You are on page 1of 47

SB2-VB, LLC Phase III - Pads B1, B2,

THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 01
GRAPHIC SCALES SHEET INDEX
01. Cover
02. Sheet Index
1/16” = 1’ 03. Architectural Site Plan
04. Exterior Materials
05. Elevations - Building B1
06. Elevations - Building B1
07. Elevations - Building B2
0 8 16 24 32 48 08. Elevations - Building B2
09. Elevations - Building C
10. Elevations - Building C
11. Elevations - Building C
12. Elevations - Building E
13. Perspective - Building B1
14. Perspective - Building B1
1/8” = 1’ 15. Perspective - Building B1
16. Perspective - Building B1
17. Perspective - Building B1
18. Perspective - Building B1
19. Perspective - Building B1
20. Perspective - Building B1
0 4 8 12 16 24 21. Perspective - Building B2
22. Perspective - Building B2
23. Perspective - Building B2
24. Perspective - Building B2
25. Perspective - Building B2
26. Perspective - Building B2
27. Perspective - Building B2
1” = 30’ 28. Perspective - Building B2
29. Perspective - Building C
30. Perspective - Building C
31. Perspective - Building C
32. Perspective - Building C
0 30 60 90 33. Perspective - Building C
34. Perspective - Building C
35. Perspective - Building C
36. Perspective - Building C
37. Perspective - Building C
38. Perspective - Building C
39. Perspective - Building E
1” = 200’ 40. Perspective - Building E
41. Perspective - Building E
42. Perspective - Building E
43. Perspective - Building E
44. Perspective - Building E
45. Perspective - Building E
0 200 400 600 46. Perspective - Building E
47. Tenant Patio Design Criteria
48. Tenant Patio Design Criteria - Reference Images
49. Tenant Patio Design Criteria - Reference Images
50. Tenant Patio Design Criteria - Reference Images
51. Tenant Patio Design Criteria - Reference Images

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION SHEET INDEX 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 02
BLDG A BLDG B1
BLDG E
BLDG F

A
A

A
BLDG B2 BLDG G

BLDG H/I
A

BLDG C

BLDG J

SHEET KEYNOTES: ARCHITECTURAL SITE PLAN


A. SES PANEL (EXTERIOR ACCESS), FIRE RISER / ROOF ACCESS (LANDLORD ROOM). A
Scale: 1” = 60’-0” N
B. HYDRANT

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION ARCHITECTURAL SITE PLAN 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 03
BRK1 BRK2 BRK4 BRK5 PT1 PT2 PT3
Black Diamond Velour Buckskin Sands Cooley Station Brick - ALT Pewter 757 Painted Metal Painted Metal Painted Metal
Beldon Brick Endicott 450A Bonfire Summit Brick Color: Feather Down OC-6 Color: HC-168 - Chelsea Grey Color: OC-48 Hazy Skies
Mortar Color: Charcoal 47 Mortar Color: Walnut 106 Summit Brick Mortar Color: Navajo Brown 35 Benjamin Moore Benjamin Moore Benjamin Moore
Mortar Color: Black 10

MTL3 MTL6 MTL7 MTL8 MTL9 MTL10 PT4


7/8” Corrugate 7/8” Corrugate Perforated Composite Metal Panels TL-17 TL-17 T-10-A Painted Metal
Color: Galvalume Color: Galvalume Color: Charcoal Grey 62 Color: Weath Copper (W50) Color: Sandstone (W51) Color: Ash Grey (25) Color: AC-26 Ozark Shadow
Metal Sales Metal Sales ATAS Metal Sales Metal Sales Metal Sales Benjamin Moore

STU1 STU3
EIFS - Medium Finish EFIS - Medium Finish
Color: Mulch 32133 Color: 31435
Sto Sto

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION EXTERIOR MATERIALS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 04
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 13
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 14
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 15
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 16
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 17
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 18
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 19
B1

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B1 - PERSPECTIVE VIEWS 26 2019
15 NOV SEPTIN10
2019MARCH 2017
PROGRESS 20
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
21
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
22
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
23
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
24
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
25
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
26
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
27
B2

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING B2 - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
28
C

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
29
C

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
30
C

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
31
C

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
32
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
33
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
34
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
35
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
36
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
37
C

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING C - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
38
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
39
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
40
E

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
41
E

KEY PLAN
N
Scale: 1” = 200’-0”

SHEET KEYNOTES:
A. SITE AMENITIES AS SHOWN, BY TENANT PER TENANT DESIGN CRITERIA

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
42
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
43
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
44
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
45
E

KEY PLAN
N
Scale: 1” = 200’-0”

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION BUILDING E - PERSPECTIVE VIEWS 10 MARCH 2017
26 SEPT 2019
46
SB2-VB, LLC Phase III - Pads B1, B2,
THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION VILLAGE CENTER 10 MARCH 2017
26 SEPT 2019
47
SB2-VB, LLC Phase III - Pads B1, B2,
THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION VILLAGE CENTER 10 MARCH 2017
26 SEPT 2019
48
SB2-VB, LLC Phase III - Pads B1, B2,
THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION VILLAGE CENTER 10 MARCH 2017
26 SEPT 2019
49
SB2-VB, LLC Phase III - Pads B1, B2,
THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION VILLAGE CENTER 10 MARCH 2017
26 SEPT 2019
50
The intended goal of this Tenant Patio Design Criteria is to assist the Tenant in designing their exterior patio areas and ultimately elevate and compliment the shopper /
user experience at Verde at Cooley Station. These recommendations and requirements are intended help Tenants increase their visibility and brand presence by creating
quality outdoor patio environments. These elements will encourage year-around use by providing permanent overhead protection from the sun, as well as create more inviting
and comfortable patio spaces.

SHADE OPTIONS PATIO SURROUND FFA & PLANTSCAPE LIGHTING

TENANT B2A LARGE OPERABLE UMBRELLA The Tenant is to provide a visibly defined The Tenant is to provide exterior seating and dining The Tenant is to provide accent lighting
(BY TENANT) perimeter surround for their exterior patio area. amenities that are welcoming, comfortable, durable, and integrated with the large umbrellas that
Tucci - www.tucci.com Handrails, or other containment elements, may selected as an extension of the Tenant’s brand. Accent enhances the exterior patio area as well as
Shadescapes Americas - consist of metal, cable, and/or accent hardwood colors and materials that compliment the Verde at Cooley accentuates the overhead umbrella fabric.
www. shadescapesamericas.com materials, and shall incorporate the use of larger- Station aesthetic are encouraged. Large decorative pots Fixture color temperature should be 3000K
USA Shade - www.usa-shade.com scaled decorative pots and plantscape that provide and plantscape that provide scale and relief from the hot unless otherwise approved by the landlord.
scale and relief from the hot desert environment. desert environment are also expected.

TENANT C1

TENANT E3

NOTES: 1. Where applicable by liquor law, the Tenant is to provide a continuous and controlled barrier for the exterior patio use area.
2. Automated mister and/or fan cooling systems may be considered and are encouraged, but must be integrated with the designated overhead shade element.
3. All proposed tenant designs subject to review / approval by the Landlord as well all local governing jurisdictions.

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION
TENANT PATIO DESIGN CRITERIA
FOR EXTERIOR PATIO AREAS
10 MARCH 2017
26 SEPT 2019
51
Larger-scaled operable umbrellas with accent seating and landscape amenities

Hard canopy with familiar Cooley Station vernacular

Overhead trellis feature with integrated landscape and lighting

Operable overhead fabric structure - soft daylighting

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION
TENANT PATIO DESIGN CRITERIA
SHADE OPTIONS - REFERENCE IMAGES
10 MARCH 2017
26 SEPT 2019
52
Alternative materials and methods for creating tenant boundaries and enhancing tenant brand and identity

Larger scaled planter boxes and landscape that have physical presence

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION
TENANT PATIO DESIGN CRITERIA
PATIO SURROUND - REFERENCE IMAGES
10 MARCH 2017
26 SEPT 2019
53
Contemporary looking / sculptural native plant palette

Seating and amenities reinforce tenant brand

Decorative elements support the Verde at Cooley Station look

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION
TENANT PATIO DESIGN CRITERIA
FFA & PLANTSCAPE - REFERENCE IMAGES
10 MARCH 2017
26 SEPT 2019
54
Feature and accent lighting of architecture and landscape elements

Creative / accent lighting and ceiling elements

Sculptural arrangement of lighting fixtures

SB2-VB, LLC Phase III - Pads B1, B2,


THE SHOPS AT C, E
WALNUT CREEK CoW Pre-Application
AT COOLEYDocument
STATION
TENANT DESIGN CRITERIA
LIGHTING - REFERENCE IMAGES
10 MARCH 2017
26 SEPT 2019
55

You might also like