This document is a payment sheet for daily laborers working on a pre-school construction project in Ethiopia. It lists 9 laborers, their roles, daily wages, and the number of days worked in November. The total pay, income tax withholdings, and net pay are calculated for each worker. An engineer comments that masonry work and steel reinforcement are progressing according to the design and specification, with the project now 30% complete.
This document is a payment sheet for daily laborers working on a pre-school construction project in Ethiopia. It lists 9 laborers, their roles, daily wages, and the number of days worked in November. The total pay, income tax withholdings, and net pay are calculated for each worker. An engineer comments that masonry work and steel reinforcement are progressing according to the design and specification, with the project now 30% complete.
This document is a payment sheet for daily laborers working on a pre-school construction project in Ethiopia. It lists 9 laborers, their roles, daily wages, and the number of days worked in November. The total pay, income tax withholdings, and net pay are calculated for each worker. An engineer comments that masonry work and steel reinforcement are progressing according to the design and specification, with the project now 30% complete.
Daily Laborers Attendance And Payment Sheet For The Month Of November Previous Payemnt Date:__________________________ Current Payemnt Date:10/10/2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 S.N Name Type of Work Daily Wage 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total 31 worked days Gross Pay Income Tax Net Pay Signature Masonary,Bar x x x x x x x x x x 1 Yohanis Kebede Bending 450 10 4,500.00 597.50 3,902.50 Masonary,Bar x x x x x x x x x x 2 Tesfaye Nigusie Bending 450 10 4,500.00 597.50 3,902.50 Masonary,Bar x x x x x x x x x x 3 Tesfaye Eshetu Bending 450 10 4,500.00 597.50 3,902.50 Masonary,Bar x x x x x x x x x x 4 Mekoni Alemu Bending 450 10 4,500.00 597.50 3,902.50 Masonary,Bar x x x x x x x x x x 5 Tefera Ababu Bending 450 10 4,500.00 597.50 3,902.50 Masonary,Bar x x x x x x x x x x 6 Boki Dida Bending 450 10 4,500.00 597.50 3,902.50 x x x x x x x x x x 7 Fanosi Tolasa Excavation 250 10 2,500.00 232.50 2,267.50 x x x x x x x x x x 8 Shimalis Arado EXcavation 250 10 2,500.00 232.50 2,267.50 x x x x x x x x x x 9 Fayise Dame Excavation 250 10 2,500.00 232.50 2,267.50 Total 34,500.00 4,282.50 30,217.50 Project/phase work summary(summary of change in the work) Previous work stage ___________________________ Previous work Status(figures) 10% Current work stage Excuted as per spe. &design Current work stage(figures) 30% Change in status(figures) 20% The Enginner/suppervisor comment on project/phase progress: On progress. Reinforcemet bar for grade beam, Masonary work executed as per design and Specification. ______________________________________________________________________________________________________________________________________________________________________
Prepared by :Nantukina Teshome Checked by:Muluken Tsegaye Approved by:Selamu Nigussu
Construction works Engineer Accountant Projects Manager Signature:________________________ Signature:________________________ Signature:________________________ Date 10/11/2022 Date 10/11/2022 Date 10/11/2022