One-Line Diagram - OLV1 (Load Flow Analysis)

FROM PANEL GL 13
100 MVAsc
GENSET 350 KVA
298 kW

Cable1
1-3/C 70
MCCB 3
LOCATION : GL 14 SKG BUNYU
630 A 0 A
MV SWITCHGEAR GL 14 LBS2 630 A
Bus1
6.6 kV 6600 VAC, 3 Ph, 50 Hz, 3P

0 A LBS1 630A 0 A LBS1 630A3


MCCB 5
Bus63 630 A
0.4 kV

MCCB 7
GL 3
630 A Cable (3c x 70) 0 MVA

1-4/C 150 TRANSFORMER GL14


1-4/C 95 250 kVA
Cable56
Cable60
4 x 1 x 400 mm
4 X 120 mm4

LOCATION : GL 14 SKG BUNYU


LOCATION : PANEL ROOM SKG BUNYU
TERMINASI PNL DBLE THROW 400 VAC, 3 Ph, 50 Hz, 3P + N
0.4 kV PANEL LV GL 14 MCCB 1 PANEL LV gs 4
Bus2 630 A MCCB-62
0.4 kV
400 A
0.4 kV

MCCB-44 MCCB-2 MCCB-81 MCCB-7 MCCB-79 MCCB-82


200 A 100 A 100 A 50 A 50 A 400 A MCCB-52 MCCB-104
MCCB-68 MCCB-107 MCCB-109
250 A MCCB-102 100 A 100 A 100 A 100 A
160 A
Cable34 Cable78 Cable80
Cable45
SPARE2 0 kVA 0 kVA 1-4/C 95
1-4/C 10 0 kVA SPARE 1 SPARE 3 1-4/C 10 1-4/C 10 1-4/C 10 1-4/C 10
4 X 120 mm Cable54 0 kVA 0 kVA
Cable3 SPARE 5 SPARE 7

AIR STARTING PANEL


PANEL PENERANGAN ESP B-180 11 kVA
4 X 120 mm2 25 kVA 0 kVA CONDENSATE PUMP1
AIR INS PANEL 15 HP
11 kVA
CONDENSATE PUMP 2
15 HP

PANEL LV SKG BUNYU MCCB-92


2000 A
0.4 kV

MCCB-94 MCCB-96
MCCB-93 MCCB-97 MCCB-98 MCCB-95 MCCB-99 MCCB-100
10 A 10 A
50 A 50 A 50 A 16 A 10 A 10 A 10 A 15 A 20 A
16 A 10 A 15 A 15 A 15 A MCCB-118 MCCB-120
MCCB-111 MCCB-112 MCCB-114
MCCB-115 MCCB-116 MCCB-117
Cable69 Cable73
Cable83
1-4/C 10 1-4/C 10 1-4/C 16 spare 3 spare 4 spare 5
UPS (SPARE) 0 kVA 0 kVA 0 kVA spare 14 spare 16
spare 7 spare 8 spare 10 spare 11 spare 12 spare 13 0 kVA 0 kVA
0 kVA 0 kVA 0 kVA 0 kVA 0 kVA 0 kVA 0 kVA
transformer feeder

page 1 21:28:29 Jul 26, 2022 Project File: SKG BUNYU


One-Line Diagram - OLV1 (Load Flow Analysis)
transformer feeder
25 kVA
OIL CATCHER 2
7.5 HP 7.5 HP
OIL CATCHER 1 FIRE WTR CNTRL FEEDER
60 kVA

page 2 21:28:29 Jul 26, 2022 Project File: SKG BUNYU