You are on page 1of 42

51

kartik Pawale Portfolio A


(Final Sheets)
WD I

2021-22
Vivekanand Institute of Technology’s
Padmabhushan   Dr.   Vasantdada   Patil   College   of   Architecture
274/2, 275/2, 282, Aditya Nisarg At Pirangut, Tal. Mulshi, Dist. Pune 412115 | tel: 020-20291299, 20291308, 60129033, 65349033 | email: pvpcoapune@gmail.com,vitcoapune@gmail.com | web: www.pvpcoapune.com |
blog: www.pvpcoapuneblog.blogspot.com

Academic Year: 2020 – 2021 Semester: V (2019 pattern) Class: Third Year B. Arch. Day & Date: Fri, 1st Oct 2021
Subject: Working Drawing I ( WD-I ) Topic: INDEX - Portfolio A - Final Sheets Brief No. 10.02
Team: Ar. Devendra Deshpande, Ar. Vaibhav Kulkarni, Ar. Ashish Srivastava, Ar. Nikita Khade Prepared by: DD

INDEX of WORKING DRAWING


Name of Student: Pawale Kartik

Sr. No. Drawing Title Drawing Number Sheet Number


A. Site Level Drawings
1 Setting Out Plan (Phase 1) WDST.01 1 / 15
3 Centre Line Plan WDST.02 2 / 15
B. Building Floor Plans
1 Ground Floor Plan WDPL.01 3 / 15
2 First Floor Plan WDPL.02 4 / 15
3 Second Floor Plan WDPL.03 4 / 15
4 Terrace Floor Plan WDPL.04 5 / 15
5 Roof Plan WDPL.05 6 / 15
C. Building Sections
1 Section AA WDSC.01
2 Section BB WDSC.02
3 Section CC WDSC.03
D. Building Elevations
1 Elevation 1 WDEL.01 9 / 15
2 Elevation 2 WDEL.02 9 / 15
3 Elevation 3 WDEL.03
4 Elevation 4 WDEL.04
E. Skin Sections
1 Building Skin Section 1 WDSS.01
2 Building Skin Section 2 WDSS.02
F. Civil Details
1 Opening Details WDDT.01
2 Kitchen Counter Detail WDDT.02
3 Railing Fixing Details WDDT.03

Internal Examiner External Examiner

Subject In-charge Seal


Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ ed,‌‌28‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌W ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Checklist‌‌–‌‌Setting-Out‌‌Plan‌B
‌ rief‌‌No.‌0‌ 1.01‌T ‌ eam:‌A
‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Setting-Out‌‌Plan:‌‌(‌Scale‌‌-‌‌1:100‌‌/‌‌1:200)‌‌  ‌
Setting‌‌out‌‌of‌‌a‌‌structure‌‌establishes‌‌the‌‌extents‌‌of‌‌the‌‌building‌‌foot‌‌print‌‌/‌‌plinth‌‌area‌‌and‌‌exact‌‌location‌‌of‌‌the‌‌structure‌‌on‌‌the‌  ‌
given‌‌site.‌‌Setting‌‌out‌‌plan‌‌is‌‌usually‌‌the‌‌first‌‌drawing‌‌in‌‌the‌‌WD‌‌set.‌‌It‌‌is‌‌used‌‌to‌‌demarcate‌‌the‌‌outline‌‌of‌‌a‌‌building‌‌on‌‌site,‌‌with‌  ‌
reference‌‌to‌‌either‌‌site‌‌boundary‌‌line‌‌and/or‌‌an‌‌existing‌‌permanent‌‌structure‌‌on‌‌site.‌   ‌ ‌
To‌‌locate‌‌the‌‌corners‌‌of‌‌a‌‌building,‌‌simple‌‌geometrical‌‌method‌‌of‌‌triangulation‌‌is‌‌adopted.‌P ‌ rocedure‌o‌ f‌‌setting‌‌out‌‌plan‌‌is‌‌–‌‌select‌  ‌
an‌o
‌ rigin‌‌point‌,‌‌establish‌t‌ wo‌‌reference‌‌points‌(‌ corners‌‌of‌‌the‌‌building‌‌near‌‌to‌‌origin‌‌point)‌‌w.r.t.‌‌to‌‌origin‌‌point,‌‌draw‌r‌ eference‌‌line‌, ‌ ‌
complete‌‌the‌‌building‌‌line‌‌with‌‌given‌c ‌ heck‌‌dimensions‌-‌ ‌‌from‌‌site‌‌boundary,‌‌existing‌‌structures,‌‌station‌‌points‌‌and‌‌diagonal‌ 
dimensions.‌‌A‌‌permanent‌‌level‌‌/‌‌bench‌‌mark‌‌need‌‌to‌‌be‌‌established‌‌which‌‌will‌‌act‌‌as‌‌a‌‌common‌‌reference‌‌level‌‌for‌‌entire‌‌project,‌‌this‌  ‌
point‌‌established‌‌in‌‌reference‌‌to‌‌the‌‌MSL‌‌(mean‌‌sea‌‌level),‌   ‌ ‌
1.‌S
‌ tation‌‌Point:‌i‌t‌‌is‌‌a‌‌permanent‌‌point‌‌for‌‌a‌‌campus‌‌project‌‌from‌‌which‌‌references‌‌/‌‌check‌‌dimensions‌‌for‌‌the‌‌buildings‌‌/ ‌ ‌
structures‌‌in‌‌the‌‌campus‌‌can‌‌be‌‌established‌‌    ‌
2.‌O‌ rigin‌‌Point:‌i‌t‌‌is‌‌any‌‌permanent‌‌point‌‌on‌‌the‌‌site.‌‌Generally‌‌origin‌‌point‌‌remains‌‌constant‌‌throughout‌‌the‌‌project‌‌  
3.‌R
‌ eference‌‌Points:‌t‌hese‌‌are‌‌established‌‌points‌‌on‌‌the‌‌site‌‌in‌‌order‌‌to‌‌draw‌‌a‌‌building‌‌line‌‌on‌‌site.‌‌    ‌
4.‌R‌ eference‌‌Line:‌a ‌ ‌‌straight‌‌line‌‌established‌‌on‌‌the‌‌site‌‌w.r.t.‌‌Origin‌‌Point‌‌to‌‌locate‌‌the‌‌large‌‌curved‌‌shaped‌‌building‌‌lines.‌‌  
5.‌C
‌ heck‌‌Dimensions:‌d ‌ iagonal‌‌dimensions‌‌given‌‌to‌‌cross‌‌check‌‌the‌‌actual‌‌dimensions‌‌of‌‌established‌‌building‌‌lines.‌‌6.‌‌  
Datum‌‌Level:‌P ‌ ermanent‌‌reference‌‌level‌‌for‌‌the‌‌execution‌‌work‌‌    ‌
There‌‌is‌‌difference‌‌between‌‌a‌s ‌ etting‌‌out‌‌plan‌a‌ nd‌‌a‌s
‌ ite‌‌plan‌:‌‌setting‌‌out‌‌plan‌‌gives‌‌the‌‌location‌‌and‌‌position‌‌of‌‌a‌‌proposed‌  ‌
structure‌‌on‌‌the‌‌site,‌‌whereas‌‌site‌‌plan‌‌explains‌‌relation‌‌of‌‌a‌‌structure‌‌to‌‌the‌‌site‌‌in‌‌terms‌‌of‌‌access,‌‌circulation,‌‌vegetation,‌‌parking,‌  ‌
hard‌‌and‌‌soft‌‌paving‌‌areas‌‌etc.‌   ‌

Check-List:‌  ‌
Project‌‌Name‌‌–W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌SETTING‌‌OUT‌‌PLAN‌‌) ‌ ‌ Drawing‌  ‌ WDST‌‌-‌‌01‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Site‌‌boundary‌‌line‌‌with‌‌access‌‌road‌(‌continuous‌‌line‌‌–‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Existing‌‌Structure‌‌and‌‌Existing‌‌Trees‌‌(if‌‌any‌‌continuous‌‌line‌‌–‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Margin‌‌/‌‌Setback‌‌lines‌‌on‌‌all‌‌sides‌‌of‌‌the‌‌site‌(‌dashed‌‌line‌‌–‌‌grey‌‌colour)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Plan‌‌showing‌‌building‌‌footprint‌(‌continuous‌‌thick‌‌line‌‌–‌‌0.3‌‌mm)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Offsets‌‌in‌‌building,‌‌position‌‌of‌‌courtyards‌‌and‌‌open‌‌to‌‌sky‌‌spaces‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Station,‌‌Origin,‌‌Start‌‌&‌‌Reference‌‌Points‌‌and‌‌Reference‌‌Line‌(‌continuous‌‌line)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Proposed‌‌building‌‌hatch‌(‌Phase‌‌1‌‌–‌‌structure‌‌selected‌‌for‌‌preparing‌‌detailed‌‌WD‌‌set)‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Proposed‌‌building‌‌hatch‌(‌other‌‌phases‌‌considering‌‌Phase-1‌‌as‌‌Existing‌‌structure)‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Entry‌‌and‌‌Exit‌‌directions‌(‌indicate‌‌using‌‌triangle‌‌with‌‌grey‌‌solid‌‌hatch)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌drawing‌‌along‌‌with‌‌scale‌‌–‌S
‌ ETTING‌‌OUT‌‌PLAN‌(‌1:100‌‌/‌‌1:200)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Station‌‌Point,‌‌Origin‌‌Point,‌‌Start‌‌Point‌‌,‌‌Reference‌‌Points‌‌and‌‌Reference‌‌Line‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Building‌‌line‌‌and‌‌Building‌‌corner‌‌numbering‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Site‌‌boundary‌‌line,‌‌site‌‌margin‌‌line‌‌and‌‌Entry‌‌–‌‌Exit‌‌points‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Access‌‌Road‌‌and‌‌Access‌‌Road‌‌Width‌  ‌  ‌  ‌  ‌
6‌‌
   ‌ Phase‌‌1,‌‌Phase‌‌2,‌‌Phase‌‌3,‌‌…..‌‌etc.‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Existing‌‌Structure‌‌/‌‌Existing‌‌Tree‌‌(if‌‌any)‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

 ‌ Site‌‌Dimensions‌  ‌  ‌  ‌  ‌

1‌‌
   ‌ Site‌‌boundary‌‌dimensions‌(‌to‌‌be‌‌given‌‌outside‌‌of‌‌the‌‌site‌‌boundary)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Setback‌‌dimensions‌‌from‌‌the‌‌boundary‌‌line‌  ‌  ‌  ‌  ‌

 ‌ Establishing‌‌Dimensions‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Origin‌‌point‌‌to‌‌reference‌‌points‌‌on‌‌site‌‌boundary‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ All‌‌building‌‌side‌‌dimensions‌(‌overall‌‌/‌‌out‌‌to‌‌out‌‌dimensions)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ All‌‌building‌‌side‌‌dimensions‌(‌building‌‌offset‌‌dimensions)‌  ‌  ‌  ‌  ‌

 ‌ Check‌‌Dimensions‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Station‌‌point‌‌to‌‌reference‌‌points‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Site‌‌boundary‌‌to‌‌corner‌‌of‌‌building‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Diagonal‌‌dimensions‌(‌diagonally‌‌opposite‌‌corners‌‌of‌‌building‌‌footprint)‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ From‌‌existing‌‌structures‌(‌if‌‌any)‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ North‌‌arrow‌‌on‌‌all‌‌drawings‌‌showing‌‌plan‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Section‌‌Lines‌‌&‌‌Elevation‌‌Arrows‌‌with‌‌appropriate‌‌nomenclature‌‌&‌‌annotation‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Key‌‌plan‌‌of‌‌a‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌WD‌‌set.‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Hatch‌‌legend‌‌–‌‌proposed‌‌/‌‌existing‌‌structure,‌‌phases‌‌etc.‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale,‌‌and‌‌other‌‌related‌‌information.‌  ‌  ‌  ‌  ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDST.01
SHEET TITLE: SETTING OUT PLAN

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51
N
DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.51‌‌   ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ ed,‌‌28‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌W ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Checklist‌‌-‌‌Center-Line‌‌Plan‌B
‌ rief‌‌No.‌0‌ 2.03,‌‌02.04‌T‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Center-Line‌‌Plan:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Stability‌‌in‌‌any‌‌structure‌‌is‌‌achieved‌‌by‌‌transferring‌‌the‌‌different‌‌loads‌‌acting‌‌on‌‌structure‌‌to‌‌the‌‌ground,‌‌basic‌‌principle‌‌is‌‌to‌‌keep‌  ‌
center‌‌of‌‌gravity‌‌for‌‌any‌‌structure.‌‌With‌‌the‌‌exercise‌‌of‌‌center-line‌‌drawing,‌‌positions‌‌of‌‌members‌‌from‌‌structural‌‌systems‌‌can‌‌be‌  ‌
aligned‌‌and‌‌rationalised,‌‌which‌‌also‌‌helps‌‌during‌‌execution‌‌of‌‌any‌‌structure.‌‌    ‌

Procedure‌t‌o‌‌draw‌‌a‌‌center‌‌line‌‌plan‌‌–‌‌draw‌‌all‌s ‌ tructural‌‌members‌w ‌ ith‌‌appropriate‌‌nomenclature‌‌and‌‌numbering‌‌(‘C’‌‌for‌  ‌


column,‌‌‘W’‌‌for‌‌wall,‌‌‘SW’‌‌for‌‌shear‌‌wall,‌‌‘P’‌‌for‌‌post‌‌etc.)‌‌with‌‌appropriate‌‌footing‌‌(stepped,‌‌box,‌‌raft,‌‌pile‌‌etc.‌‌in‌‌dashed‌‌line),‌‌draw‌‌a ‌ ‌
center‌‌line‌‌at‌‌X‌‌and‌‌Y‌‌axes‌,‌‌give‌n ‌ umbering‌t‌o‌‌the‌‌center‌‌line,‌‌select‌‌a‌s‌ tart‌‌point‌a‌ t‌‌bottom‌‌left‌‌corner‌‌with‌‌(0,0)‌‌coordinates,‌‌give‌  ‌
c/c‌‌and‌‌running‌‌dimensions‌a ‌ s‌‌well‌‌as‌‌overall‌‌building‌‌dimensions.‌‌   ‌
1.‌S
‌ tructural‌‌members:‌‌load‌‌bearing‌‌walls,‌‌pillars,‌‌columns,‌‌posts‌‌etc.‌‌    ‌
2.‌C
‌ enter‌‌Line:‌a ‌ ‌‌line‌‌passing‌‌through‌‌center‌‌of‌‌the‌‌structural‌‌members‌‌on‌‌X‌‌as‌‌well‌‌as‌‌Y‌‌axes.‌‌    ‌
3.‌S
‌ tart‌‌Point:‌p‌ oint‌‌established‌‌on‌‌site‌‌to‌‌mark‌‌the‌‌(0,0)‌‌of‌‌XY‌‌coordinate‌‌system.‌‌    ‌
4.‌C
‌ /C‌‌dimension:‌d ‌ imension‌‌between‌‌2‌‌center‌‌lines‌‌    ‌
5.‌R
‌ unning‌‌dimension:‌d ‌ imension‌‌of‌‌a‌‌center‌‌line‌‌from‌‌start‌‌point‌‌on‌‌both‌‌the‌‌axes,‌‌accompanied‌‌with‌‌numbering.‌‌  
6.‌C
‌ heck‌‌dimensions:‌d ‌ iagonal‌‌dimensions‌‌between‌‌random‌‌columns‌‌from‌‌center‌‌of‌‌column.‌‌    ‌
7.‌L
‌ abelling:‌‌each‌‌running‌‌dimension‌‌in‌‌X‌‌and‌‌Y‌‌axes‌‌direction‌‌is‌‌labelled‌‌with‌‌numbers‌‌or‌‌alphabets.‌‌    ‌
It‌‌is‌‌preferable‌‌to‌‌locate‌‌start‌‌point‌‌on‌‌the‌‌left‌‌bottom‌‌corner‌‌of‌‌the‌‌structure,‌‌so‌‌as‌‌to‌‌position‌‌the‌‌structure‌‌in‌‌1‌st‌quadrant‌

‌of‌‌XY‌  ‌
coordinate‌‌system.‌‌Create‌‌cad‌‌blocks‌‌for‌‌structural‌‌members‌‌and‌‌convert‌‌entire‌‌arrangement‌‌of‌‌the‌‌structural‌‌system‌‌in‌‌one‌‌cad‌‌block,‌  ‌
so‌‌that‌‌it‌‌can‌‌be‌‌easily‌‌repeated‌‌in‌‌floor‌‌plans.‌‌
   ‌

Check-List:‌  ‌
Project‌‌Name‌‌–‌‌WORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌CENTRE‌‌LINE‌‌PLAN‌‌) ‌ ‌ Drawing‌  ‌ WDST‌‌-‌‌02‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ All‌‌structural‌‌members‌(‌to‌‌be‌‌indicated‌‌with‌‌sectional‌‌line‌‌and‌‌material‌‌hatch)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ All‌‌foundations‌(‌in‌‌dashed‌‌lines)‌‌–‌‌according‌‌to‌‌structural‌‌system‌‌adopted‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Center-lines‌‌of‌‌all‌‌structural‌‌members‌‌on‌‌both‌‌axes‌(‌dash‌‌-‌‌dot‌‌line‌‌in‌‌red‌‌colour)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Start‌‌Point‌(‌on‌‌left‌‌bottom‌‌corner‌‌of‌‌a‌‌structure‌‌–‌‌indicate‌‌with‌‌point‌‌and‌‌circle)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Building‌‌line‌(‌in‌‌continuous‌‌line,‌‌use‌‌non-structural‌‌line‌‌weight)‌‌–‌‌in‌‌some‌‌conditions‌‌plinth‌‌profile‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Material‌‌hatch‌‌for‌‌every‌‌structural‌‌member‌(‌as‌‌indicated‌‌in‌‌material‌‌legend)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Position‌‌of‌‌center‌‌of‌‌an‌‌Arc‌(‌if‌‌applicable)‌  ‌  ‌ NA‌  ‌  ‌

8‌‌
   ‌ Section‌‌through‌‌foundation‌‌indicating‌‌type,‌‌material‌‌and‌‌offsets‌‌of‌‌footing‌‌(scale‌‌-‌‌1:10)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌the‌‌drawing‌‌along‌‌with‌‌scale‌‌–‌C
‌ ENTER-LINE‌‌PLAN‌(‌1:50)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Start‌‌Point‌‌(0,0)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Building‌‌Line‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Structural‌‌members‌‌numbering‌(‌as‌‌applicable‌‌-‌‌C1,C2,C3,…W1,W2,W3…‌‌etc.)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Center‌‌lines‌‌labelling‌‌with‌‌structural‌‌member‌‌numbering‌‌for‌‌running‌‌dimensions‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Center‌‌of‌‌an‌‌Arc‌(‌if‌‌applicable)‌  ‌  ‌ NA‌  ‌  ‌
C.‌‌Dimensions‌  ‌

 ‌ Building‌‌Dimensions‌  ‌  ‌  ‌  ‌

1‌‌
   ‌ Center‌‌to‌‌Center‌‌Dimensions‌‌on‌‌both‌‌axes‌‌for‌‌all‌‌center-lines.‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ First‌‌center-line‌‌to‌‌End‌‌center-line‌‌dimension‌‌on‌‌both‌‌axes‌(‌in‌‌reference‌‌to‌‌start‌‌point)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Running‌‌Dimensions‌‌–‌s‌ tructural‌‌member‌‌numbering,‌‌distance‌‌from‌‌start‌‌point‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Radial‌‌Dimension‌(‌if‌‌applicable)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Running‌‌dimension‌‌of‌‌center‌‌point‌‌of‌‌an‌‌arc‌(‌if‌‌applicable)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Running‌‌dimension‌‌of‌‌structural‌‌member‌‌in‌‌different‌‌angle‌(‌if‌‌applicable)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Column‌‌tilt‌‌detail‌(‌if‌‌applicable)‌  ‌  ‌  ‌  ‌

 ‌ Reference‌‌/‌‌Check‌‌Dimensions‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Overall‌‌building‌‌dimension‌(‌out‌‌to‌‌out‌‌dimension‌‌in‌‌reference‌‌to‌‌building‌‌line)‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Diagonal‌‌check‌‌dimensions‌(‌column‌‌center‌‌to‌‌column‌‌center‌‌/‌‌wall‌‌junction‌‌center‌‌to‌‌wall‌‌junction‌‌   ‌  ‌  ‌
center)‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ North‌‌arrow‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Section‌‌lines‌‌&‌‌Elevation‌‌Arrows‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Center‌‌lines‌‌labelling‌‌with‌‌structural‌‌member‌‌numbering‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Hatch‌‌legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌‌etc.‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Structural‌‌System‌‌Schedule‌(‌column,‌‌beam,‌‌pier‌‌etc.‌‌–‌‌numbering‌‌and‌‌size)‌  ‌  ‌ NA‌   ‌

4‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDST.02
SHEET TITLE: CENTRE LINE PLAN

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51
N
DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌C
‌ heck-List‌‌-‌‌Building‌‌ 
Floor‌‌Plans‌B
‌ rief‌‌No.‌0‌ 3.02‌T
‌ eam:‌A
‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D
‌ D‌‌   ‌

Check-List‌‌Floor‌‌Level‌‌Plans:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–‌‌WORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌GROUND‌‌FLOOR‌‌PLAN‌‌) ‌ ‌ Drawing‌  ‌ WDPL‌‌-‌‌01‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Plan‌‌at‌‌given‌‌floor‌‌level,‌‌as‌‌seen‌‌at‌‌sill‌‌level‌(‌along‌‌with‌‌proper‌‌annotations‌‌&‌‌Line‌‌weights)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Structural‌‌lines‌(‌Plinth‌‌PCC,‌‌Slab,‌‌Walls,‌‌Beams,‌‌Bands‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌structural‌‌section‌‌line)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Finish‌‌lines‌(‌Plaster,‌‌flooring,‌‌skirting‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ All‌‌External‌‌and‌‌Internal‌‌Walls‌‌/‌‌Partitions‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Structural‌‌System‌(‌column‌‌–‌‌structural‌‌section‌‌lines‌‌|‌‌beams‌‌above‌‌–‌‌dashed‌‌lines)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Types‌‌and‌‌Position‌‌of‌‌Openings‌(‌Door‌‌swing,‌‌Window,‌‌Ventilator,‌‌Arch,‌‌Sky‌‌light‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Staircase‌(‌with‌‌continuation‌‌line‌‌at‌‌sill‌‌level,‌‌railing,‌‌riser‌‌lines,‌‌opening‌‌if‌‌any,‌‌up-down‌‌arrow)‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ In-built‌‌Furniture‌‌/‌‌Planter‌‌Box‌‌/‌‌Fenestration‌‌Components‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

9‌‌
   ‌ Level‌‌change‌‌–‌‌indication‌‌of‌‌steps‌‌/‌‌ramps‌‌etc.‌(‌if‌‌any)‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Material‌‌hatch‌‌for‌‌walls,‌‌partitions,‌‌structural‌‌members‌‌(as‌‌indicated‌‌in‌‌material‌‌legend)‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Railing‌‌/‌‌Parapet‌‌in‌‌elevation‌(‌for‌‌staircase,‌‌passage,‌‌terrace,‌‌balcony‌‌etc.)‌  ‌  ‌  ‌  ‌

12‌‌
   ‌ Projections‌‌above‌‌as‌‌per‌‌upper‌‌floor‌‌plans‌‌-‌‌framing,‌‌cutout‌‌etc.‌(‌indicated‌‌in‌‌dashed‌‌   ‌  ‌  ‌
line)‌  ‌

13‌‌
   ‌ Projections‌‌below‌‌as‌‌per‌‌lower‌‌floor‌‌plans‌(‌indicated‌‌in‌‌continuous‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

14‌‌
   ‌ Cut‌‌outs,‌‌double‌‌height‌‌spaces‌(‌marked‌‌with‌‌cross‌‌in‌‌dashed‌‌lines)‌  ‌  ‌  ‌  ‌

15‌‌
   ‌ Tile‌‌drop‌‌indication‌(‌toilet,‌‌verandah,‌‌balcony,‌‌terrace,‌‌sit-out,‌‌utility‌‌area‌‌etc.‌‌indicated‌‌in‌‌elevation‌‌   ‌  ‌  ‌
line)‌  ‌

16‌‌
   ‌ Toilet‌‌–‌‌sunk‌‌hatch‌(‌grey‌‌colour,‌‌45‌0‌hatch)‌

 ‌  ‌  ‌  ‌

17‌‌
   ‌ Toilet‌‌–‌‌position‌‌of‌‌sanitary‌‌appliances‌  ‌  ‌  ‌  ‌

18‌‌
   ‌ Slope‌‌arrows‌‌with‌‌gradient‌(‌for‌‌verandah,‌‌sit-out,‌‌balcony,‌‌terrace,‌‌open‌‌to‌‌sky‌‌spaces‌‌etc.)‌  ‌  ‌  ‌  ‌

19‌‌
   ‌ Plinth‌‌steps,‌‌verandah,‌‌sit-out‌‌areas‌‌etc.‌(‌in‌‌case‌‌of‌‌Ground‌‌Floor‌‌Plan)‌  ‌  ‌  ‌  ‌

20‌‌
   ‌ Plumbing‌‌pipes,‌‌Rain‌‌water‌‌down‌‌take‌‌pipes‌(‌on‌‌all‌‌floors,‌‌in‌‌ducts)‌  ‌  ‌ NA‌   ‌

21‌‌
   ‌ Finish‌‌Floor‌‌Level‌‌symbol‌‌in‌‌each‌‌and‌‌every‌‌built‌‌space‌  ‌  ‌  ‌  ‌

22‌‌
   ‌ Provision‌‌of‌‌floor‌‌gutter‌‌and‌‌grating‌‌in‌‌case‌‌of‌‌basement‌‌/‌‌industrial‌‌building‌  ‌  ‌ NA‌   ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Plan‌‌along‌‌with‌‌its‌‌level‌‌from‌‌datum‌‌in‌‌mm‌‌and‌‌scale‌‌of‌‌drawing‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Room‌‌Text‌‌-‌‌Room‌‌/‌‌Space‌‌name‌  ‌  ‌  ‌  ‌
3‌‌
   ‌ Room‌‌Text‌‌-‌‌Room‌‌size‌(‌internal‌‌clear‌‌dimension‌‌X‌‌x‌‌Y)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Room‌‌Text‌‌-‌‌Finish‌‌Level‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Opening‌‌Numbering‌(‌D1,‌‌W1,‌‌V1,‌‌O1,‌‌FD1,‌‌SLD1,‌‌SFD1‌‌etc.‌‌to‌‌be‌‌given‌‌outside‌‌of‌‌the‌‌opening)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ UP‌‌&‌‌DOWN‌‌arrows‌‌for‌‌vertical‌‌circulation‌‌(staircases,‌‌steps,‌‌ramps‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Nomenclature‌‌-‌‌Slab‌‌cutouts,‌‌Space‌‌/‌‌Room‌‌above‌‌or‌‌below,‌‌Ducts,‌‌Shafts‌‌etc.‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Slope‌‌Gradient‌‌for‌‌Ramp‌(‌1:10,‌‌1:12‌‌etc.)‌f‌ or‌‌Terrace‌(‌1:100,‌‌1:200‌‌etc.)‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌/‌‌numbering‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Hexagon‌‌–‌‌for‌‌material‌‌finishes‌  ‌  ‌  ‌  ‌

12‌‌
   ‌ Specifications‌‌for‌‌construction‌‌materials‌‌and‌‌building‌‌components.‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Internal‌‌clear‌‌dimensions‌‌of‌‌a‌‌room‌‌/‌‌space‌(‌to‌‌be‌‌given‌‌in‌‌single‌‌line‌‌across‌‌all‌‌the‌‌rooms)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Positions‌‌of‌‌the‌‌openings‌‌from‌‌nearest‌‌structural‌‌member‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ External‌‌building‌‌profile‌‌dimensions‌‌/‌‌offset‌‌dimension‌(‌to‌‌be‌‌given‌‌outside‌‌the‌‌building)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ External‌‌overall‌‌dimensions‌(‌to‌‌be‌‌given‌‌beyond‌‌the‌‌profile‌‌dimensions)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Cutout,‌‌duct‌‌dimensions‌(‌size‌‌&‌‌position‌‌from‌‌nearest‌‌structural‌‌member)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projection‌‌dimensions‌(‌weather‌‌shed,‌‌balcony‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Arc‌‌length,‌‌radius‌‌for‌‌curved‌‌surface‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ North‌‌arrow‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Section‌‌Lines‌‌&‌‌Elevation‌‌Arrows‌(‌with‌‌appropriate‌‌drawing‌‌number‌‌for‌‌cross‌‌referencing)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌(‌door,‌‌window,‌‌kitchen‌‌platform‌‌etc.)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Material‌‌finish‌‌hexagon‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌  ‌  ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌   ‌ ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Schedule‌‌of‌‌Material‌‌Finishes‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Schedule‌‌of‌‌Column‌‌and‌‌Beams‌‌(Sizes‌‌and‌‌Numbering)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌  ‌  ‌
Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDPL.01
SHEET TITLE: GROUND FLOOR PLAN

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51
N
DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌C
‌ heck-List‌‌-‌‌Building‌‌ 
Floor‌‌Plans‌B
‌ rief‌‌No.‌0‌ 3.02‌T
‌ eam:‌A
‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D
‌ D‌‌   ‌

Check-List‌‌Floor‌‌Level‌‌Plans:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–‌‌WORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌FIRST‌‌FLOOR‌‌PLAN‌‌) ‌ ‌ Drawing‌  ‌ WDPL‌‌-‌‌01‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Plan‌‌at‌‌given‌‌floor‌‌level,‌‌as‌‌seen‌‌at‌‌sill‌‌level‌(‌along‌‌with‌‌proper‌‌annotations‌‌&‌‌Line‌‌weights)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Structural‌‌lines‌(‌Plinth‌‌PCC,‌‌Slab,‌‌Walls,‌‌Beams,‌‌Bands‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌structural‌‌section‌‌line)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Finish‌‌lines‌(‌Plaster,‌‌flooring,‌‌skirting‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ All‌‌External‌‌and‌‌Internal‌‌Walls‌‌/‌‌Partitions‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Structural‌‌System‌(‌column‌‌–‌‌structural‌‌section‌‌lines‌‌|‌‌beams‌‌above‌‌–‌‌dashed‌‌lines)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Types‌‌and‌‌Position‌‌of‌‌Openings‌(‌Door‌‌swing,‌‌Window,‌‌Ventilator,‌‌Arch,‌‌Sky‌‌light‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Staircase‌(‌with‌‌continuation‌‌line‌‌at‌‌sill‌‌level,‌‌railing,‌‌riser‌‌lines,‌‌opening‌‌if‌‌any,‌‌up-down‌‌arrow)‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ In-built‌‌Furniture‌‌/‌‌Planter‌‌Box‌‌/‌‌Fenestration‌‌Components‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

9‌‌
   ‌ Level‌‌change‌‌–‌‌indication‌‌of‌‌steps‌‌/‌‌ramps‌‌etc.‌(‌if‌‌any)‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Material‌‌hatch‌‌for‌‌walls,‌‌partitions,‌‌structural‌‌members‌‌(as‌‌indicated‌‌in‌‌material‌‌legend)‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Railing‌‌/‌‌Parapet‌‌in‌‌elevation‌(‌for‌‌staircase,‌‌passage,‌‌terrace,‌‌balcony‌‌etc.)‌  ‌  ‌  ‌  ‌

12‌‌
   ‌ Projections‌‌above‌‌as‌‌per‌‌upper‌‌floor‌‌plans‌‌-‌‌framing,‌‌cutout‌‌etc.‌(‌indicated‌‌in‌‌dashed‌‌   ‌  ‌  ‌
line)‌  ‌

13‌‌
   ‌ Projections‌‌below‌‌as‌‌per‌‌lower‌‌floor‌‌plans‌(‌indicated‌‌in‌‌continuous‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

14‌‌
   ‌ Cut‌‌outs,‌‌double‌‌height‌‌spaces‌(‌marked‌‌with‌‌cross‌‌in‌‌dashed‌‌lines)‌  ‌  ‌  ‌  ‌

15‌‌
   ‌ Tile‌‌drop‌‌indication‌(‌toilet,‌‌verandah,‌‌balcony,‌‌terrace,‌‌sit-out,‌‌utility‌‌area‌‌etc.‌‌indicated‌‌in‌‌elevation‌‌   ‌  ‌  ‌
line)‌  ‌

16‌‌
   ‌ Toilet‌‌–‌‌sunk‌‌hatch‌(‌grey‌‌colour,‌‌45‌0‌hatch)‌

 ‌  ‌  ‌  ‌

17‌‌
   ‌ Toilet‌‌–‌‌position‌‌of‌‌sanitary‌‌appliances‌  ‌  ‌  ‌  ‌

18‌‌
   ‌ Slope‌‌arrows‌‌with‌‌gradient‌(‌for‌‌verandah,‌‌sit-out,‌‌balcony,‌‌terrace,‌‌open‌‌to‌‌sky‌‌spaces‌‌etc.)‌  ‌  ‌  ‌  ‌

19‌‌
   ‌ Plinth‌‌steps,‌‌verandah,‌‌sit-out‌‌areas‌‌etc.‌(‌in‌‌case‌‌of‌‌Ground‌‌Floor‌‌Plan)‌  ‌  ‌  ‌  ‌

20‌‌
   ‌ Plumbing‌‌pipes,‌‌Rain‌‌water‌‌down‌‌take‌‌pipes‌(‌on‌‌all‌‌floors,‌‌in‌‌ducts)‌  ‌  ‌ NA‌   ‌

21‌‌
   ‌ Finish‌‌Floor‌‌Level‌‌symbol‌‌in‌‌each‌‌and‌‌every‌‌built‌‌space‌  ‌  ‌  ‌  ‌

22‌‌
   ‌ Provision‌‌of‌‌floor‌‌gutter‌‌and‌‌grating‌‌in‌‌case‌‌of‌‌basement‌‌/‌‌industrial‌‌building‌  ‌  ‌ NA‌   ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Plan‌‌along‌‌with‌‌its‌‌level‌‌from‌‌datum‌‌in‌‌mm‌‌and‌‌scale‌‌of‌‌drawing‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Room‌‌Text‌‌-‌‌Room‌‌/‌‌Space‌‌name‌  ‌  ‌  ‌  ‌
3‌‌
   ‌ Room‌‌Text‌‌-‌‌Room‌‌size‌(‌internal‌‌clear‌‌dimension‌‌X‌‌x‌‌Y)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Room‌‌Text‌‌-‌‌Finish‌‌Level‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Opening‌‌Numbering‌(‌D1,‌‌W1,‌‌V1,‌‌O1,‌‌FD1,‌‌SLD1,‌‌SFD1‌‌etc.‌‌to‌‌be‌‌given‌‌outside‌‌of‌‌the‌‌opening)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ UP‌‌&‌‌DOWN‌‌arrows‌‌for‌‌vertical‌‌circulation‌‌(staircases,‌‌steps,‌‌ramps‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Nomenclature‌‌-‌‌Slab‌‌cutouts,‌‌Space‌‌/‌‌Room‌‌above‌‌or‌‌below,‌‌Ducts,‌‌Shafts‌‌etc.‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Slope‌‌Gradient‌‌for‌‌Ramp‌(‌1:10,‌‌1:12‌‌etc.)‌f‌ or‌‌Terrace‌(‌1:100,‌‌1:200‌‌etc.)‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌/‌‌numbering‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Hexagon‌‌–‌‌for‌‌material‌‌finishes‌  ‌  ‌  ‌  ‌

12‌‌
   ‌ Specifications‌‌for‌‌construction‌‌materials‌‌and‌‌building‌‌components.‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Internal‌‌clear‌‌dimensions‌‌of‌‌a‌‌room‌‌/‌‌space‌(‌to‌‌be‌‌given‌‌in‌‌single‌‌line‌‌across‌‌all‌‌the‌‌rooms)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Positions‌‌of‌‌the‌‌openings‌‌from‌‌nearest‌‌structural‌‌member‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ External‌‌building‌‌profile‌‌dimensions‌‌/‌‌offset‌‌dimension‌(‌to‌‌be‌‌given‌‌outside‌‌the‌‌building)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ External‌‌overall‌‌dimensions‌(‌to‌‌be‌‌given‌‌beyond‌‌the‌‌profile‌‌dimensions)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Cutout,‌‌duct‌‌dimensions‌(‌size‌‌&‌‌position‌‌from‌‌nearest‌‌structural‌‌member)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projection‌‌dimensions‌(‌weather‌‌shed,‌‌balcony‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Arc‌‌length,‌‌radius‌‌for‌‌curved‌‌surface‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ North‌‌arrow‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Section‌‌Lines‌‌&‌‌Elevation‌‌Arrows‌(‌with‌‌appropriate‌‌drawing‌‌number‌‌for‌‌cross‌‌referencing)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌(‌door,‌‌window,‌‌kitchen‌‌platform‌‌etc.)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Material‌‌finish‌‌hexagon‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌  ‌  ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌   ‌ ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Schedule‌‌of‌‌Material‌‌Finishes‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Schedule‌‌of‌‌Column‌‌and‌‌Beams‌‌(Sizes‌‌and‌‌Numbering)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌  ‌  ‌
Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDPL.02
SHEET TITLE: FIRST FLOOR PLAN

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51
N
DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Checklist‌‌-‌‌Building‌‌Roof‌‌Plan‌B
‌ rief‌‌No.‌0‌ 3.03,‌‌03.04‌T‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Roof‌‌Plan:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Separate‌‌drawing‌‌of‌‌roof‌‌plan‌‌is‌‌important,‌‌it‌‌shows‌‌roof‌‌profile‌‌along‌‌with‌‌position‌‌and‌‌capacity‌‌of‌‌overhead‌‌water‌‌tank‌‌with‌ ‌access‌‌  
staircase‌‌or‌‌ladder,‌‌skylight‌‌and‌‌pergola‌‌(if‌‌provided).‌‌This‌‌plan‌‌also‌‌represents‌‌water‌‌proofing‌‌slope‌‌directions,‌‌ridge‌‌lines,‌ ‌slope‌‌  
gradient,‌‌parapet‌‌/‌‌railing.‌‌With‌‌help‌‌of‌‌roof‌‌plan‌‌it‌‌is‌‌easy‌‌to‌‌establish‌‌a‌‌relation‌‌between‌‌overhead‌‌water‌‌tank‌‌and‌‌a‌‌plumbing‌  ‌
duct(s).‌‌Indication‌‌of‌‌other‌‌components‌‌like‌‌PV‌‌cells,‌‌solar‌‌water‌‌heaters‌‌etc.‌‌are‌‌integral‌‌components‌‌of‌‌the‌‌roof‌‌plan.‌‌There‌‌are‌‌no‌  ‌
walls‌‌in‌‌section‌‌and‌‌wall‌‌opening‌‌indication‌‌and‌‌therefore‌‌no‌‌opening‌‌schedule‌‌and‌‌no‌‌material‌‌indication‌‌in‌‌the‌‌roof‌‌plan‌‌is‌‌required.‌  ‌
All‌‌the‌‌projections‌‌below‌‌like‌‌weather‌‌sheds,‌‌floor‌‌terraces,‌‌balconies‌‌etc.‌‌are‌‌shown‌‌with‌‌lighter‌‌intensity‌‌elevation‌‌lines.‌‌
   ‌

Check-List‌‌Roof‌‌Plan:‌‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–‌W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌TERRACE‌‌FLOOR‌‌PLAN‌‌) ‌ ‌ Drawing‌  ‌ WDPL‌‌-‌‌03‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Roof‌‌profile‌‌along‌‌with‌‌parapet‌‌/‌‌railing‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Building‌‌Profile‌‌in‌‌dashed‌‌line‌(‌in‌‌case‌‌of‌‌projected‌‌roofs)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Structural‌‌Framing‌(‌column‌‌–‌‌structural‌‌section‌‌lines,‌‌beams‌‌below‌‌–‌‌dashed‌‌lines)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ In-built‌‌Furniture‌‌/‌‌Planter‌‌Box‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Level‌‌change‌‌–‌‌indication‌‌of‌‌steps‌‌/‌‌ramp‌(‌if‌‌any)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Cutouts,‌‌Courtyards,‌‌Skylights,‌‌Pergolas‌‌etc.‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Position‌‌of‌‌Staircase‌‌Tower‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Projections‌‌of‌‌All‌‌Weather‌‌Shed‌‌Protections‌‌on‌‌Lower‌‌Floor‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Slope‌‌arrows‌‌and‌‌Ridge‌‌lines‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Provision‌‌of‌‌Gutter‌(‌in‌‌case‌‌of‌‌sloping‌‌roof)‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Any‌‌other‌‌structure‌‌on‌‌terrace‌(‌gazebos,‌‌pavilions,‌‌pergolas,‌‌sky‌‌light‌‌etc.‌‌if‌‌any)‌  ‌  ‌ NA‌   ‌

12‌‌
   ‌ Stop‌‌columns‌(‌in‌‌dashed‌‌lines)‌   ‌ NA‌   ‌

13‌‌
   ‌ Position‌‌of‌‌Overhead‌‌Water‌‌Tank‌  ‌  ‌ NA‌   ‌

14‌‌
   ‌ Position‌‌of‌‌all‌‌service‌‌ducts‌‌and‌‌indication‌‌of‌‌all‌‌services‌‌pipes‌  ‌  ‌ NA‌   ‌

15‌‌
   ‌ Rain‌‌water‌‌down‌‌take‌‌pipes‌(‌on‌‌all‌‌floors)‌  ‌  ‌ NA‌   ‌

16‌‌
   ‌ Position‌‌of‌‌solar‌‌panels‌‌/‌‌other‌‌services‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Plan‌‌along‌‌with‌‌its‌‌level‌‌from‌‌datum‌‌in‌‌mm‌‌and‌‌scale‌‌of‌‌drawing‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Terrace‌‌with‌‌size‌(‌X‌‌x‌‌Y)‌a
‌ nd‌‌Finish‌‌Level‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Slopping‌‌Roof‌‌with‌‌Slope‌‌Direction‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Slab‌‌cutouts,‌‌Space‌‌/‌‌Room‌‌below,‌‌Service‌‌Ducts,‌‌Shafts‌‌etc.‌  ‌  ‌  ‌  ‌
5‌‌
   ‌ Courtyard,‌‌Skylight,‌‌Pergola,‌‌Gazebo,‌‌Pavilion‌‌etc.‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Ridge‌‌line,‌‌Slope‌‌gradient‌‌for‌‌terrace‌‌area‌(‌1:100,‌‌1:150,‌‌1:200‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌and‌‌numbering‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Services‌‌pipes‌‌nomenclature‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Stop‌‌column‌‌numbers‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Specifications‌‌for‌‌construction‌‌materials‌‌and‌‌building‌‌components.‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Clear‌‌dimensions‌‌within‌‌parapet‌‌wall‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ External‌‌building‌‌profile‌‌dimensions‌‌/‌‌offset‌‌dimension‌(‌to‌‌be‌‌given‌‌outside‌‌the‌‌building)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ External‌‌overall‌‌dimensions‌(‌to‌‌be‌‌given‌‌beyond‌‌the‌‌profile‌‌dimensions)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Cutout,‌‌duct‌‌dimensions‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Projection‌‌dimensions‌(‌weather‌‌shed,‌‌balcony‌‌etc.)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Arc‌‌length,‌‌radius‌‌for‌‌curved‌‌surface‌(‌if‌‌any)‌  ‌  ‌ NA‌   ‌

7‌‌
   ‌ Staircase‌‌tower‌‌and‌‌Over‌‌Head‌‌Water‌‌Tank‌(‌Size‌‌and‌‌Position)‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Any‌‌other‌‌structure‌(‌like‌‌Skylight,‌‌Pergola,‌‌Gazebo,‌‌Pavilion‌‌etc.)‌‌(internal‌‌dimensions‌‌&‌‌Position)‌  ‌  ‌ NA‌   ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ North‌‌arrow‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Section‌‌lines‌‌&‌‌Elevation‌‌Arrows‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Grid‌‌lines‌‌&‌‌labelling‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌(‌pergola,‌‌skylight‌‌etc.)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌  ‌  ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Schedule‌‌of‌‌Material‌‌Finishes‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Schedule‌‌of‌‌Column‌‌and‌‌Beams‌‌(Sizes‌‌and‌‌Numbering)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌  ‌  ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDPL.03
SHEET TITLE: TERRACE FLOOR PLAN

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.
4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51
N
DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll No. 51
Vivekanand Institute of Technology’s
Padmabhushan Dr. Vasantdada Patil College of Architecture
274/2, 275/2, 282, Aditya Nisarg At Pirangut, Tal. Mulshi, Dist. Pune 412115 | tel: 020-20291299, 20291308, 60129033, 65349033 | email: pvpcoapune@gmail.com,vitcoapune@gmail.com | web: www.pvpcoapune.com | blog: www.pvpcoapuneblog.blogspot.com
Academic Year: 2020 – 2021 Semester: V (2019 pattern) Class: Third Year B. Arch. Day & Date: Sat, 17th Jul 2021 Subject: Working Drawing I ( WD-I ) Topic: Check-List - Building
Sections Brief No. 04.02 Team: Ar. Devendra Deshpande, Ar. Vaibhav Kulkarni, Ar. Ashish Srivastava, Ar. Nikita Khade Prepared by: DD

Check-List Building Sections: (Scale - 1:50)


Project Name – WORKING DRAWING- I (SECTION ) Drawing WDSC - 01
Number

No. Description Drawn by Checked Approved


by by

Name KARTIK SHIVAM

A. Drawing Contents

1 Section drawn at section lines marked on all level plans

2 Structural system and Structural framing Components

3 Substructure & Plinth (foundation type, earth filling, soling, PCC bed, DPC, plinth protection etc.)

4 Elevation of spaces beyond the section plane (wrt plans)

5 Structural lines (Plinth PCC, Slab, Walls, Beams, Bands etc. to be indicated in structural section line)

6 Finish lines (Plaster, flooring, skirting etc. to be indicated in elevation line)

7 Existing ground levels (dashed line) and Proposed ground levels (thick section line)

8 Material indication (as indicated in material legend)

9 Section through staircase (all steps connecting 2 levels, type of steps, landing – mid landing,
window)

10 Section through toilet (sunk, ventilators, partition walls, ledge walls, height of dado)

11 Opening & its components (sill, lintel, frames, shutter, weather protection etc.)

12 Wall, Floor, Ceiling finish lines (dado and flooring tile, plaster etc.)

13 Indication of water proofing at terrace level

14 Railing, Parapets (balcony, terrace, staircase, cutouts, OHWT)

15 Grid lines (wrt plans)

16 Indication of level lines on section – Ground, Plinth, Floor, OHWT etc. (dashed line)

B. Nomenclature, Labeling and Text

1 Title of Section with scale (coordinated with section lines on plans)

2 Room / Space name (coordinated with plans)

3 Slab sunk and its depth (for toilet, terrace, balcony etc.)

4 Opening numbers (coordinated with plans)

5 Riser numbers for all steps & staircases (coordinated with plans)

6 Ducts / Shafts labeling (coordinated with plans) NA

7 Grid lines labeling and numbering (coordinated with plans)

8 All finished levels (GL, formation lvl, all FFL, mid landing & mezzanine lvl)

9 Material / Building component specification NA


10 Cross referencing of details with drawing numbers (openings, toilet, staircase, railing etc.)

C. Dimensions

1 Top of FFL to Top of FFL of all floors (to be indicated in a single line for all levels)

2 Top of FFL to Top of FFL of all mid landing levels (in case of a section through staircase)

3 Ground Formation Level to Terrace Top Level

4 Ground Formation Level to Staircase Tower Cap Top Level

5 Ground Formation Level to OHWT Top Level

6 Sill and Lintel height from FFL NA

7 Railing and Parapet height from FFL

8 Dado / Cladding heights from FFL NA

9 Projections of Roof, Weather shed etc.

D. Reference Information, Annotations and Symbols

1 Grid lines & labelling

2 Cross referencing of details (door, window, kitchen platform etc.)

3 Building Skin Section callout box (mention Skin Section)

4 Key Plan of campus indicating selected structure for preparing the WD set

5 Specification for building elements / components. NA

E. Schedules, Notes, Legends and Nameplate

1 Copy right note, Construction Notes (Standard and Drawing specific)

2 Legend – material hatch, symbols used, specific annotations

3 Updated nameplate with project name, date, scale etc.

4 Schedule of Openings

5 Schedule of Material Finishes

6 Schedule of Column and Beams (Sizes and Numbering)

7 Mention all tread & riser size for steps.

Sign

Minimum 2 numbers of sections are required

1. Section passing through toilet

2. Section passing through staircase

In addition to above mentioned above 2 sections, section of critical part of the building must be drawn – E.g., to check available
headroom under staircase / section through double height spaces etc.
DRWG NO: WDSC.01
SHEET TITLE: SECTION AA

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll No. 51
Vivekanand Institute of Technology’s
Padmabhushan Dr. Vasantdada Patil College of Architecture
274/2, 275/2, 282, Aditya Nisarg At Pirangut, Tal. Mulshi, Dist. Pune 412115 | tel: 020-20291299, 20291308, 60129033, 65349033 | email: pvpcoapune@gmail.com,vitcoapune@gmail.com | web: www.pvpcoapune.com | blog: www.pvpcoapuneblog.blogspot.com
Academic Year: 2020 – 2021 Semester: V (2019 pattern) Class: Third Year B. Arch. Day & Date: Sat, 17th Jul 2021 Subject: Working Drawing I ( WD-I ) Topic: Check-List - Building
Sections Brief No. 04.02 Team: Ar. Devendra Deshpande, Ar. Vaibhav Kulkarni, Ar. Ashish Srivastava, Ar. Nikita Khade Prepared by: DD

Check-List Building Sections: (Scale - 1:50)


Project Name – WORKING DRAWING- I (SECTION ) Drawing WDSC - 02
Number

No. Description Drawn by Checked Approved


by by

Name KARTIK SHIVAM

A. Drawing Contents

1 Section drawn at section lines marked on all level plans

2 Structural system and Structural framing Components

3 Substructure & Plinth (foundation type, earth filling, soling, PCC bed, DPC, plinth protection etc.)

4 Elevation of spaces beyond the section plane (wrt plans)

5 Structural lines (Plinth PCC, Slab, Walls, Beams, Bands etc. to be indicated in structural section line)

6 Finish lines (Plaster, flooring, skirting etc. to be indicated in elevation line)

7 Existing ground levels (dashed line) and Proposed ground levels (thick section line)

8 Material indication (as indicated in material legend)

9 Section through staircase (all steps connecting 2 levels, type of steps, landing – mid landing,
window)

10 Section through toilet (sunk, ventilators, partition walls, ledge walls, height of dado)

11 Opening & its components (sill, lintel, frames, shutter, weather protection etc.)

12 Wall, Floor, Ceiling finish lines (dado and flooring tile, plaster etc.)

13 Indication of water proofing at terrace level

14 Railing, Parapets (balcony, terrace, staircase, cutouts, OHWT)

15 Grid lines (wrt plans)

16 Indication of level lines on section – Ground, Plinth, Floor, OHWT etc. (dashed line)

B. Nomenclature, Labeling and Text

1 Title of Section with scale (coordinated with section lines on plans)

2 Room / Space name (coordinated with plans)

3 Slab sunk and its depth (for toilet, terrace, balcony etc.)

4 Opening numbers (coordinated with plans)

5 Riser numbers for all steps & staircases (coordinated with plans)

6 Ducts / Shafts labeling (coordinated with plans) NA

7 Grid lines labeling and numbering (coordinated with plans)

8 All finished levels (GL, formation lvl, all FFL, mid landing & mezzanine lvl)

9 Material / Building component specification NA


10 Cross referencing of details with drawing numbers (openings, toilet, staircase, railing etc.)

C. Dimensions

1 Top of FFL to Top of FFL of all floors (to be indicated in a single line for all levels)

2 Top of FFL to Top of FFL of all mid landing levels (in case of a section through staircase)

3 Ground Formation Level to Terrace Top Level

4 Ground Formation Level to Staircase Tower Cap Top Level

5 Ground Formation Level to OHWT Top Level

6 Sill and Lintel height from FFL NA

7 Railing and Parapet height from FFL

8 Dado / Cladding heights from FFL NA

9 Projections of Roof, Weather shed etc.

D. Reference Information, Annotations and Symbols

1 Grid lines & labelling

2 Cross referencing of details (door, window, kitchen platform etc.)

3 Building Skin Section callout box (mention Skin Section)

4 Key Plan of campus indicating selected structure for preparing the WD set

5 Specification for building elements / components. NA

E. Schedules, Notes, Legends and Nameplate

1 Copy right note, Construction Notes (Standard and Drawing specific)

2 Legend – material hatch, symbols used, specific annotations

3 Updated nameplate with project name, date, scale etc.

4 Schedule of Openings

5 Schedule of Material Finishes

6 Schedule of Column and Beams (Sizes and Numbering)

7 Mention all tread & riser size for steps.

Sign

Minimum 2 numbers of sections are required

1. Section passing through toilet

2. Section passing through staircase

In addition to above mentioned above 2 sections, section of critical part of the building must be drawn – E.g., to check available
headroom under staircase / section through double height spaces etc.
DRWG NO: WDSC.02
SHEET TITLE: SECTION BB

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Check-List‌‌-‌‌Building‌‌Elevations‌B
‌ rief‌‌No.‌0‌ 4.03,‌‌04.04‌T
‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Building‌‌Elevations‌‌are‌‌drawn‌‌to‌‌convey‌‌how‌‌façade‌‌of‌‌the‌‌structure‌‌is‌‌going‌‌to‌l‌ook‌‌from‌‌outside‌.‌‌Drawing,‌‌a‌‌building‌  ‌
elevation,‌‌is‌‌a‌‌design‌‌development‌‌stage,‌‌as‌‌it‌‌is‌‌used‌‌to‌‌study‌‌the‌‌repercussions‌o
‌ f‌a
‌ pplication‌‌of‌‌different‌‌materials‌,‌w
‌ eather‌  ‌
protection‌t‌reatment,‌‌use‌‌of‌d ‌ ifferent‌‌elements‌‌on‌‌the‌‌building‌‌façade.‌‌    ‌

How‌‌some‌s ‌ ervices‌‌are‌‌exposed‌‌on‌‌the‌‌exterior‌‌face‌o ‌ f‌‌the‌‌building‌‌like,‌‌water‌‌/‌‌waste‌‌water‌‌/‌‌rain‌‌water‌‌down‌‌take‌‌pipes,‌  ‌


AC‌‌outdoor‌‌units‌‌etc.‌‌this‌‌can‌‌be‌‌shown‌‌understood‌‌and‌‌treated‌‌in‌‌the‌‌elevation‌‌to‌‌match‌‌the‌‌language‌‌of‌‌the‌‌building.‌‌A‌‌decision‌‌  
regarding,‌‌whether‌‌to‌e ‌ xpose‌‌the‌‌structural‌‌system‌o ‌ n‌‌façade‌‌or‌‌to‌‌treat‌‌it‌‌with‌‌finishing‌‌materials,‌‌can‌‌be‌‌taken‌‌after‌‌building‌  ‌
elevation‌‌is‌‌orthographically‌‌projected‌‌from‌‌the‌‌building‌‌plan‌‌and‌‌building‌‌section.‌‌Developing‌‌a‌‌building‌‌elevation‌‌is‌T ‌ O‌‌&‌‌FRO‌  ‌
process‌i‌n‌‌plan‌‌–‌‌section‌‌–‌‌elevation‌‌triad,‌‌how‌‌space‌‌will‌‌function,‌‌how‌‌it‌‌will‌‌be‌‌constructed‌‌and‌‌how‌‌it‌‌will‌‌look,‌‌which‌‌in‌‌turn‌‌
 
develops‌‌aesthetics‌‌of‌‌the‌‌built‌‌environment.‌‌    ‌

Building‌‌Elevation‌‌is‌‌an‌‌important‌‌drawing‌‌in‌‌the‌‌set‌‌of‌‌working‌‌drawing‌‌as‌‌it‌‌conveys‌‌the‌‌required‌‌pattern‌‌/‌‌language‌‌on‌‌the‌  ‌
façade‌‌of‌‌the‌‌building,‌‌and‌‌therefore‌‌it‌‌is‌‌easier‌‌to‌‌keep‌‌check‌‌on‌‌the‌‌façade‌‌while‌‌construction.‌‌Working‌‌Drawing‌‌Building‌‌Elevation‌ 
needs‌‌to‌‌furnish‌‌following‌i‌nformation‌‌-   ‌‌ ‌
1.‌‌Proper‌r‌ epresentation‌‌of‌‌building‌‌elements‌l‌ike‌‌–‌‌verandah,‌‌steps,‌‌weather‌‌shed,‌‌railing‌‌/‌‌parapet,‌‌openings,‌‌ducts‌‌etc.‌‌  
2.‌D‌ imensions‌– ‌ ‌‌Ground‌‌lvl‌‌to‌‌Terrace‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌OHWT‌‌Top‌‌lvl.‌‌3.‌A
‌ ll‌‌finish‌‌  
levels‌(‌ in‌‌mm)‌‌to‌‌be‌‌indicated‌‌on‌‌one‌‌side‌‌of‌‌elevation‌‌(preferably‌‌on‌‌right‌‌side‌‌of‌‌the‌‌drawing)‌‌4.‌C ‌ ross‌‌referencing‌o ‌ f‌‌the‌‌ 
drawings‌‌(for‌‌opening‌‌nos.,‌‌grid‌‌lines,‌‌elevation‌‌arrows,‌‌drawing‌‌numbering‌‌etc.)‌‌5.‌I‌nputs‌‌from‌‌consultants‌(‌ structural,‌‌  
MEP,‌‌HVAC,‌‌etc)‌‌    ‌

Check-List‌‌Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌ELEVATION‌‌) ‌ ‌ Drawing‌  ‌ WDEL‌‌-‌‌01‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Elevation‌‌of‌‌a‌‌building‌‌façade‌‌as‌‌per‌‌arrow‌‌marked‌‌on‌‌the‌‌plan‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Different‌‌building‌‌elements‌‌/‌‌components‌‌seen‌‌in‌‌elevation‌  ‌  ‌  ‌  ‌

 ‌ ‌ penings‌‌(with‌‌frames‌‌and‌‌number‌‌of‌‌shutters)‌  ‌
•‌O  ‌  ‌  ‌

 ‌ ‌ eather‌‌Protection‌‌Elements‌(‌weather‌‌sheds,‌‌louvers,‌‌fins‌‌etc.)‌  ‌
•‌W  ‌  ‌  ‌

 ‌ ‌ taircase‌‌tower‌‌with‌‌openings.‌‌Steps‌‌of‌‌plinth‌‌/‌‌external‌‌staircase‌(‌if‌‌any)‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ arapet‌‌/‌‌Railing,‌‌Coping‌‌lines‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ ny‌‌projections‌(‌terrace‌‌slab‌‌etc.),‌A
•‌A ‌ ny‌‌grooves,‌‌patterns‌‌made‌‌in‌‌external‌‌finishes‌  ‌  ‌  ‌  ‌

 ‌ ‌ ervice‌‌duct‌‌covering‌(‌if‌‌applicable)‌  ‌
•‌S  ‌ NA‌   ‌

3‌‌
   ‌ External‌‌finishes‌‌indication‌(‌part‌‌elevation)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Elevation‌‌with‌‌scale‌(‌coordinated‌‌with‌‌elevation‌‌arrows‌‌on‌‌plans)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌‌&‌‌staircases‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Opening‌‌numbers‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ducts‌‌/‌‌Shafts‌‌labeling‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌and‌‌numbering‌‌(coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌
6‌‌
   ‌ All‌‌finished‌‌levels‌(‌GL,‌‌formation‌‌lvl,‌‌plinth‌‌lvl,‌‌all‌‌FFL,‌‌mid‌‌landing‌‌&‌‌mezzanine‌‌lvl)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌‌with‌‌drawing‌‌numbers‌(‌openings,‌‌staircase,‌‌railing‌‌etc.)‌  ‌  ‌ NA‌   ‌

8‌‌
   ‌ External‌‌Finishes‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Surface‌‌levels‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Terrace‌‌Top‌‌Level‌‌
   ‌  ‌  ‌  ‌

2‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌OHWT‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Ridge‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Fascia‌‌Plate‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projections‌‌of‌‌Roof,‌‌Weather‌‌shed‌‌etc.‌‌from‌‌wall‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Callout‌‌box‌‌for‌‌elevation‌‌treatment‌‌detail‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

4‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌‌&‌‌Material‌‌Finishes‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌ NA‌   ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDEL.01
SHEET TITLE: ELEVATION.01

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Check-List‌‌-‌‌Building‌‌Elevations‌B
‌ rief‌‌No.‌0‌ 4.03,‌‌04.04‌T
‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Building‌‌Elevations‌‌are‌‌drawn‌‌to‌‌convey‌‌how‌‌façade‌‌of‌‌the‌‌structure‌‌is‌‌going‌‌to‌l‌ook‌‌from‌‌outside‌.‌‌Drawing,‌‌a‌‌building‌  ‌
elevation,‌‌is‌‌a‌‌design‌‌development‌‌stage,‌‌as‌‌it‌‌is‌‌used‌‌to‌‌study‌‌the‌‌repercussions‌o
‌ f‌a
‌ pplication‌‌of‌‌different‌‌materials‌,‌w
‌ eather‌  ‌
protection‌t‌reatment,‌‌use‌‌of‌d ‌ ifferent‌‌elements‌‌on‌‌the‌‌building‌‌façade.‌‌    ‌

How‌‌some‌s ‌ ervices‌‌are‌‌exposed‌‌on‌‌the‌‌exterior‌‌face‌o ‌ f‌‌the‌‌building‌‌like,‌‌water‌‌/‌‌waste‌‌water‌‌/‌‌rain‌‌water‌‌down‌‌take‌‌pipes,‌  ‌


AC‌‌outdoor‌‌units‌‌etc.‌‌this‌‌can‌‌be‌‌shown‌‌understood‌‌and‌‌treated‌‌in‌‌the‌‌elevation‌‌to‌‌match‌‌the‌‌language‌‌of‌‌the‌‌building.‌‌A‌‌decision‌‌  
regarding,‌‌whether‌‌to‌e ‌ xpose‌‌the‌‌structural‌‌system‌o ‌ n‌‌façade‌‌or‌‌to‌‌treat‌‌it‌‌with‌‌finishing‌‌materials,‌‌can‌‌be‌‌taken‌‌after‌‌building‌  ‌
elevation‌‌is‌‌orthographically‌‌projected‌‌from‌‌the‌‌building‌‌plan‌‌and‌‌building‌‌section.‌‌Developing‌‌a‌‌building‌‌elevation‌‌is‌T ‌ O‌‌&‌‌FRO‌  ‌
process‌i‌n‌‌plan‌‌–‌‌section‌‌–‌‌elevation‌‌triad,‌‌how‌‌space‌‌will‌‌function,‌‌how‌‌it‌‌will‌‌be‌‌constructed‌‌and‌‌how‌‌it‌‌will‌‌look,‌‌which‌‌in‌‌turn‌‌
 
develops‌‌aesthetics‌‌of‌‌the‌‌built‌‌environment.‌‌    ‌

Building‌‌Elevation‌‌is‌‌an‌‌important‌‌drawing‌‌in‌‌the‌‌set‌‌of‌‌working‌‌drawing‌‌as‌‌it‌‌conveys‌‌the‌‌required‌‌pattern‌‌/‌‌language‌‌on‌‌the‌  ‌
façade‌‌of‌‌the‌‌building,‌‌and‌‌therefore‌‌it‌‌is‌‌easier‌‌to‌‌keep‌‌check‌‌on‌‌the‌‌façade‌‌while‌‌construction.‌‌Working‌‌Drawing‌‌Building‌‌Elevation‌ 
needs‌‌to‌‌furnish‌‌following‌i‌nformation‌‌-   ‌‌ ‌
1.‌‌Proper‌r‌ epresentation‌‌of‌‌building‌‌elements‌l‌ike‌‌–‌‌verandah,‌‌steps,‌‌weather‌‌shed,‌‌railing‌‌/‌‌parapet,‌‌openings,‌‌ducts‌‌etc.‌‌  
2.‌D‌ imensions‌– ‌ ‌‌Ground‌‌lvl‌‌to‌‌Terrace‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌OHWT‌‌Top‌‌lvl.‌‌3.‌A
‌ ll‌‌finish‌‌  
levels‌(‌ in‌‌mm)‌‌to‌‌be‌‌indicated‌‌on‌‌one‌‌side‌‌of‌‌elevation‌‌(preferably‌‌on‌‌right‌‌side‌‌of‌‌the‌‌drawing)‌‌4.‌C ‌ ross‌‌referencing‌o ‌ f‌‌the‌‌ 
drawings‌‌(for‌‌opening‌‌nos.,‌‌grid‌‌lines,‌‌elevation‌‌arrows,‌‌drawing‌‌numbering‌‌etc.)‌‌5.‌I‌nputs‌‌from‌‌consultants‌(‌ structural,‌‌  
MEP,‌‌HVAC,‌‌etc)‌‌    ‌

Check-List‌‌Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌ELEVATION‌‌) ‌ ‌ Drawing‌  ‌ WDEL‌‌-‌‌02‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Elevation‌‌of‌‌a‌‌building‌‌façade‌‌as‌‌per‌‌arrow‌‌marked‌‌on‌‌the‌‌plan‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Different‌‌building‌‌elements‌‌/‌‌components‌‌seen‌‌in‌‌elevation‌  ‌  ‌  ‌  ‌

 ‌ ‌ penings‌‌(with‌‌frames‌‌and‌‌number‌‌of‌‌shutters)‌  ‌
•‌O  ‌  ‌  ‌

 ‌ ‌ eather‌‌Protection‌‌Elements‌(‌weather‌‌sheds,‌‌louvers,‌‌fins‌‌etc.)‌  ‌
•‌W  ‌  ‌  ‌

 ‌ ‌ taircase‌‌tower‌‌with‌‌openings.‌‌Steps‌‌of‌‌plinth‌‌/‌‌external‌‌staircase‌(‌if‌‌any)‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ arapet‌‌/‌‌Railing,‌‌Coping‌‌lines‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ ny‌‌projections‌(‌terrace‌‌slab‌‌etc.),‌A
•‌A ‌ ny‌‌grooves,‌‌patterns‌‌made‌‌in‌‌external‌‌finishes‌  ‌  ‌  ‌  ‌

 ‌ ‌ ervice‌‌duct‌‌covering‌(‌if‌‌applicable)‌  ‌
•‌S  ‌ NA‌   ‌

3‌‌
   ‌ External‌‌finishes‌‌indication‌(‌part‌‌elevation)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Elevation‌‌with‌‌scale‌(‌coordinated‌‌with‌‌elevation‌‌arrows‌‌on‌‌plans)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌‌&‌‌staircases‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Opening‌‌numbers‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ducts‌‌/‌‌Shafts‌‌labeling‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌and‌‌numbering‌‌(coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌
6‌‌
   ‌ All‌‌finished‌‌levels‌(‌GL,‌‌formation‌‌lvl,‌‌plinth‌‌lvl,‌‌all‌‌FFL,‌‌mid‌‌landing‌‌&‌‌mezzanine‌‌lvl)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌‌with‌‌drawing‌‌numbers‌(‌openings,‌‌staircase,‌‌railing‌‌etc.)‌  ‌  ‌ NA‌   ‌

8‌‌
   ‌ External‌‌Finishes‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Surface‌‌levels‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Terrace‌‌Top‌‌Level‌‌
   ‌  ‌  ‌  ‌

2‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌OHWT‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Ridge‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Fascia‌‌Plate‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projections‌‌of‌‌Roof,‌‌Weather‌‌shed‌‌etc.‌‌from‌‌wall‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Callout‌‌box‌‌for‌‌elevation‌‌treatment‌‌detail‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

4‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌‌&‌‌Material‌‌Finishes‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌ NA‌   ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDEL.02
SHEET TITLE: ELEVATION.02

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Check-List‌‌-‌‌Building‌‌Elevations‌B
‌ rief‌‌No.‌0‌ 4.03,‌‌04.04‌T
‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Building‌‌Elevations‌‌are‌‌drawn‌‌to‌‌convey‌‌how‌‌façade‌‌of‌‌the‌‌structure‌‌is‌‌going‌‌to‌l‌ook‌‌from‌‌outside‌.‌‌Drawing,‌‌a‌‌building‌  ‌
elevation,‌‌is‌‌a‌‌design‌‌development‌‌stage,‌‌as‌‌it‌‌is‌‌used‌‌to‌‌study‌‌the‌‌repercussions‌o
‌ f‌a
‌ pplication‌‌of‌‌different‌‌materials‌,‌w
‌ eather‌  ‌
protection‌t‌reatment,‌‌use‌‌of‌d ‌ ifferent‌‌elements‌‌on‌‌the‌‌building‌‌façade.‌‌    ‌

How‌‌some‌s ‌ ervices‌‌are‌‌exposed‌‌on‌‌the‌‌exterior‌‌face‌o ‌ f‌‌the‌‌building‌‌like,‌‌water‌‌/‌‌waste‌‌water‌‌/‌‌rain‌‌water‌‌down‌‌take‌‌pipes,‌  ‌


AC‌‌outdoor‌‌units‌‌etc.‌‌this‌‌can‌‌be‌‌shown‌‌understood‌‌and‌‌treated‌‌in‌‌the‌‌elevation‌‌to‌‌match‌‌the‌‌language‌‌of‌‌the‌‌building.‌‌A‌‌decision‌‌  
regarding,‌‌whether‌‌to‌e ‌ xpose‌‌the‌‌structural‌‌system‌o ‌ n‌‌façade‌‌or‌‌to‌‌treat‌‌it‌‌with‌‌finishing‌‌materials,‌‌can‌‌be‌‌taken‌‌after‌‌building‌  ‌
elevation‌‌is‌‌orthographically‌‌projected‌‌from‌‌the‌‌building‌‌plan‌‌and‌‌building‌‌section.‌‌Developing‌‌a‌‌building‌‌elevation‌‌is‌T ‌ O‌‌&‌‌FRO‌  ‌
process‌i‌n‌‌plan‌‌–‌‌section‌‌–‌‌elevation‌‌triad,‌‌how‌‌space‌‌will‌‌function,‌‌how‌‌it‌‌will‌‌be‌‌constructed‌‌and‌‌how‌‌it‌‌will‌‌look,‌‌which‌‌in‌‌turn‌‌
 
develops‌‌aesthetics‌‌of‌‌the‌‌built‌‌environment.‌‌    ‌

Building‌‌Elevation‌‌is‌‌an‌‌important‌‌drawing‌‌in‌‌the‌‌set‌‌of‌‌working‌‌drawing‌‌as‌‌it‌‌conveys‌‌the‌‌required‌‌pattern‌‌/‌‌language‌‌on‌‌the‌  ‌
façade‌‌of‌‌the‌‌building,‌‌and‌‌therefore‌‌it‌‌is‌‌easier‌‌to‌‌keep‌‌check‌‌on‌‌the‌‌façade‌‌while‌‌construction.‌‌Working‌‌Drawing‌‌Building‌‌Elevation‌ 
needs‌‌to‌‌furnish‌‌following‌i‌nformation‌‌-   ‌‌ ‌
1.‌‌Proper‌r‌ epresentation‌‌of‌‌building‌‌elements‌l‌ike‌‌–‌‌verandah,‌‌steps,‌‌weather‌‌shed,‌‌railing‌‌/‌‌parapet,‌‌openings,‌‌ducts‌‌etc.‌‌  
2.‌D‌ imensions‌– ‌ ‌‌Ground‌‌lvl‌‌to‌‌Terrace‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌OHWT‌‌Top‌‌lvl.‌‌3.‌A
‌ ll‌‌finish‌‌  
levels‌(‌ in‌‌mm)‌‌to‌‌be‌‌indicated‌‌on‌‌one‌‌side‌‌of‌‌elevation‌‌(preferably‌‌on‌‌right‌‌side‌‌of‌‌the‌‌drawing)‌‌4.‌C ‌ ross‌‌referencing‌o ‌ f‌‌the‌‌ 
drawings‌‌(for‌‌opening‌‌nos.,‌‌grid‌‌lines,‌‌elevation‌‌arrows,‌‌drawing‌‌numbering‌‌etc.)‌‌5.‌I‌nputs‌‌from‌‌consultants‌(‌ structural,‌‌  
MEP,‌‌HVAC,‌‌etc)‌‌    ‌

Check-List‌‌Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌ELEVATION‌‌) ‌ ‌ Drawing‌  ‌ WDEL‌‌-‌‌03‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Elevation‌‌of‌‌a‌‌building‌‌façade‌‌as‌‌per‌‌arrow‌‌marked‌‌on‌‌the‌‌plan‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Different‌‌building‌‌elements‌‌/‌‌components‌‌seen‌‌in‌‌elevation‌  ‌  ‌  ‌  ‌

 ‌ ‌ penings‌‌(with‌‌frames‌‌and‌‌number‌‌of‌‌shutters)‌  ‌
•‌O  ‌  ‌  ‌

 ‌ ‌ eather‌‌Protection‌‌Elements‌(‌weather‌‌sheds,‌‌louvers,‌‌fins‌‌etc.)‌  ‌
•‌W  ‌  ‌  ‌

 ‌ ‌ taircase‌‌tower‌‌with‌‌openings.‌‌Steps‌‌of‌‌plinth‌‌/‌‌external‌‌staircase‌(‌if‌‌any)‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ arapet‌‌/‌‌Railing,‌‌Coping‌‌lines‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ ny‌‌projections‌(‌terrace‌‌slab‌‌etc.),‌A
•‌A ‌ ny‌‌grooves,‌‌patterns‌‌made‌‌in‌‌external‌‌finishes‌  ‌  ‌  ‌  ‌

 ‌ ‌ ervice‌‌duct‌‌covering‌(‌if‌‌applicable)‌  ‌
•‌S  ‌ NA‌   ‌

3‌‌
   ‌ External‌‌finishes‌‌indication‌(‌part‌‌elevation)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Elevation‌‌with‌‌scale‌(‌coordinated‌‌with‌‌elevation‌‌arrows‌‌on‌‌plans)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌‌&‌‌staircases‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Opening‌‌numbers‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ducts‌‌/‌‌Shafts‌‌labeling‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌and‌‌numbering‌‌(coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌
6‌‌
   ‌ All‌‌finished‌‌levels‌(‌GL,‌‌formation‌‌lvl,‌‌plinth‌‌lvl,‌‌all‌‌FFL,‌‌mid‌‌landing‌‌&‌‌mezzanine‌‌lvl)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌‌with‌‌drawing‌‌numbers‌(‌openings,‌‌staircase,‌‌railing‌‌etc.)‌  ‌  ‌ NA‌   ‌

8‌‌
   ‌ External‌‌Finishes‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Surface‌‌levels‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Terrace‌‌Top‌‌Level‌‌
   ‌  ‌  ‌  ‌

2‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌OHWT‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Ridge‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Fascia‌‌Plate‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projections‌‌of‌‌Roof,‌‌Weather‌‌shed‌‌etc.‌‌from‌‌wall‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Callout‌‌box‌‌for‌‌elevation‌‌treatment‌‌detail‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

4‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌‌&‌‌Material‌‌Finishes‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌ NA‌   ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDEL.03
SHEET TITLE: ELEVATION.03

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pu‌ne‌ ‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V ‌ ‌‌(2019‌‌pattern)‌C
‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ at,‌‌17‌th‌Jul‌
‌ ay‌‌&‌‌Date:‌S ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌I‌ntroduction‌‌and‌‌ 
Check-List‌‌-‌‌Building‌‌Elevations‌B
‌ rief‌‌No.‌0‌ 4.03,‌‌04.04‌T
‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌‌  ‌
Building‌‌Elevations‌‌are‌‌drawn‌‌to‌‌convey‌‌how‌‌façade‌‌of‌‌the‌‌structure‌‌is‌‌going‌‌to‌l‌ook‌‌from‌‌outside‌.‌‌Drawing,‌‌a‌‌building‌  ‌
elevation,‌‌is‌‌a‌‌design‌‌development‌‌stage,‌‌as‌‌it‌‌is‌‌used‌‌to‌‌study‌‌the‌‌repercussions‌o
‌ f‌a
‌ pplication‌‌of‌‌different‌‌materials‌,‌w
‌ eather‌  ‌
protection‌t‌reatment,‌‌use‌‌of‌d ‌ ifferent‌‌elements‌‌on‌‌the‌‌building‌‌façade.‌‌    ‌

How‌‌some‌s ‌ ervices‌‌are‌‌exposed‌‌on‌‌the‌‌exterior‌‌face‌o ‌ f‌‌the‌‌building‌‌like,‌‌water‌‌/‌‌waste‌‌water‌‌/‌‌rain‌‌water‌‌down‌‌take‌‌pipes,‌  ‌


AC‌‌outdoor‌‌units‌‌etc.‌‌this‌‌can‌‌be‌‌shown‌‌understood‌‌and‌‌treated‌‌in‌‌the‌‌elevation‌‌to‌‌match‌‌the‌‌language‌‌of‌‌the‌‌building.‌‌A‌‌decision‌‌  
regarding,‌‌whether‌‌to‌e ‌ xpose‌‌the‌‌structural‌‌system‌o ‌ n‌‌façade‌‌or‌‌to‌‌treat‌‌it‌‌with‌‌finishing‌‌materials,‌‌can‌‌be‌‌taken‌‌after‌‌building‌  ‌
elevation‌‌is‌‌orthographically‌‌projected‌‌from‌‌the‌‌building‌‌plan‌‌and‌‌building‌‌section.‌‌Developing‌‌a‌‌building‌‌elevation‌‌is‌T ‌ O‌‌&‌‌FRO‌  ‌
process‌i‌n‌‌plan‌‌–‌‌section‌‌–‌‌elevation‌‌triad,‌‌how‌‌space‌‌will‌‌function,‌‌how‌‌it‌‌will‌‌be‌‌constructed‌‌and‌‌how‌‌it‌‌will‌‌look,‌‌which‌‌in‌‌turn‌‌
 
develops‌‌aesthetics‌‌of‌‌the‌‌built‌‌environment.‌‌    ‌

Building‌‌Elevation‌‌is‌‌an‌‌important‌‌drawing‌‌in‌‌the‌‌set‌‌of‌‌working‌‌drawing‌‌as‌‌it‌‌conveys‌‌the‌‌required‌‌pattern‌‌/‌‌language‌‌on‌‌the‌  ‌
façade‌‌of‌‌the‌‌building,‌‌and‌‌therefore‌‌it‌‌is‌‌easier‌‌to‌‌keep‌‌check‌‌on‌‌the‌‌façade‌‌while‌‌construction.‌‌Working‌‌Drawing‌‌Building‌‌Elevation‌ 
needs‌‌to‌‌furnish‌‌following‌i‌nformation‌‌-   ‌‌ ‌
1.‌‌Proper‌r‌ epresentation‌‌of‌‌building‌‌elements‌l‌ike‌‌–‌‌verandah,‌‌steps,‌‌weather‌‌shed,‌‌railing‌‌/‌‌parapet,‌‌openings,‌‌ducts‌‌etc.‌‌  
2.‌D‌ imensions‌– ‌ ‌‌Ground‌‌lvl‌‌to‌‌Terrace‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌lvl,‌‌Ground‌‌lvl‌‌to‌‌OHWT‌‌Top‌‌lvl.‌‌3.‌A
‌ ll‌‌finish‌‌  
levels‌(‌ in‌‌mm)‌‌to‌‌be‌‌indicated‌‌on‌‌one‌‌side‌‌of‌‌elevation‌‌(preferably‌‌on‌‌right‌‌side‌‌of‌‌the‌‌drawing)‌‌4.‌C ‌ ross‌‌referencing‌o ‌ f‌‌the‌‌ 
drawings‌‌(for‌‌opening‌‌nos.,‌‌grid‌‌lines,‌‌elevation‌‌arrows,‌‌drawing‌‌numbering‌‌etc.)‌‌5.‌I‌nputs‌‌from‌‌consultants‌(‌ structural,‌‌  
MEP,‌‌HVAC,‌‌etc)‌‌    ‌

Check-List‌‌Building‌‌Elevations:‌(‌Scale‌‌-‌‌1:50)‌ ‌
Project‌‌Name‌‌–W
‌ ORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌ELEVATION‌‌) ‌ ‌ Drawing‌  ‌ WDEL‌‌-‌‌04‌  ‌
Number‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Elevation‌‌of‌‌a‌‌building‌‌façade‌‌as‌‌per‌‌arrow‌‌marked‌‌on‌‌the‌‌plan‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Different‌‌building‌‌elements‌‌/‌‌components‌‌seen‌‌in‌‌elevation‌  ‌  ‌  ‌  ‌

 ‌ ‌ penings‌‌(with‌‌frames‌‌and‌‌number‌‌of‌‌shutters)‌  ‌
•‌O  ‌  ‌  ‌

 ‌ ‌ eather‌‌Protection‌‌Elements‌(‌weather‌‌sheds,‌‌louvers,‌‌fins‌‌etc.)‌  ‌
•‌W  ‌  ‌  ‌

 ‌ ‌ taircase‌‌tower‌‌with‌‌openings.‌‌Steps‌‌of‌‌plinth‌‌/‌‌external‌‌staircase‌(‌if‌‌any)‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ arapet‌‌/‌‌Railing,‌‌Coping‌‌lines‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ ny‌‌projections‌(‌terrace‌‌slab‌‌etc.),‌A
•‌A ‌ ny‌‌grooves,‌‌patterns‌‌made‌‌in‌‌external‌‌finishes‌  ‌  ‌  ‌  ‌

 ‌ ‌ ervice‌‌duct‌‌covering‌(‌if‌‌applicable)‌  ‌
•‌S  ‌ NA‌   ‌

3‌‌
   ‌ External‌‌finishes‌‌indication‌(‌part‌‌elevation)‌  ‌  ‌  ‌  ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Elevation‌‌with‌‌scale‌(‌coordinated‌‌with‌‌elevation‌‌arrows‌‌on‌‌plans)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Riser‌‌numbers‌‌for‌‌all‌‌steps‌‌&‌‌staircases‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Opening‌‌numbers‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ducts‌‌/‌‌Shafts‌‌labeling‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Grid‌‌lines‌‌labeling‌‌and‌‌numbering‌‌(coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌
6‌‌
   ‌ All‌‌finished‌‌levels‌(‌GL,‌‌formation‌‌lvl,‌‌plinth‌‌lvl,‌‌all‌‌FFL,‌‌mid‌‌landing‌‌&‌‌mezzanine‌‌lvl)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌‌with‌‌drawing‌‌numbers‌(‌openings,‌‌staircase,‌‌railing‌‌etc.)‌  ‌  ‌ NA‌   ‌

8‌‌
   ‌ External‌‌Finishes‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Surface‌‌levels‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Terrace‌‌Top‌‌Level‌‌
   ‌  ‌  ‌  ‌

2‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Staircase‌‌Tower‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌OHWT‌‌Top‌‌Level‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Ridge‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Ground‌‌Formation‌‌Level‌‌to‌‌Fascia‌‌Plate‌‌Level‌(‌in‌‌case‌‌of‌‌pitched‌‌roof)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Projections‌‌of‌‌Roof,‌‌Weather‌‌shed‌‌etc.‌‌from‌‌wall‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ Grid‌‌lines‌(‌in‌‌dashed‌‌line)‌&
‌ ‌‌labeling‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Callout‌‌box‌‌for‌‌elevation‌‌treatment‌‌detail‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

4‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌ NA‌   ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Schedule‌‌of‌‌Openings‌‌&‌‌Material‌‌Finishes‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌ NA‌   ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
DRWG NO: WDEL.04
SHEET TITLE: ELEVATION.04

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
Roll‌‌No.‌‌51‌  ‌
Vivekanand‌‌Institute‌‌of‌‌Technology’s‌‌
   ‌
Padmabhushan‌‌Dr.‌‌Vasantdada‌‌Patil‌‌College‌‌of‌‌Architecture‌‌
   ‌
274/2,‌‌275/2,‌‌282,‌‌Aditya‌‌Nisarg‌‌At‌‌Pirangut,‌‌Tal.‌‌Mulshi,‌‌Dist.‌‌Pune‌‌412115‌‌|‌t‌ el:‌0‌ 20-20291299,‌‌20291308,‌‌60129033,‌‌65349033‌‌|‌e‌ mail:‌p‌ vpcoapune@gmail.com,vitcoapune@gmail.com‌‌|‌w
‌ eb:‌w
‌ ww.pvpcoapune.com‌‌|‌b‌ log:‌w
‌ ww.pvpcoapuneblog.blogspot.com‌‌ 
Academic‌‌Year:‌2‌ 020‌‌–‌‌2021‌S ‌ emester:‌V‌ ‌‌(2019‌‌pattern)‌C‌ lass:‌T‌ hird‌‌Year‌‌B.‌‌Arch.‌D ‌ ed,‌‌11‌th‌Aug‌
‌ ay‌‌&‌‌Date:‌W ‌
‌2021‌S
‌ ubject:‌W
‌ orking‌‌Drawing‌‌I‌‌(‌‌WD-I‌‌)‌T‌ opic:‌C
‌ heck-List‌‌- ‌‌
Building‌‌Skin‌‌Sections‌‌and‌‌Building‌‌Envelope‌‌Details‌B‌ rief‌‌No.‌0‌ 5.02‌T
‌ eam:‌A‌ r.‌‌Devendra‌‌Deshpande,‌‌Ar.‌‌Vaibhav‌‌Kulkarni,‌‌Ar.‌‌Ashish‌‌Srivastava,‌‌Ar.‌‌Nikita‌‌Khade‌P ‌ repared‌‌by:‌D ‌ D‌‌   ‌

Check-List‌‌Building‌‌Skin‌‌Sections‌‌and‌‌Building‌‌Envelope‌‌Details:‌(‌Scale‌‌-‌‌1:20‌‌/‌‌1:10‌‌/‌‌1:5‌‌/‌‌1:2)‌‌  ‌
Project‌‌Name‌‌–‌‌WORKING‌‌DRAWING‌‌-‌‌I‌‌(‌‌SKIN‌‌SECTION,‌‌KITCHEN‌‌DETAILS‌‌&  
‌‌ ‌ Drawing‌  ‌ WDSS‌‌-‌‌01‌  ‌
O
‌ PENING‌‌DETAILS‌‌) ‌ ‌ Number‌  ‌ WDDT‌‌-‌‌01‌  ‌
WDDT‌‌-‌‌02‌  ‌
WDDT‌‌-‌‌03‌  ‌

 ‌

No.‌‌
   Description‌‌
   ‌ Drawn‌‌by‌‌  ‌ Checked‌‌  Approved‌‌ 
by‌‌  ‌ by‌ ‌

Name‌  ‌ KARTIK‌  ‌ SHIVAM‌  ‌   ‌

A.‌‌Drawing‌‌Contents‌  ‌

1‌‌
   ‌ Detail‌‌section‌‌of‌‌exterior‌‌wall‌‌of‌‌a‌‌structure‌(‌at‌‌1:20‌‌scale)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Building‌‌components‌‌&‌‌elements‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Structural‌‌system,‌‌framing‌‌and‌‌its‌‌components‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Elevation‌‌of‌‌spaces‌‌beyond‌‌section‌‌plane‌(‌wrt‌‌plans)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ Indication‌‌of‌‌level‌‌lines‌‌on‌‌section‌‌(dashed‌‌line)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Opening‌‌&‌‌its‌‌components‌(‌sill,‌‌lintel,‌‌frames,‌‌shutter,‌‌weather‌‌shed‌‌etc.)‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Structural‌‌lines‌(‌Plinth‌‌PCC,‌‌Slab,‌‌Walls,‌‌Beams,‌‌Bands‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌structural‌‌section‌‌line)‌  ‌  ‌  ‌  ‌

8‌‌
   ‌ Finish‌‌lines‌(‌Plaster,‌‌flooring,‌‌skirting‌‌etc.‌‌to‌‌be‌‌indicated‌‌in‌‌elevation‌‌line)‌  ‌  ‌  ‌  ‌

9‌‌
   ‌ Water‌‌proofing‌‌treatment‌‌at‌‌Ground‌‌Floor‌(‌DPC)‌,‌‌Terrace‌‌floor‌  ‌  ‌  ‌  ‌

10‌‌
   ‌ Materials‌‌indication‌(‌hatches)‌  ‌  ‌  ‌  ‌

11‌‌
   ‌ Blown‌‌up‌‌details‌(‌1:5‌‌/‌‌1:2)‌  ‌  ‌  ‌  ‌

 ‌ ‌ linth‌‌protection‌‌detail‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ kirting‌‌detail‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ ill‌‌detail‌  ‌
•‌S  ‌  ‌  ‌

 ‌ ‌ eather‌‌protection‌‌detail‌  ‌
•‌W  ‌  ‌  ‌

 ‌ ‌ errace‌‌water‌‌proofing‌‌detail‌  ‌
•‌T  ‌  ‌  ‌

 ‌ ‌ arapet‌‌coping‌‌detail‌  ‌
•‌P  ‌  ‌  ‌

 ‌ ‌ itch‌‌roof‌‌resting‌‌detail‌(‌if‌‌applicable)‌  ‌
•‌P  ‌ NA‌   ‌

B.‌‌Nomenclature,‌‌Labeling‌‌and‌‌Text‌  ‌

1‌‌
   ‌ Title‌‌of‌‌Skin‌‌Section‌‌with‌‌scale‌(‌coordinated‌‌with‌‌section‌‌lines‌‌on‌‌plans)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Title‌‌of‌‌Blown‌‌up‌‌Details‌‌with‌‌proper‌‌nomenclature‌‌with‌‌scale‌‌and‌‌labelling‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Room‌‌/‌‌Space‌‌name‌(‌coordinated‌‌with‌‌plans)‌‌–‌‌mention‌‌IN‌‌and‌‌OUT‌‌side‌‌of‌‌the‌‌building‌  ‌  ‌  ‌  ‌
4‌‌
   ‌ Opening‌‌numbers‌(‌coordinated‌‌with‌‌plans)‌  ‌  ‌  ‌  ‌

5‌‌
   ‌ All‌‌finished‌‌levels‌(‌GL,‌‌formation‌‌lvl,‌‌all‌‌FFL,‌‌mid‌‌landing‌‌&‌‌mezzanine‌‌lvl)‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Material‌‌/‌‌Building‌‌component‌‌specification‌  ‌  ‌  ‌  ‌

7‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌‌with‌‌drawing‌‌numbers‌  ‌  ‌  ‌  ‌

C.‌‌Dimensions‌  ‌

1‌‌
   ‌ Top‌‌of‌‌FFL‌‌to‌‌Top‌‌of‌‌FFL‌‌of‌‌all‌‌floors‌(‌in‌‌one‌‌line)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Sill‌‌and‌‌Lintel‌‌height‌‌from‌‌FFL‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Railing‌‌and‌‌Parapet‌‌height‌‌from‌‌FFL‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Dado‌‌/‌‌Cladding‌‌heights‌‌from‌‌FFL‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Projections‌‌of‌‌Roof,‌‌Weather‌‌shed‌‌etc.‌  ‌  ‌  ‌  ‌

6‌‌
   ‌ Dado‌‌/‌‌Cladding‌‌heights‌‌from‌‌FFL‌  ‌  ‌ NA‌   ‌

7‌‌
   ‌ Dimensions‌‌in‌‌details‌‌(check‌‌the‌‌list‌‌of‌‌blown‌‌up‌‌details)‌  ‌  ‌  ‌  ‌

D.‌‌Reference‌‌Information,‌‌Annotations‌‌and‌‌Symbols‌  ‌

1‌‌
   ‌ Details‌‌call‌‌out‌‌boxes‌‌with‌‌appropriate‌‌labeling‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Cross‌‌referencing‌‌of‌‌details‌(‌door,‌‌window,‌‌kitchen‌‌platform‌‌etc.)‌  ‌  ‌  ‌  ‌

3‌‌
   ‌ Grid‌‌lines‌‌&‌‌labelling‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Key‌‌Plan‌‌of‌‌campus‌‌indicating‌‌selected‌‌structure‌‌for‌‌preparing‌‌the‌‌WD‌‌set‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Specification‌‌for‌‌building‌‌elements‌‌/‌‌components.‌  ‌  ‌  ‌  ‌

E.‌‌Schedules,‌‌Notes,‌‌Legends‌‌and‌‌Nameplate‌  ‌

1‌‌
   ‌ Copy‌‌right‌‌note,‌‌Construction‌‌Notes‌(‌Standard‌‌and‌‌Drawing‌‌specific)‌  ‌  ‌  ‌  ‌

2‌‌
   ‌ Legend‌‌–‌‌material‌‌hatch,‌‌symbols‌‌used,‌‌specific‌‌annotations‌  ‌  ‌ NA‌   ‌

3‌‌
   ‌ Updated‌‌nameplate‌‌with‌‌project‌‌name,‌‌date,‌‌scale‌‌etc.‌  ‌  ‌  ‌  ‌

4‌‌
   ‌ Revision‌‌table‌‌update,‌‌Purpose‌‌of‌‌drawing‌‌release‌  ‌  ‌ NA‌   ‌

5‌‌
   ‌ Schedule‌‌of‌‌Openings‌‌and‌‌Material‌‌Finishes‌  ‌  ‌ NA‌   ‌

6‌‌
   ‌ Mention‌‌all‌‌tread‌‌&‌‌riser‌‌size‌‌for‌‌steps.‌  ‌  ‌  ‌  ‌

Sign‌  ‌  ‌  ‌  ‌

 ‌
 ‌
2‌‌nos.‌‌of‌‌skin‌‌sections‌‌are‌‌required‌‌covering‌‌following‌‌details‌‌at‌‌different‌‌locations‌‌
   ‌

1.‌‌Opening‌‌with‌‌sill‌‌and‌‌without‌‌sill‌‌
   ‌
2.‌‌Plinth‌‌and‌‌steps‌‌(its‌‌protection‌‌details)‌‌
   ‌
3.‌‌Critical‌‌part‌‌of‌‌the‌‌building‌‌
   ‌
4.‌‌Fenestration‌‌detail‌‌(if‌‌any)‌‌   ‌
5.‌‌Response‌‌to‌‌context‌‌(in‌‌form‌‌of‌‌weather‌‌shed‌‌/‌‌planter‌‌box,‌‌jaali,‌‌etc.)‌  ‌
DRWG NO: WDSS.01
SHEET TITLE: SKIN SECTION.01

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
DRWG NO: WDDT.01
SHEET TITLE: DOOR DETAILS

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.

4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com
DRWG NO: WDPL.03
SHEET TITLE: KITCHEN & WINDOW

NOTES:
1 ) ALL DIMENSIONS ARE IN MILLIMETER.

2 ) ONLY WRITTEN DIMENSIONS SHOULD BE CONSIDERED.

3 ) REFER TO DETAILS WHEREVER MENTIONED IN THE

DRAWINGS.
4 ) FOR SERVICE DETAILS REFER SERVICE CONSULTANTS

DRAWINGS.
5 ) ANY QUERIES IN THE DRWG SHOULD BE CONSULTED TO

THE ARCHITECT.

LEGEND:

FINISHES SCHEDULE:

REVISION:

NO. DATE DESCRIPTION

OWNER NAME & ADDRESS:- KARTIK PAWALE


CURRENT ADDRESS : PIRANGUT MULSHI, PUNE 412115

PROJECT NAME: PROPOSED DWELLING UNIT,


ADDRESS OF THE SITE : NAVSAHYADRI GARDEN,PUNE

CONSULTANTS CONTACT NO

STRUCTURAL

PHE (MEP)

NORTH

NAME KARTIK PAWALE

ROLL NO. 51

DATE 2 OCTOBER 2021

SCALE 1 : 50

DRAWN BY KARTIK PAWALE SIGN & STAMP

CHECKED BY SHIVAM KARNIK

APPROVED BY AR. DEVENDRA DESHPANDE

WORKING DRAWING STUDIO

III Year B. Arch. Sem I (2021-22)

Vivekanand Institute of Technology's


Padmabhushan Dr. Vasantdada Patil College of Architecture

274/2, 275/2, 282, Aditya Nisarg At. Pirangut, Tal. Mulshi, Dist. Pune - 412115 Tel: 020-20291299, 20291308, 60129033, 65349033
EMail:pvpcoapune@gmail.com,vitcoapune@gmail.com web:www.pvpcoapune.edu.in, blog:www.pvpcoapuneblog.blogspot.com

You might also like