You are on page 1of 1

PLANT NORTH

GEOGRAPHIC
N FOUNDATION CONCRETE QUANTITY
NORTH 0°
22.377°
F/W DETAILS OF FNJ001 DETAILS OF RFJ001 MATERIAL TOTAL QUANTITY [Cu. M]
PREVALING
SUMMER WIND (SCALE: 1 : 25) (SCALE: 1 : 25) FOUNDATI ON CONCRETE 5.75
S/W

270° 90°

1130-SS002I
2300
1130-SS002I
GROUTING QUANTITY
PREVALING 1 2
WINTER WIND
S/E
180° MATERIAL TOTAL QUANTITY [Cu. M]
2200 GROUT 0.02
500 450 1300 450
500
MK2-17Ø16@200(B)
450 450 MK2-17Ø16@200(T)
= = = = FOUNDATIONS TYPE SCHEDULE
1000 ITEM TAG
1130-SS002I -FN001A
F/W TYPE
FNJ001
R/F TYPE
RFJ001

850
NOTES

OF PED.
1130-SS002I

1 1 3 3
FOUNDATIONS F/W-R/F TYPES

= =
450
1) ALL DIMENSIONS ARE IN MILLIMETERS, ELEVATIONS & CO-ORDINATES ARE IN METERS.
B

- - - - F/W TYPE R/F TYPE QUANTITY


2) EL.100.000 = +23.00m ABOVE AVERAGE BALTIC SEA LEVEL IS REFERRED TO THE H.P.P (High Point Paving)
FNJ001 RFJ001 1
ABJ001 ABJ001 3) FOR GENERAL NOTES FOR CONCRETE WORKS REFER DWG. NO. 4124-AA-DX-200000001

3500 MK1-12Ø16@200(B) 4) BAR BENDING SCHEDULE IS INDICATIVE CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING

E = 117.140
REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.
3200

1500

MK1-12Ø16@200(T)
ANCHOR BOLTS LAYOUT SCHEDULE
ANCHOR BOLTS LAYOUT TYPE QUANTITY NO. OF BOLTS
ABJ001 4 16

OF PED.
1130-SS002I

1 N = 105.900 1
= =
450
A

3 3
- - - - ANCHOR BOLTS QUANTITY
ABJ001 ABJ001 DIA. OF ANCHOR BOLTS NO. OF ANCHOR BOLTS BOLT LENGTH [mm]
850

M16 16 440
1000
FN-001A
FNJ001 OF PED. OF PED.
RFJ001
PRICE CODE
LIMITED SECTION EXCAVATION ABA02AC01/02/03
BACKFILLING FROM EXCAVATED MATERIAL & BORROW PIT ACA05AM01
VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB01
LEAN CONCRETE ADA08AA01
WATER PROOFING BY BITUMEN PAINT ADA16AA01
FORMWORK FOR FOUNDATION ADA09AA01
SECTION 1 SECTION 3 FOUNDATION CONCRETE ADA08AB03
(SCALE: 1 : 25) - (SCALE: 1 : 25) - UPDATE SUPPLY AND INSTALLATION OF STEEL REBARS
NON-SHRINK GROUT
ADA10AA03
ADA12AB01
SUPPLY AND INSTALLATION OF ANCHOR BOLTS ADA11AA01/ADA11EA01
AUTHORIZED FOR CONSTRUCTION
Утверждено для строительства

MK5-3Ø10@75

MK5-3Ø10@75
MK4-3Ø10@75

MK5-3Ø10@75

MK5-3Ø10@75
MK4-3Ø10@75
Date/Дата: 26-10-2021 Signature/Подпись: C.Boldrini

BAR BENDING SCHEDULE - REINFORCEMENT TYPE RFJ001

(TYP.)
75
100.250 TOC
5 5 BAR MARK QUANTITY BAR DI AMETER [mm] BAR LENGTH [mm] TOTAL BAR LENGTH [mm] a b c d e g SHAPE TOTAL WEIGHT [ Kg]
100.000 HPP - - MK1 24 16 3635 87240 0 300 3100 300 0 0 137.84

(TYP.)
200
99.800 FGL
MK2 34 16 2635 89590 0 300 2100 300 0 0 141.55

MK3 32 16 3385 108320 0 3120 300 0 0 0 171.15

1750 4 4 MK4 72 10 1515 109080 90 350 350 350 350 90 67.63


99.100 PTS - -

MK4-13Ø10@200

MK5-13Ø10@200
MK5-13Ø10@200
MK4-13Ø10@200
MK5-13Ø10@200
MK5-13Ø10@200

MK3 MK3 MK5 128 10 510 65280 90 350 0 0 0 90 40.47


2750

290 459510 558.64


3250

2250 REINFORCEMENT QUANTITY REFERENCE DRAWINGS


BAR DI AMETER [mm] UNIT WEIGHT [ Kg/m] TOTAL BAR LENGTH [mm] TOTAL WEIGHT [ Kg] 4124-XX-DE-211300001 EQUIPMENT LAYOUT AMMONIA PROCESS AND UTILITIES PLANT, AMMONIA SYNTHESIS
10 0.62 174360 108.10 AND REFRIGERATION/PURIFICATION AREA, PLAN AT EL. 100.000 AND ABOVE
16 1.58 285150 450.54 4124-AA-DA-211300001S02 CONCRETE DRAWING PLANT 1, AREA 2.1.1.30 (PART 2) PILE LAYOUT
459510 558.64
(TYP.)

4124-AA-DA-210000001S00 KEY PLAN PILES AND FOUNDATION LAYOUT PLANT 1 AMMONIA


50

98.00 4124-AA-DX-200000001 CONCRETE WORKS GENERAL NOTES FOR CONCRETE WORKS

4124-AA-DX-200000002 STANDARD DETAIL OF ANCHOR BOLTS


500

4124-AI-DU-21130I002S01 SECONDARY STRUCTURE 1130-SS002I - PLANS, ELEVATION & SECTIONS


97.000 BOF
MK4-2Ø10 MK2 (T&B) MK4-2Ø10
LEAN CONCRETE CONSTRUCTION JOINT MK1 (T&B)

DETAILS OF ABJ001 SECTION 4


CHECKED BY KEYPLAN
-
(SCALE: 1 : 25) (SCALE: 1 : 25)
AMIT BAGCHI
350
= =
OF PED.
DATED
100
= = MK3-1Ø16 MK3-1Ø16 26-10-2021
OF PED.

MK3-3Ø16

MK3-3Ø16
MK3-3Ø16
MK3-3Ø16

2 2 MK5 MK4
U
P

U
P 1 9
3
5
0
P
U
= =

= =
250

100

- -
P
U

MK4 MK5
P
U

MK5
U
P

MK5
U
P

AB-G 09Г2С-6-2a-M16-120-320
MK3-1Ø16 MK3-1Ø16

R
A
A Y
T

L
B
E
CL
P
U

D
S D
S N
D D
S D
S D
S

B L
O
U
E
L I
L

D
S D
S D
S D
S
D
S

U P

U P

A R
I P R E
HET
A
R

1
-10
8
-J

SECONDARY STRUCTURE
1130-SS002I

SECTION 2 SECTION 5
(SCALE: 1 : 25) - (SCALE: 1 : 25) -

P.Nair/
MK3 MK3 01 ISSUED FOR CONSTRUCTION 26-Oct.-2021 S.Parulekar D.Pushkar G.Girardi
50 THK. CEMENT BASED REV
DESCRIPTION -ОПИСАНИЕ
DATA PREPARED CHECKED APPROVED
P= 120

NON-SHRINK GROUT РЕД. ДАТА ПОДГОТОВИЛ ПРОВЕРИЛ УТВЕРДИЛ


MK3-3Ø16

MK3-3Ø16

(TYP.) MK5 MK5


MK3

MK3

100.250 TOC MK4 MK4

MK5 MK5 Tecnimont


MK3 MK3 This copy of this document is LLC Eurochem Northwest-2's property and its copyright is vested in Tecnimont Spa. This document contains confidential information and cannot be copied to or used
by any party for any purpose without Tecnimont’s Spa and LLC Eurochem Northwest-2’s prior written consent. Additional restrictions are as stated in the above confidentiality and export label, if any.

Настоящая копия документа является собственностью OOО "ЕвроХим-Северо-Запад-2”, и авторские права на него закреплены за АО «Текнимонт». Данный документ содержит

Isometric View конфиденциальную информацию и не может копироваться или использоваться никакой другой стороной ни для каких целей без предварительного письменного согласия АО
«Текнимонт» и OOО "ЕвроХим-Северо-Запад-2”. Возможные дополнительные ограничения указаны выше в метке конфиденциальности.

TCM DOCUMENT No.: DOCUMENT No:


Текнимонт номер документа 4124-AA-DC-21130I002S01 ДОКУМЕНТ №:

- - - - - - OWNER:
LLC EUROCHEM NORTHWEST - 2

MODEL NAME: 4124-AA3D-1130-SS002I


ВЛАДЕЛЕЦ:
- - - - - -
- - - - - - PROJECT:
ПРОЕКТ:
- - - - - - Ammonia and Urea Production, Kingisepp.
Изм.N Кол.уч. N Докум Лист Подпись Дата
REV. Num. count Doc. No Sheet Sign Date
Разработал ORIG. - - - - PLANT: Стадия Phase Лист Sheet Листов of
УСТАНОВКА: 3000 MTPD Ammonia
Проверил CHKD. - - - - LOCATION:
РАСПОЛОЖЕНИЕ:
Kingisepp - Russian Federation P 01 01
Утвердил APPR. - - - -
TITLE: SCALE:
НАИМЕНОВАНИЕ:
CONCRETE DRAWING МАСШТАБ:

A0 SHEET
F/W & R/F DETAIL OF FOUNDATION
FOR SECONDARY STRUCTURE 1130-SS002I 1:100