Professional Documents
Culture Documents
4124 Aa DC 21110L106S01 Is02 - Checkprint
4124 Aa DC 21110L106S01 Is02 - Checkprint
GEOGRAPHIC
N
NORTH 0°
PREVALING
22.377°
FOUNDATION PLAN DETAIL OF ABJ001 R/F DETAILS OF PFJ001
SUMMER WIND
S/W
(SCALE: 1 : 50) (SCALE: 1 : 25) (SCALE: 1 : 50)
PAVING CONCRETE QUANTITY
270° 90°
MATERIAL TOTAL QUANTITY [Cu. M]
1 PAVING CONCRETE 13.22
- 5 3 02
4
PREVALING
WINTER WIND 180° - - -
S/E
OF FDN. FOR 11-106-L,11-107-L & 11-108-L FOUNDATION CONCRETE QUANTITY
300 3550 300 300 02 MATERIAL TOTAL QUANTITY [Cu. M]
== == MK8-1Ø16 FOUNDATION CONCRETE 6.47
150
500 2550 500 MK7-1Ø16 02
== MK3-57Ø16@200(B)
400 == 400 02 AB-G 09Г2С-6-2a-M20
175
2-135-400
300
== ==
GROUTING QUANTITY
E = 208.300
MATERIAL TOTAL QUANTITY [Cu. M] NOTES
500
300
==
==
1000
FP-002A FP-003A GROUT 0.20
FPJ002 FPJ002
RFJ001 RFJ001 02
1785
600 ABJ001 ABJ001 N = 176.280 1110-SS006I 1) ALL DIMENSIONS ARE IN MILLIMETERS, ELEVATIONS & CO-ORDINATES ARE IN METERS.
600
==
==
MK11-19Ø16@200(B) 2) EL.100.000 = +23.00m ABOVE AVERAGE BALTIC SEA LEVEL IS REFERRED TO THE H.P.P (High Point Paving)
FOUNDATIONS TYPE SCHEDULE
MK10-2Ø12(S/F)
SECTION 5
300 25
3) FOR GENERAL NOTES FOR CONCRETE WORKS REFER DWG. NO. 4124-AA-DX-200000001
4 5 (SCALE: 1 : 25) - ITEM TAG F/W TYPE R/F TYPE
- - 1110-EQ106L-PF001A PFJ001 RPJ001 4) BAR BENDING SCHEDULE IS INDICATIVE .CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING
REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.
25 300 300 25
1655
MK14-3Ø10@75
MK15-3Ø10@75
MK16-3Ø10@75
1275 1275 ?????
SECTION 4 FOUNDATIONS F/W-R/F TYPES
(SCALE: 1 : 25) - MK12 SQUAD CHECK
Fouling with funnel pipes
1050
==
F/W TYPE R/F TYPE QUANTITY
PFJ001 RPJ001 1 Project # 4124 Kingisepp 2 Ammonia Plant & Urea Plant
6 6
MK13
- - Origination Dept. : Civil PRASEETHA NAIR
P= 135
02 1110-EQ106L-FP001A 2550x9050 FPJ001 RPJ001 Pip Sreekath Peringadoor 27-12-2021
MK1-2Ø10@150STIRRUPS
11135
1050 (LAP)(TYP.)
N = 170.970
2 2 02 Elec Milind Dalvi 27-12-2021
100.000 HPP
- - PEDESTAL F/W-R/F TYPES
9050
==
==
OF FDN. FOR 11-106-L,11-107-L & 11-108-L
Inst Siddhamally Sridhar -
F/W TYPE R/F TYPE QUANTITY Build. Amod Karnik -
MK5-1Ø16
FPJ001 RPJ001 1
MK5-1Ø16 MK6-1Ø16
FPJ002 RFJ001 2 Preng Hemant Thorat -
4525
LIMITED SECTION EXCAVATION ABA02AC01/02/03
2-16 DIA Util. Sunita Das
MK1-19Ø16@200(B) MK13-2Ø12 BACKFILLING FROM EXCAVATED MATERIAL ACA05AM01
Syspa Ganesh Mohite -
3-16 VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB01
MK12-3Ø12
MK2-13Ø16@200(T)
FP-001A DIA MK14
PAVING CONCRETE AEA08AG01 UG Amit Maheshwari
FPJ001 MK15
RPJ001 WATER PROOFING BY BITUMEN PAINT ADA16AA01
PF-001A MK16 FORMWORK FOR FOUNDATION ADA09AA01
PFJ001
RPJ001 FOUNDATION CONCRETE ADA08AB03
25 300
02
REINFORCED CONCRETE PAVING AEA08AG01
300
DS MK7-1Ø16 MK10-2Ø12(S/F)
MK8-1Ø16
1 3
- -
SECTION 1 SECTION 2
(SCALE: 1 : 50) - (SCALE: 1 : 25) -
REFERENCE DRAWINGS
EQUIPMENT LAYOUT AMMONIA PROCESS AND UTILITIES PLANT
4124-XX-DE-211200001
DEAERATOR UNIT, BFW PUMPS, FEED WATER UNIT , PLAN AT EL. 100.000 TO EL. 108.000
CONCRETE DRAWING PLANT 1, AREA 2.1.1.50 PART 1 CO2
MK2 4124-AA-DA-211500001S01 RECOVERY AREA PILE LAYOUT
25 THK. CEMENT BASED KEY PLAN PILES AND FOUNDATION LAYOUT PLANT 1 AMMONIA
4124-AA-DA-210000001S00
NON SHRINK GROUT MK4
MK9
MK9
TO POURED AFTER
4124-AA-DX-200000001 CONCRETE WORKS GENERAL NOTES FOR CONCRETE WORKS
FINAL ERRECTION 02
UNLESS OTHERWISE NOTED
4124-AA-DX-200000002 STANDARD DETAIL OF ANCHOR BOLTS
MK5 MK5
1 300 MK9-2Ø12
MK9-2Ø12 MK3
1 300 (TYP.) 02
PROVIDE BASE SIMILAR TO BASE OF PAVING
(TYP.) (REFER 4124-AP-DC-200000000S01)
SECTION 3
(SCALE: 1 : 25) -
MK4
KEYPLAN
MK10
MK2
MK2
MK10
02
MK8
MK8
MK7
MK7 300 MK10-2Ø12
UP
UP
UP
19350
UP
MK3
UP
UP
CABLETRAY
L
UP
DS DS DS DS
DS
DN
LUBEOI L
L
UP
UP
BAR MARK QUANTITY BAR DIAMETER [mm] BAR LENGTH [mm] TOTAL BAR LENGTH [mm] a b c d e g SHAPE TOTAL WEIGHT [Kg] 11-10
8-J
AI R P R EH E A T E R
MK2 26 16 5860 152360 0 4985 640 300 0 0 240.73 FDN. FOR 11-106-L,
11-107-L & 11-108-L
02
02 02
MK3 57 02 16 5100 290700 0 300 495 3540 495 0 459.31
MK12 6 12 2205 13230 300 615 475 615 300 0 11.77 TCM DOCUMENT No.: DOCUMENT No:
Текнимонт номер документа 4124-AA-DC-21110L106S01 ДОКУМЕНТ №:
- - - - - - OWNER:
LLC EUROCHEM NORTHWEST - 2
- - - - - - PROJECT:
ПРОЕКТ:
MK14 6 10 1715 10290 90 300 500 300 500 90 6.38 02 - - - - - - Ammonia and Urea Production, Kingisepp.
Изм.N Кол.уч. N Докум Лист Подпись Дата
REV. Num. count Doc. No Sheet Sign Date
Разработал ORIG. - - - - PLANT: Стадия Phase Лист Sheet Листов of
MK15 6 10 1115 6690 90 300 200 300 200 90 4.15 УСТАНОВКА: 3000 MTPD Ammonia
Проверил CHKD. - - - - LOCATION:
РАСПОЛОЖЕНИЕ:
Kingisepp - Russian Federation P 01 01
Утвердил APPR. - - - -
MK16 6 10 660 3960 90 500 0 0 0 90 2.46 TITLE: SCALE:
НАИМЕНОВАНИЕ:
CONCRETE DRAWING МАСШТАБ:
A0 SHEET
219 1101120 1633.51 F/W & R/F DETAILS OF FOUNDATION & BBS FOR EQPT. 11-106-L,
11-107-L & 11-108-L (1110-EQ106L), SECONDARY STR. 1110-SS006I 1:100
02