Critical Concurrent
Excusable?
Yes No
Excusable Non-Excusable
Unplanned events beyond the Foreseeable events within
control of Contractor Contractor’s control:
• Acts of God • Late Performance of Subs
• Flood / Fire • Poor Work
• Owner-Directed Change • Inadequate equipment
• Errors / Omissions
Compensable?
Yes No
Compensable Non-Compensable
Contractor entitled to more Assess Delay’s Impact Although excusable delay may
time and possibly money have occurred, the Contractor
is not entitled to compensation
• Owner-Directed Change • Foresight (As Planned)
• Errors / Omissions • Hindsight (As Built) • Acts of God
• Flood / Fire
• Contemporaneous
Projects may define their own business processes around how to capture, categorize and analyze
delays, but the above categories are widely accepted best practice in construction delays.
Delay Reporting
Delays are typically captured and reported on a delay log. Below is an example: