THE MAJ Page 1

RESIDENCES MONITORING STRUKTUR


BEKASI ENGINERING PROSES MK PROSES
SHOP DRAWING (1) STATUS SHOP DRAWING (2) STATUS SHOP DRAWING (3) SHOP DRAWING (4) SHOP DRAWING (R0) STATUS SHOP DRAWING (R1) STATUS
NO NO.LB NO.GAMBAR JUDUL GAMBAR
TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL

1 A. PERSIAPAN

2 1 SD-SM-S-0.01 SITE MANAGEMENT OFFICE 1 18/02/2021

3 2 SD-SM-S-0.02 DETAIL PONDASI TC.2 MC 310 JIB 60 M

4 3 SD-SM-S-0.03 DENAH SITE OFFICE

5 1 SD-TC-S-0.01 TOWER CRANE SITE PLAN

6 2 SD-TC-S-0.02 TOWER CRANE SITE PLAN

7 3 SD-TC-S-0.03 DETAIL PONDASI TC.1 MC 465 JIB 80 M

B. SUB STRUCTURE GF -0.60

8 1 SD-PC-S-02.2 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) 08/12/2021 15/12/2021

9 2 SD-PC-S-02.2.1 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 1 15/12/2021

10 3 SD-PC-S-02.2.2 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 2 15/12/2021

11 4 SD-PC-S-02.2.4 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 3 15/12/2021

12 5 SD-PC-S-02.2.4 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 4 15/12/2021

13 6 SD-PC-S-02.2.5 SECTION GRID 2 15/12/2021

14 7 SD-PC-S-02.2.6 SECTION GRID 10 15/12/2021

15 8 SD-PC-S-02.2.7 SECTION GRID 24 15/12/2021

16 9 SD-PC-S-02.2.8 SECTION GRID 27 15/12/2021

17 10 SD-PC-S-02.2.9 SECTION GRID B 15/12/2021

18 11 SD-PC-S-02.2.10 SECTION GRID E 15/12/2021

19 12 SD-PC-S-02.2.11 SECTION GRID L 15/12/2021

20 13 SD-PC-S-02A PC1 FOUNDATION DETAIL & SECTION 15/12/2021

21 14 SD-PC-S-02A_1 PC2 FOUNDATION DETAIL & SECTION 15/12/2021

22 15 SD-PC-S-02A_2 PC3 FOUNDATION DETAIL & SECTION 15/12/2021

23 16 SD-PC-S-02B PC6 FOUNDATION DETAIL PLAN 15/12/2021

24 17 SD-PC-S-02B_1 PC6 FOUNDATION DETAIL & SECTION 15/12/2021

25 18 SD-PC-S-02E PC16 FOUNDATION DETAIL & SECTION 15/12/2021

26 19 SD-PC-S-02E_1 PC16 FOUNDATION DETAIL & SECTION 15/12/2021

27 20 SD-PC-S-02F PC18 FOUNDATION DETAIL & SECTION 15/12/2021

28 21 SD-PC-S-02F_1 PC20 FOUNDATION DETAIL & SECTION 15/12/2021

29 22 SD-PC-S-02K PC20A FOUNDATION DETAIL & SECTION 15/12/2021

30 23 SD-PC-S-02G PC30A FOUNDATION DETAIL PLAN 15/12/2021

31 24 SD-PC-S-02G_1 PC30A FOUNDATION DETAIL & SECTION 15/12/2021

32 25 SD-PC-S-02A.3 TIEBEAM REINFORCEMENT DETAIL 15/12/2021

33 26 SD-PC-S-02P_1 GROUND FLOOR DETAIL & SECTION 1 15/12/2021

34 27 SD-PC-S-02P_2 GROUND FLOOR DETAIL & SECTION B 22/03/2021 15/12/2021

C. SUB STRUCTURE UNDER GROUND -2.10

31 1 SD-PC-S-02.1 FOUNDATION UNDER GROUND PLAN (SFL. -2.10 PIT LIFT) 01/05/2021 08/05/2021 B 22/12/2021

32 2 SD-PC-S-02L PL66 FOUNDATION DETAIL PLAN B 22/12/2021

33 3 SD-PC-S-02M PL66 FOUNDATION DETAIL SECTION B 22/12/2021

34 4 SD-PC-S-02L_1 PL66A FOUNDATION DETAIL PLAN B 22/12/2021

35 5 SD-PC-S-02M_1 PL66A FOUNDATION DETAIL SECTION B 22/12/2021

36 6 SD-PC-S-02N PL54 FOUNDATION DETAIL 01/05/2021 08/05/2021 B 22/12/2021

37 7 SD-PC-S-02O PL54 FOUNDATION DETAIL SECTION 08/05/2021 B 22/12/2021

38 8 SD-PC-S-02Q PL80 FOUNDATION DETAIL 08/05/2021 B 22/12/2021

39 9 SD-PC-S-02Q_1 PL80 FOUNDATION DETAIL SECTION B 22/12/2021

D. SUB STRUCTURE UNDER GROUND -3.20 & -5.30

43 1 SD-PC-S-02 FOUNDATION UNDER GROUND PLAN (SFL. -5.30 & -3.20 STP/GWT) 03/06/2021 B 29/12/2021

44 2 SD-PC-S-02.0A FOUNDATION UNDER GROUND PLAN (SFL. -5.30 STP) B 29/12/2021

45 3 SD-PC-S-02A_1.1 PC1 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) B 29/12/2021

46 4 SD-PC-S-02A_1.2 PC2 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) B 29/12/2021

47 5 SD-PC-S-02A_1.3 PC3 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) B 29/12/2021

49 1 SD-PC-S-02.0B FOUNDATION UNDER GROUND PLAN (SFL.-3.20 GWT) B 29/12/2021

50 2 SD-PC-S-02.0B.1 FOUNDATION UNDER GROUND SECTION (SFL.-3.20 GWT) B 29/12/2021

51 3 SD-PC-S-02A_2.3 PC3 SECTION DETAIL UNDER GROUND (SFL.-3.20 GWT) B 29/12/2021


THE MAJ Page 2
RESIDENCES MONITORING STRUKTUR
BEKASI ENGINERING PROSES MK PROSES
SHOP DRAWING (1) STATUS SHOP DRAWING (2) STATUS SHOP DRAWING (3) SHOP DRAWING (4) SHOP DRAWING (R0) STATUS SHOP DRAWING (R1) STATUS
NO NO.LB NO.GAMBAR JUDUL GAMBAR
TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL

52 4 SD-PC-S-02A.3_1 TIEBEAM REINFORCEMENT DETAIL UNDER GROUND (SFL.-3.20 GWT) B 29/12/2021

E. STRUCTURE COLUMN

54 1 SD-CL-S-03 COLUMN PLAN 24/05/2021 B 23/12/2021

55 2 SD-CL-S-03_1 COLUMN PLAN PARSIAL 1 B 23/12/2021

56 3 SD-CL-S-03_2 COLUMN PLAN PARSIAL 2 B 23/12/2021

57 4 SD-CL-S-03_3 COLUMN PLAN PARSIAL 3 B 23/12/2021

58 5 SD-CL-S-03_4 COLUMN PLAN PARSIAL 4 B 23/12/2021

59 6 SD-CL-S-03A COLUMN DETAIL & SECTION C1 #1 B 23/12/2021

60 7 SD-CL-S-03A_1 COLUMN DETAIL & SECTION C1 #2 B 23/12/2021

61 8 SD-CL-S-03A_2 COLUMN DETAIL & SECTION C2 #1 B 23/12/2021

62 9 SD-CL-S-03A_3 COLUMN DETAIL & SECTION C2 #2 B 23/12/2021

63 10 SD-CL-S-03A_4 COLUMN DETAIL & SECTION C3 #1 B 23/12/2021

11 SD-CL-S-03A_5 COLUMN DETAIL & SECTION C3 #2 23/12/2021

12 SD-CL-S-03D_1 COLUMN DETAIL & SECTION C4 23/12/2021

13 SD-CL-S-03E_1 COLUMN DETAIL & SECTION CSG 23/12/2021

14 SD-CL-S-03D_3 COLUMN DETAIL & SECTION C4S 23/12/2021

15 SD-CL-S-03D_4 COLUMN DETAIL & SECTION C44 23/12/2021

16 SD-CL-S-03E_1 COLUMN DETAIL & SECTION C4F 23/12/2021

17 SD-CL-S-03E_2 COLUMN DETAIL & SECTION C6 #1 23/12/2021

18 SD-CL-S-03E_3 COLUMN DETAIL & SECTION C6 #2 23/12/2021

19 SD-CL-S-03E_4 COLUMN DETAIL & SECTION C9 23/12/2021

20 SD-CL-S-03F COREWALL REINFORCEMENT DETAIL ( CW 1 ) 23/12/2021

21 SD-CL-S-03G COREWALL REINFORCEMENT DETAIL ( CW 2 ) 23/12/2021

22 SD-CL-S-03G_1 COREWALL REINFORCEMENT TABEL ( CW 1, & CW 2 ) 23/12/2021

23 SD-CL-S-03B COLUMN PLAN TYPICAL 23/12/2021

24 SD-CL-S-03B.1 COLUMN PLAN TYPICAL PARSIAL 1 & 2 23/12/2021

25 SD-CL-S-03B.2 COLUMN PLAN TYPICAL PARSIAL 3 23/12/2021

F. STRUCTURE GROUND FLOOR (SFL. -0.05)

1 SD-GF-S-02.3 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) 17/01/2022

2 SD-GF-S-02.3_1 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 1 17/01/2022

3 SD-GF-S-02.3_2 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 2 17/01/2022

4 SD-GF-S-02.3_3 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 3 17/01/2022

5 SD-GF-S-02.3_4 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 4 17/01/2022

6 SD-SG-S-50 SECTION GRID 3 17/01/2022

7 SD-SG-S-50_1 SECTION DETAIL GRID 3 17/01/2022

8 SD-SG-S-52 SECTION GRID 8 17/01/2022

9 SD-SG-S-52_1 SECTION DETAIL SECTION - B 17/01/2022

10 SD-SG-S-52_2 SECTION DETAIL SECTION - B 17/01/2022

11 SD-BL-S-02A BEAM REINFORCEMENT DETAIL & SECTION 17/01/2022

12 SD-BL-S-02A_1 BEAM REINFORCEMENT DETAIL & SECTION 17/01/2022

G. STRUCTURE 1st PARKING FLOOR (SFL. +3.45)

1 SD-BP-S-04 BEAM & PLAT 1st PARKING FLOOR PLAN 15/02/2022

2 SD-BP-S-04_1 BEAM & PLAT 1st PARKING FLOOR PLAN #1 15/02/2022

3 SD-BP-S-04_2 BEAM & PLAT 1st PARKING FLOOR PLAN #2 15/02/2022

4 SD-BP-S-04_3 BEAM & PLAT 1st PARKING FLOOR PLAN #3 15/02/2022

5 SD-BP-S-04_4 BEAM & PLAT 1st PARKING FLOOR PLAN #4 15/02/2022

6 SD-BP-S-50.1_1 SECTION GRID 2 & DETAIL 1st PARKING FLOOR 15/02/2022

7 SD-BP-S-50.1_2 SECTION GRID 4-5 & 11-12 1st PARKING FLOOR 15/02/2022

8 SD-BP-S-50.1_3 SECTION GRID 21-22 & 27-28 1st PARKING FLOOR 15/02/2022

9 SD-BP-S-50.1_4 SECTION GRID E-F & K-L 1st PARKING FLOOR 15/02/2022

10 SD-BP-S - 40A BEAM REINFORCEMENT 1st PARKING FLOOR #1 15/02/2022

11 SD-BP-S - 40B BEAM REINFORCEMENT 1st PARKING FLOOR #2 15/02/2022

12 SD-BP-S - 40C BEAM REINFORCEMENT 1st PARKING FLOOR #3 15/02/2022

13 SD-BP-S - 40D BEAM REINFORCEMENT 1st PARKING FLOOR #4 15/02/2022

14 SD-BP-S - 40E BEAM REINFORCEMENT 1st PARKING FLOOR #5 15/02/2022

15 SD-P1-S - 41 SLAB REINFORCEMENT PLAN 1st PARKING FLOOR D1 15/02/2022


THE MAJ Page 3
RESIDENCES MONITORING STRUKTUR
BEKASI ENGINERING PROSES MK PROSES
SHOP DRAWING (1) STATUS SHOP DRAWING (2) STATUS SHOP DRAWING (3) SHOP DRAWING (4) SHOP DRAWING (R0) STATUS SHOP DRAWING (R1) STATUS
NO NO.LB NO.GAMBAR JUDUL GAMBAR
TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL

16 SD-P1-S - 41_1 SLAB REINFORCEMENT SECTION 15/02/2022

17 SD-P1-S - 41A SLAB REINFORCEMENT PLAN 1st PARKING FLOOR D2 15/02/2022

18 SD-P1-S - 41A_1 SLAB REINFORCEMENT SECTION 15/02/2022

H. BEAMS & SLAB 2nd PARKING FLOOR PLAN ( SL+6,95 )

10

11

12

13

14

15

I. BEAMS & SLAB 3rd PARKING FLOOR PLAN ( SL.+10,45 )

10

11

12

13

14

15

J. BEAMS & SLAB 1st FLOOR PLAN ( SL.+13,95 )

1 SD-BP-S-07

10

11

12

13

14

15

K. STRUCTURE FIRE STAIR DETAIL

1 SD-FS-S - 43A FIRE STAIR TG1 PASENGER PLAN 21/02/2022

2 SD-FS-S - 43A_1 FIRE STAIR TG1 PASENGER SECTION 21/02/2022

3 SD-FS-S - 43A_2 FIRE STAIR TG1 BEAM REINFORCEMENT DETAIL 21/02/2022


THE MAJ Page 4
RESIDENCES MONITORING STRUKTUR
BEKASI ENGINERING PROSES MK PROSES
SHOP DRAWING (1) STATUS SHOP DRAWING (2) STATUS SHOP DRAWING (3) SHOP DRAWING (4) SHOP DRAWING (R0) STATUS SHOP DRAWING (R1) STATUS
NO NO.LB NO.GAMBAR JUDUL GAMBAR
TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL

1 SD-FS-S - 43B FIRE STAIR TG2 PASENGER PLAN 222/2022

2 SD-FS-S - 43B_1 FIRE STAIR TG2 PASENGER SECTION 222/2022

3 SD-FS-S - 43B_2 FIRE STAIR TG2 BEAM REINFORCEMENT DETAIL 222/2022

1 SD-FS-S - 43C FIRE STAIR TG3 PASENGER PLAN

2 SD-FS-S - 43C_1 FIRE STAIR TG3 PASENGER SECTION

3 SD-FS-S - 43C_2 FIRE STAIR TG3 BEAM REINFORCEMENT DETAIL

1 SD-FS-S - 43D FIRE STAIR TG4 PASENGER PLAN

2 SD-FS-S - 43D_1 FIRE STAIR TG4 PASENGER SECTION

3 SD-FS-S - 43D_2 FIRE STAIR TG4 BEAM REINFORCEMENT DETAIL

L. STRUCTURE RAMP DETAIL

1 SD-RAM-S - 44 SWIMMING POOL PLAN

2 SD-RAM-S - 44_1 SWIMMING POOL SECTION & DETAIL

M. STRUCTURE SWIMMING POOL

1 SD-SP-S - 43 SWIMMING POOL PLAN

2 SD-SP-S - 43_1 SWIMMING POOL SECTION & DETAIL

N. STRUCTURE STP DETAIL

1 SD-STP-S-46 FOUNDATION & SERVICE FLOOR PLAN

2 SD-STP-S-46_1 STP FOUNDATION FLOOR PLAN

3 SD-STP-S-46_2 STP SERVICE FLOOR PLAN

4 SD-STP-S-46_3 STP ROOF PLAN & STP ROOF TOP PLAN

5 SD-STP-S-46_4 STP ROOF PLAN ( PARSIAL )

6 SD-STP-S-46_5 STP ROOF TOP PLAN ( PARSIAL )

7 SD-STP-S-46A POTONGAN 1 & POTONGAN 2 STP

8 SD-STP-S-46A_1 SECTION 1 STP PARSIAL

9 SD-STP-S-46A_2 SECTION 2 STP PARSIAL

10 SD-STP-S-46A_3 SECTION 3~5 STP

11 SD-STP-S-46A_4 SECTION DETAIL STP

12 SD-STP-S-46A_5 BEAM REINFORSEMEN STP

F. STRUCTURE GWT DETAIL

64 1 SD-GWT-S-47 GWT FOUNDATION PLAN ( SFL. -3.20 ) 05/05/2021 10/05/2021 B


65 2 SD-GWT-S-47_1 GWT ROOF PLAN (SFL. -0.05 ) B
66 3 SD-GWT-S-47_2 GWT SECTION B
67 4 SD-GWT-S-47_3 GWT SECTION B
68 5 SD-GWT-S-47_3A GWT SECTION DETAIL B
69 6 SD-GWT-S-47_4 GWT SECTION DETAIL B
70 7 SD-GWT-S-02A.3_2 TIEBEAM DETAIL GWT (SFL. -0.05 ) B

P. STRUCTURE FIRE TANK DETAIL

72 1 SD-FF-S-02 WALL DETAIL FIRE TANK PLAN EL.-2.100 05/05/2021 10/05/2021 B


73 2 SD-FF-S-02_1 WALL DETAIL FIRE TANK PLAN EL.-0.50 B
74 3 SD-FF-S-02_2 WALL DETAIL FIRE TANK PLAN EL.+3.450 B
75 4 SD-FF-S-02_3 FIRE TANK WALL DETAIL SECTION 1 B
76 5 SD-FF-S-02_4 FIRE TANK WALL DETAIL SECTION 2 B
77 6 SD-FF-S-02_5 FIRE TANK WALL TYPE DETAIL B

=
Appro
CATAT ved /
AN: Appro
ved as
A/B =noted
= Re -
Reject
C edsubmit
/
Refuse
E d
=
Submit
THE MAJ Page 5
RESIDENCES MONITORING STRUKTUR
BEKASI ENGINERING PROSES MK PROSES
SHOP DRAWING (1) STATUS SHOP DRAWING (2) STATUS SHOP DRAWING (3) SHOP DRAWING (4) SHOP DRAWING (R0) STATUS SHOP DRAWING (R1) STATUS
NO NO.LB NO.GAMBAR JUDUL GAMBAR
TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL TGL PENGJN TGL KMBL APPROVAL
THE MAJ APARTEMENT
BEKASI - JAWA BARAT - INDONESIA
Drawing List STRUKTUR PT. REKAGUNATEK PERSADA
NO.L STATUS
NO DRAWING NO. TITLE DRAWING SCALE PIC NOTE
B FINISH REV NONE
SD/RKG-MAJ PERSIAPAN
A. S-000 SERIES ( General )
1 1 SD-SM-S-0.01 SITE MANAGEMENT OFFICE 1 1:1000 X
2 2 SD-SM-S-0.02 SITE MANAGEMENT OFFICE 2 1:400 X
3 3 SD-SM-S-0.03 DENAH SITE OFFICE 1:100 X

4 1 SD-TC-S-0.01 TOWER CRANE SITE PLAN 1:1000 X


5 2 SD-TC-S-0.02 TOWER CRANE SITE PLAN 1:400 X
6 3 SD-TC-S-0.03 DETAIL PONDASI TC.1 MC 465 JIB 80 M 1:100 X
7 4 SD-TC-S-0.04 DETAIL PONDASI TC.2 MC 310 JIB 60 M 1:100 CANCELED

B. SD/RKG-MAJ SUB STRUCTURE GF -0.60


8 1 SD-PC-S-02.2 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) 1:300 X
9 2 SD-PC-S-02.2.1 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 1 1:150 X
10 3 SD-PC-S-02.2.2 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 2 1:150 X
11 4 SD-PC-S-02.2.3 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 3 1:150 X
12 5 SD-PC-S-02.2.4 FOUNDATION & BEAMS GROUND FLOOR PLAN (SFL -0,60) PART 4 1:150 X
13 6 SD-PC-S-02.2.5 SECTION GRID 2 1:130 X
14 7 SD-PC-S-02.2.6 SECTION GRID 10 1:130 X
15 8 SD-PC-S-02.2.7 SECTION GRID 24 1:130 X
16 9 SD-PC-S-02.2.8 SECTION GRID 27 1:130 X
17 10 SD-PC-S-02.2.9 SECTION GRID B 1:130 X
18 11 SD-PC-S-02.2.10 SECTION GRID E 1:130 X
19 12 SD-PC-S-02.2.11 SECTION GRID L 1:130 X
20 13 SD-PC-S-02A PC1 FOUNDATION DETAIL & SECTION 1:20 X
21 14 SD-PC-S-02A_1 PC2 FOUNDATION DETAIL & SECTION 1:20 X
22 15 SD-PC-S-02A_2 PC3 FOUNDATION DETAIL & SECTION 1:20 X
23 16 SD-PC-S-02B PC6 FOUNDATION DETAIL PLAN 1:20 X
24 17 SD-PC-S-02B_1 PC6 FOUNDATION DETAIL & SECTION 1:20 X
25 18 SD-PC-S-02E PC16 FOUNDATION DETAIL & SECTION 1:30 X
26 19 SD-PC-S-02E_1 PC16 FOUNDATION DETAIL & SECTION 1:30 X
27 20 SD-PC-S-02F PC18 FOUNDATION DETAIL & SECTION 1:50 X
28 21 SD-PC-S-02F_1 PC20 FOUNDATION DETAIL & SECTION 1:50 X
29 22 SD-PC-S-02K PC20A FOUNDATION DETAIL & SECTION 1:50 X
30 23 SD-PC-S-02G PC30A FOUNDATION DETAIL PLAN 1:50 X
31 24 SD-PC-S-02G_1 PC30A FOUNDATION DETAIL & SECTION 1:50 X
32 25 SD-PC-S-02A.3 TIEBEAM REINFORCEMENT DETAIL 1:20 X
33 26 SD-PC-S-02P_1 GROUND FLOOR DETAIL & SECTION 1 1:20 X
34 27 SD-PC-S-02P_2 GROUND FLOOR DETAIL & SECTION B 1:20 X

C. SD/RKG-MAJ SUB STRUCTURE UNDER GROUND -2.10


35 1 SD-PC-S-02.1 FOUNDATION UNDER GROUND PLAN (SFL. -2.10 PIT LIFT) 1:300 X
36 2 SD-PC-S-02L PL66 FOUNDATION DETAIL PLAN 1:50 X
37 3 SD-PC-S-02M PL66 FOUNDATION DETAIL SECTION 1:50 X
38 4 SD-PC-S-02L_1 PL66A FOUNDATION DETAIL PLAN 1:50 X
39 5 SD-PC-S-02M_1 PL66A FOUNDATION DETAIL SECTION 1:50 X
40 6 SD-PC-S-02N PL54 FOUNDATION DETAIL 1:50 X
41 7 SD-PC-S-02O PL54 FOUNDATION DETAIL SECTION 1:50 X
42 8 SD-PC-S-02Q PL80 FOUNDATION DETAIL 1:50 X
43 9 SD-PC-S-02Q_1 PL80 FOUNDATION DETAIL SECTION 1:50 X

D. SD/RKG-MAJ SUB STRUCTURE UNDER GROUND -3.20 & -5.30


44 1 SD-PC-S-02 FOUNDATION UNDER GROUND PLAN (SFL. -5.30 & -3.20 STP/GWT) 1:300 X
45 2 SD-PC-S-02.0A FOUNDATION UNDER GROUND PLAN (SFL. -5.30 STP) 1:150 X
46 3 SD-PC-S-02A_1.1 PC1 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) 1:150 X
47 4 SD-PC-S-02A_1.2 PC2 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) 1:150 X
48 5 SD-PC-S-02A_1.3 PC3 FOUNDATION DETAIL & SECTION ( SFL.-5.30 STP ) 1:150 X

49 1 SD-PC-S-02.0B FOUNDATION UNDER GROUND PLAN (SFL.-3.20 GWT) 1:100 X


50 2 SD-PC-S-02.0B.1 FOUNDATION UNDER GROUND SECTION (SFL.-3.20 GWT) 1:150 X
51 3 SD-PC-S-02A_2.3 PC3 SECTION DETAIL UNDER GROUND (SFL.-3.20 GWT) 1:150 X
52 4 SD-PC-S-02A.3_1 TIEBEAM REINFORCEMENT DETAIL UNDER GROUND (SFL.-3.20 GWT) 1:20 X

E. SD/RKG-MAJ STRUCTURE COLUMN


53 1 SD-CL-S-03 COLUMN PLAN 1:150 X
54 2 SD-CL-S-03_1 COLUMN PLAN PARSIAL 1 1:150 X
55 3 SD-CL-S-03_2 COLUMN PLAN PARSIAL 2 1:150 X
56 4 SD-CL-S-03_3 COLUMN PLAN PARSIAL 3 1:150 X
57 5 SD-CL-S-03_4 COLUMN PLAN PARSIAL 4 1:150 X
58 6 SD-CL-S-03A COLUMN DETAIL & SECTION C1 #1 1:50 X
59 7 SD-CL-S-03A_1 COLUMN DETAIL & SECTION C1 #2 1:50 X
60 8 SD-CL-S-03A_2 COLUMN DETAIL & SECTION C2 #1 1:50 X
61 9 SD-CL-S-03A_3 COLUMN DETAIL & SECTION C2 #2 1:50 X
62 10 SD-CL-S-03A_4 COLUMN DETAIL & SECTION C3 #1 1:50 X
63 11 SD-CL-S-03A_5 COLUMN DETAIL & SECTION C3 #2 1:50 X
64 12 SD-CL-S-03D_1 COLUMN DETAIL & SECTION C4 1:50 X
65 13 SD-CL-S-03D_2 COLUMN DETAIL & SECTION CSG 1:50 X
66 14 SD-CL-S-03D_3 COLUMN DETAIL & SECTION C4S 1:50 X
67 15 SD-CL-S-03D_4 COLUMN DETAIL & SECTION C44 1:50 X
68 16 SD-CL-S-03E_1 COLUMN DETAIL & SECTION C4F 1:50 X
69 17 SD-CL-S-03E_2 COLUMN DETAIL & SECTION C6 #1 1:50 X
70 18 SD-CL-S-03E_3 COLUMN DETAIL & SECTION C6 #2 1:50 X
71 19 SD-CL-S-03E_4 COLUMN DETAIL & SECTION C9 1:50 X
72 20 SD-CL-S-03F COREWALL REINFORCEMENT DETAIL ( CW 1 ) 1:50 X
73 21 SD-CL-S-03G COREWALL REINFORCEMENT DETAIL ( CW 2 ) 1:50 X
74 22 SD-CL-S-03G_1 COREWALL REINFORCEMENT TABEL ( CW 1, & CW 2 ) 1:50 X
75 23 SD-CL-S-03B COLUMN PLAN TYPICAL 1:1300 X
76 24 SD-CL-S-03B.1 COLUMN PLAN TYPICAL PARSIAL 1 & 2 1:150 X
77 25 SD-CL-S-03B.2 COLUMN PLAN TYPICAL PARSIAL 3 1:150 X

F. SD/RKG-MAJ STRUCTURE GROUND FLOOR (SFL. -0.05)


78 1 SD-GF-S-02.3 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) 1:300 X
79 2 SD-GF-S-02.3_1 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 1 1:150 X
80 3 SD-GF-S-02.3_2 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 2 1:150 X
81 4 SD-GF-S-02.3_3 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 3 1:150 X
82 5 SD-GF-S-02.3_4 BEAM & SLAB GROUND FLOOR PLAN (SFL. -0.05) PART 4 1:150 X
83 6 SD-SG-S-50 SECTION GRID 3 1:130 X
84 7 SD-SG-S-50_1 SECTION DETAIL GRID 3 1:50 X
85 8 SD-SG-S-52 SECTION GRID 8 1:130 X
86 9 SD-SG-S-52_1 SECTION DETAIL SECTION - B 1:50 X
6
PT. REKAGUNATEK PERSADA
NO.L STATUS
NO DRAWING NO. TITLE DRAWING SCALE PIC NOTE
B FINISH REV NONE
87 10 SD-SG-S-52_2 SECTION DETAIL SECTION - B 1:50 X
88 11 SD-BL-S-02A BEAM REINFORCEMENT DETAIL & SECTION 1:20 X
89 12 SD-BL-S-02A_1 BEAM REINFORCEMENT DETAIL & SECTION 1:20 X

G. SD/RKG-MAJ STRUCTURE 1st PARKING FLOOR (SFL. +3.45)


90 1 SD-BP-S-04 BEAM & PLAT 1st PARKING FLOOR PLAN 1:300 X
91 2 SD-BP-S-04_1 BEAM & PLAT 1st PARKING FLOOR PLAN #1 1:150 X
92 3 SD-BP-S-04_2 BEAM & PLAT 1st PARKING FLOOR PLAN #2 1:150 X
93 4 SD-BP-S-04_3 BEAM & PLAT 1st PARKING FLOOR PLAN #3 1:150 X
94 5 SD-BP-S-04_4 BEAM & PLAT 1st PARKING FLOOR PLAN #4 1:150 X
95 6 SD-BP-S-50.1_1 SECTION GRID 2 & DETAIL 1st PARKING FLOOR 1:125 X
96 7 SD-BP-S-50.1_2 SECTION GRID 4-5 & 11-12 1st PARKING FLOOR 1:125 X
97 8 SD-BP-S-50.1_3 SECTION GRID 21-22 & 27-28 1st PARKING FLOOR 1:125 X
98 9 SD-BP-S-50.1_4 SECTION GRID E-F & K-L 1st PARKING FLOOR 1:125 X
99 10 SD-BP-S - 40A BEAM REINFORCEMENT 1st PARKING FLOOR #1 1:20 X
100 11 SD-BP-S - 40B BEAM REINFORCEMENT 1st PARKING FLOOR #2 1:20 X
101 12 SD-BP-S - 40C BEAM REINFORCEMENT 1st PARKING FLOOR #3 1:20 X
102 13 SD-BP-S - 40D BEAM REINFORCEMENT 1st PARKING FLOOR #4 1:20 X
103 14 SD-BP-S - 40E BEAM REINFORCEMENT 1st PARKING FLOOR #5 1:20 X
104 15 SD-P1-S - 41 SLAB REINFORCEMENT PLAN 1st PARKING FLOOR D1 1:50 X
105 16 SD-P1-S - 41_1 SLAB REINFORCEMENT SECTION 1:20 X
106 17 SD-P1-S - 41A SLAB REINFORCEMENT PLAN 1st PARKING FLOOR D2 1:50 X
107 18 SD-P1-S - 41A_1 SLAB REINFORCEMENT SECTION 1:20 X

H. SD/RKG-MAJ BEAMS & SLAB 2nd PARKING FLOOR PLAN ( SL+6,95 )


1 SD-BP-S-05 1:300 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X

I. SD/RKG-MAJ BEAMS & SLAB 3rd PARKING FLOOR PLAN ( SL.+10,45 )


1 SD-BP-S-06 1:300 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X

J. SD/RKG-MAJ BEAMS & SLAB 1st FLOOR PLAN ( SL.+13,95 )


1 SD-BP-S-07 1:300 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X

K. SD/RKG-MAJ STRUCTURE FIRE STAIR DETAIL


108 1 SD-FS-S - 43A FIRE STAIR TG1 PASENGER PLAN 1:50 X
109 2 SD-FS-S - 43A_1 FIRE STAIR TG1 PASENGER SECTION 1:50 X
110 3 SD-FS-S - 43A_2 FIRE STAIR TG1 BEAM REINFORCEMENT DETAIL 1:50 X

111 1 SD-FS-S - 43B FIRE STAIR TG2 PASENGER PLAN 1:50 X


112 2 SD-FS-S - 43B_1 FIRE STAIR TG2 PASENGER SECTION 1:50 X
113 3 SD-FS-S - 43B_2 FIRE STAIR TG2 BEAM REINFORCEMENT DETAIL 1:50 X

114 1 SD-FS-S - 43C FIRE STAIR TG3 PASENGER PLAN 1:50 X


115 2 SD-FS-S - 43C_1 FIRE STAIR TG3 PASENGER SECTION 1:50 X
116 3 SD-FS-S - 43C_2 FIRE STAIR TG3 BEAM REINFORCEMENT DETAIL 1:50 X

117 1 SD-FS-S - 43D FIRE STAIR TG4 PASENGER PLAN 1:50 X


118 2 SD-FS-S - 43D_1 FIRE STAIR TG4 PASENGER SECTION 1:50 X
119 3 SD-FS-S - 43D_2 FIRE STAIR TG4 BEAM REINFORCEMENT DETAIL 1:50 X

L. SD/RKG-MAJ STRUCTURE RAMP DETAIL


114 1 SD-RAM-S - 44 RAMP PLAN GROUND FLOOR & 1st PARKING FLOOR 1:50 X
115 2 SD-RAM-S - 44_1 RAMP PLAN 2nd & 3rd PARKING FLOOR 1:50 X
116 3 SD-RAM-S - 44_2 RAMP SECTION 1 1:80 X
117 4 SD-RAM-S - 44_3 RAMP SECTION 2 1:50 X
118 5 SD-RAM-S - 44_4 RAMP DETAIL 1:20,1:5 X
119 6 SD-RAM-S - 44_5 RAMP DETAIL BEAMS REINFORCEMENT 1:25 X

M. SD/RKG-MAJ STRUCTURE SWIMMING POOL


116 1 SD-SP-S - 43 SWIMMING POOL PLAN 1:50 X
117 2 SD-SP-S - 43_1 SWIMMING POOL SECTION & DETAIL 1:50 X

7
PT. REKAGUNATEK PERSADA
NO.L STATUS
NO DRAWING NO. TITLE DRAWING SCALE PIC NOTE
B FINISH REV NONE

N. SD/RKG-MAJ STRUCTURE STP DETAIL


118 1 SD-STP-S-46 FOUNDATION & SERVICE FLOOR PLAN 1:180 X
119 2 SD-STP-S-46_1 STP FOUNDATION FLOOR PLAN 1:100 X
116 3 SD-STP-S-46_2 STP SERVICE FLOOR PLAN 1:100 X
117 4 SD-STP-S-46_3 STP ROOF PLAN & STP ROOF TOP PLAN 1:180 X
118 5 SD-STP-S-46_4 STP ROOF PLAN ( PARSIAL ) 1:100 X
119 6 SD-STP-S-46_5 STP ROOF TOP PLAN ( PARSIAL ) 1:100 X
120 7 SD-STP-S-46A POTONGAN 1 & POTONGAN 2 STP 1:180 X
121 8 SD-STP-S-46A_1 SECTION 1 STP PARSIAL 1:100 X
122 9 SD-STP-S-46A_2 SECTION 2 STP PARSIAL 1:100 X
123 10 SD-STP-S-46A_3 SECTION 3~5 STP 1:100 X
124 11 SD-STP-S-46A_4 SECTION DETAIL STP 1:20 X
125 12 SD-STP-S-46A_5 BEAM REINFORSEMEN STP 1:20 X

O. SD/RKG-MAJ STRUCTURE GWT DETAIL


126 1 SD-GWT-S-47 GWT FOUNDATION PLAN ( SFL. -3.20 ) 1:100 X
127 2 SD-GWT-S-47_1 GWT ROOF PLAN (SFL. -0.05 ) 1:100 X
128 3 SD-GWT-S-47_2 GWT SECTION 1:100 X
129 4 SD-GWT-S-47_3 GWT SECTION 1:100 X
130 5 SD-GWT-S-47_3A GWT SECTION DETAIL 1:20 X
131 6 SD-GWT-S-47_4 GWT SECTION DETAIL 1:20 X
132 7 SD-GWT-S-02A.3_2 TIEBEAM DETAIL GWT (SFL. -0.05 ) 1:20 X

P. SD/RKG-MAJ STRUCTURE FIRE TANK DETAIL


133 1 SD-FF-S-02 WALL DETAIL FIRE TANK PLAN EL.-2.100 1:50 X
134 2 SD-FF-S-02_1 WALL DETAIL FIRE TANK PLAN EL.-0.50 1:50 X
135 3 SD-FF-S-02_2 WALL DETAIL FIRE TANK PLAN EL.+3.450 1:50 X
136 4 SD-FF-S-02_3 FIRE TANK WALL DETAIL SECTION 1 1:50 X
137 5 SD-FF-S-02_4 FIRE TANK WALL DETAIL SECTION 2 1:50 X
138 6 SD-FF-S-02_5 FIRE TANK WALL TYPE DETAIL 1:25 X

CATATAN:
A/B = Approved / Approved as noted 134 62 0
C = Re - submit 196
E = Rejected / Refused 68.37% 31.63% 0.00%
= Submit