RMB 0 0 0 0 0 0
化验工程师 (2) 0 0 RMB 0 0 0 0 0 0
小计 90 0 0 180,000 0 0 180,000 195,673 23,126
缺陷责任期技术指导 0 0
Nereda运行总监 (周恩胜) 2600 0 RMB 0 0 0 0 0 0
水力工程师 (1) 2000 0 RMB 0 0 0 0 0 0
机械工程师 (1) 1700 0 RMB 0 0 0 0 0 0
电气工程师 (1) 0 RMB 0 0 0 0 0 0
仪控工程师 (1) 0 RMB 0 0 0 0 0 0
化验工程师 (1) 0 RMB 0 0 0 0 0 0
小计 0 0 0 0 0 0 0 0 0
0
Total number of days 511 0 0 0
0
Costs directly related to staff not included in the Unit Rates 0 0 0 0
Compensation for long stay 0 0 0 0 0
0 0 0 0
0 0 0 0
小计 0 0 0 0 0 0 0 0
Others 0 0 0 0
Translation 0 0 0 0
Subcontracted Studies(soil, piping…) 0 0 0 0
local engineering 0 0 0 0
0 0 0 0
小计 0 0 0 0 0 0 0 0
0
Provisions for fixed prices 0
RMB 0.00% all 0 0 0 0 0 0
0
Risks / contingencies 0 0 0 0
RMB 0.00% all 0 0 0 0 0 0
0 0 0 0

小计 - 员工部分成本 3,797,600 0 0 3,797,600 4,128,275 487,916

备注 :

626346647.xlsx
#REF! #REF! #REF!
SITE COSTS 现场费用 #REF! #REF! #REF!
#REF! #REF! #REF!
Travels and expenses 差旅费用 Travels Unit Cost - 交通/次 Daily Unit Costs - 日常/天
#REF! 3600 1150
Travel sheet details? Add X 0
0
0
Project management - 项目管理 10 60 105,000 #REF! #REF!
Engineering - Design - 工程设计-现场 40 240 420,000 #REF! #REF!
Procurement - 采购 5 30 52,500 #REF! #REF!
Erection / Installation - 安装 3 18 31,500 #REF! #REF!
Start-up & Commissioning - 启动调试 15 300 399,000 #REF! #REF!
Services, Technical Assist & Operation - 服务 3 18 31,500 #REF! #REF!
Ceremonies/invitations - 庆典 3 18 31,500 #REF! #REF!
Engineer factory tests - 设备工厂测试 2 12 21,000 #REF! #REF!
Training Client' staff -为客户员工培训 0 #REF! #REF!
Sub total 81 0 0 0 696 0 0 0 1,092,000 #REF! #REF!
Job site costs 工作现场 币种 单价 数量 Unit - 单位 #REF!
Site Security - 安全 #REF! 500 20 #REF! #REF! #REF!
Stationary - 文具 #REF! 500 20 每月 #REF! #REF! #REF!
Cranes - 起重 #REF! #REF! #REF! #REF!
Cars - 汽车 #REF! 每月 #REF! #REF! #REF!
Rentals - 租借 #REF! #REF! #REF! #REF!
Office - 办公室 #REF! #REF! #REF! #REF!
Furniture - 家具 #REF! #REF! #REF! #REF!
Office equip: phone, fax, copier - 办公设备 #REF! #REF! #REF! #REF!
Consumables: water, power… - 水电消耗 #REF! #REF! #REF! #REF!
Communications Allowance - 通讯补贴 #REF! 200 20 每人每月 #REF! #REF! #REF!
O&M Manuals, As-built Dwgs - 操作手册 #REF! #REF! #REF! #REF!
Site demobilisation work - 现场拆除 #REF! #REF! #REF! #REF!
Meals Allowance - 餐食补贴 #REF! 90 每人每月 #REF! #REF! #REF!
Entertainment - 招待费用 #REF! 2,000 5 每月 #REF! #REF! #REF!
Sub total #REF! #REF! #REF!
Process commissioning costs 工艺调试
Chemicals - 药剂 #REF! #REF!
Analyses - 分析 #REF! #REF!
Power and water - 水电 #REF! #REF!
Others - 其他 #REF! #REF!
#REF! #REF!
Other site costs 其他现场费用
From Accommodation sheet 另附页 0 #REF! #REF!
#REF! #REF!
#REF! #REF!
Sub total 0 #REF! #REF!
Provision for fixed prices Part in #REF!
0 0.0% #REF! #REF! #REF!
Risks & Contingencies Part in #REF!
On Site Costs - R.A.F. for details 0 0.0% #REF! #REF! #REF!

SUB TOTAL - SITE COSTS / 现场费用小计 #REF! #REF! #REF!


#REF! #REF!

Comments 备注 :
- 绝大多数的现场公共服务由安乐 >>> 土建总包商提供。
- 差旅费用需要计算。