❑Background
✓ PT Jhonlin Baratama Site Sungai Dua Batulicin South Borneo plan to increasce it’s unit population due to
Increasing Production Target from 13.041.141,50 MT Coal and 19.567.590,61 BCM OB (SR 1,823) to 16.710.298
MT Coal & 30.464.764 BCM OB (SR 1,50) in Sungai Dua Site by Early 2023.
❑Objective
1. Survey field actual condition, material & Working Condition Actual On site
2. To measure actual bearing capacity based on material types to recommended optimum unit used.
3. Dynamic Cone Pnetration Test Actual on site.
UNITED TRACTORS
The solution driven company
Bengkirai Colors : 70
CBR (%)
(36 m )
S3° 16.174' E116°
Grey 50
40
00.969' HD1500
30
20 HD 785
01 September 2022 PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800 900 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 2
LOCATION MATERIAL PICTURES RESULT UNIT
Bengkirai Colors : 70
Coordinate (GPS 06) : Brown & Dark 60
CBR (%)
(35 m )
S3° 16.179' E116°
Grey 50
00.990' 40
HD1500
30
01 September 2022
20 HD 785
PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800
Depth (mm)
Legend :
HD1500-8 Highly Effective
HD785-7 Well Suited
Not Effective Need Compacting
HD465-7 Unsuitable (Not Recommended)
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 3
LOCATION MATERIAL PICTURES RESULT UNIT
Bengkirai Colors : 70
CBR (%)
(29 m )
S3° 16.307' E116°
Grey 50
40
00.974'
HD1500
30
01 September 2022
20 HD 785
PC3400
10
HD465-7
0
0 100 200 300 400 500 600 700 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
Not Effective Need Compacting
HD785-7 Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 4
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
(17 m)
50
S3° 16.198' E116°
01.029' 40 HD1500
30
01 September 2022 20
HD 785
PC3400
10 HD465-7
0
0 100 200 300 400 500 600
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 5
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60,00
(20 m) 50,00
S3° 16.174' E116° 40,00 HD1500
01.024' 30,00
HD 785
01 September 2022 20,00
PC3400
10,00
HD465-7
0,00
0 100 200 300 400 500 600 700 800 900
Depth (mm)
Legend :
HD1500-8 Highly Effective
Well Suited
HD785-7 Not Effective Need Compacting
HD465-7 Unsuitable (Not Recommended)
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 6
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 11) : Grey 60
(19 m) 50
S3° 16.415' E116° 40 HD1500
01.115' 30
HD 785
01 September 2022 20 PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
Not Effective Need Compacting
HD785-7 Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 7
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 12) : 60
(19 m ) 50
S3° 16.422' E116° 40 HD1500
01.122' 30
HD 785
01 September 2022 20
PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800 900
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 8
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
01.782' 60
50
40 HD1500
01 September 2022 30
HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 9
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
01.781' 40
HD1500
30
01 September 2022 HD 785
20
PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 10
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
120
100
01 September 2022 80
60
HD1500
40
HD 785
20 PC3400
0 HD465-7
0 100 200 300 400 500 600 700
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 11
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 17) : Grey 100
90
(10 m) 80
S3° 15.813' E116° 70
60
00.905' 50
40 HD1500
01 September 2022 30 HD 785
20 PC3400
10
0
HD465-7
0 100 200 300 400 500 600
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 12
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 18) : 60
(20 m) 50
S3° 15.830' E116° 40 HD1500
00.910' 30
20 HD 785
01 September 2022 PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 13
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
(12 m)
S3° 15.834' E116° 50
00.915' 40 HD1500
30
01 September 2022 HD 785
20 PC3400
10 HD465-7
0
-100 100 300 500 700 900
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 14
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
S3° 15.903' E116°
50
01.319'
40 HD1500
01 September 2022 30
HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 15
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
90
01.534' 80
70
60
01 September 2022 50
HD1500
40
30 HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 16
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
S3° 18.372' E116°
50
01.892'
40 HD1500
01 September 2022 30
HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 17
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
01.892' Colors : 60
50
Dark Grey 40 HD1500
02 September 2022 30
HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 18
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
50
02 September 2022 40 HD1500
30
HD 785
20 PC3400
10 HD465-7
0
0 100 200 300 400 500 600
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 19
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
S3° 18.293' E116°
01.922' Split 50
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 20
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 34) : Grey 60
(44 m) 50
S3° 15.969' E116° 40 HD1500
00.842' 30
HD 785
06 September 2022 20
PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 21
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
Coordinate (GPS 35) : Grey 50
(42 m)
40 HD1500
S3° 15.969' E116°
30
00.837' HD 785
20
06 September 2022 PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 22
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
Coordinate (GPS 36) : 60
(45 m) 50
S3° 15.961' E116° 40 HD1500
00.824' 30
20 HD 785
06 September 2022 PC3400
10
HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 23
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
S3° 15.958' E116° 60
00.808' 50
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 24
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
S3° 15.946' E116° 60
00.831' 50
40 HD1500
06 September 2022
30
HD 785
20 PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700 800
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 25
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
S3° 15.939' E116° 60
00.828' 50
40 HD1500
06 September 2022
30
HD 785
20 PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 26
LOCATION MATERIAL PICTURES RESULT UNIT
90
Pit Trambesi Blok 21 Colors :
80
Coordinate (GPS 41) : Brown & Dark
(21 m) 70
Grey
CBR (%)
S3° 15.873' E116° 60
00.964' 50
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 27
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
S3° 15.718' E116°
Dark Grey 60
50
00.705'
40 HD1500
07 September 2022 30
HD 785
20 PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 28
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
(14 m)
50
S3° 15.723' E116°
40 HD1500
00.707'
30
07 September 2022 20
HD 785
PC3400
10 HD465-7
0
0 200 400 600 800 1000
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 29
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
(33 m) 60
S3° 15.855' E116°
White & Dark 50
00.799' Grey 40 HD1500
30
07 September 2022 20 HD 785
10
PC3400
HD465-7
0
0 100 200 300 400 500 600 700 800 900
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 30
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
S3° 15.853' E116° 60
00.793' 50
40
HD1500
07 September 2022 30
20 HD 785
PC3400
10 HD465-7
0
0 100 200 300 400 500 600 700
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
DCP TEST RESULT TITIK 31
LOCATION MATERIAL PICTURES RESULT UNIT
CBR (%)
60
01.205' 50
07 September 2022 40 HD1500
30
20
HD 785
PC3400
10 HD465-7
0
0 100 200 300 400 500 600
Depth (mm)
Legend :
Highly Effective
HD1500-8 Well Suited
HD785-7 Not Effective Need Compacting
Unsuitable (Not Recommended)
HD465-7
PC3400-11M0
IDN/PE/2022
Lokasi Mobilisasi PC3400 & HD1500-8 PT Jhonlin Baratama Site Sungai Dua Batu licin
Terkait dengan adanya plan mobilisasi unit PC3400 dan HD1500 tujuan site Jhonlin Baratama Sungai Dua Batulicin, Kalimantan Selatan. Maka dilakukanlah proses
survey lokasi jetty yang akan digunakan untuk sandar LCT dan survey kondisi jalan disekitar jetty untuk kelancaran proses mobilisasi unit PC3400 dan HD1500 sampai
ke lokasi assembly.
Survey area Jetty
Untuk plan jetty yang digunakan ada 2 tempat yang dilakukan proses survey, pertama jetty DSP Sungai Dua. Informasi dari tim customer dlapangan, jetty tersebut
sudah sering digunakan untuk proses sandar dan mobilisasi unit sekelas PC2000 dan unit HD 785.
Jetty kedua yaitu jetty Terpadu, jetty tersebut belum pernah digunakan proses sandar LCT untuk mobilisasi alat berat dengan kategori unit big class.
2. Survey kondisi jalan menuju ke lokasi Assembly
Proses dilanjutkan dengan survey kondisi jalan yang akan digunakan untuk mobilisasi unit PC3400 & HD 1500-8
Kondisi tanah di area jetty DSP khususnya di bagian bibir jetty tempat turunnya rampdoor sedikit lemah (belum pengerasan).
Proses pengecekan dibagian yang baru selesai pelebaran dan pengerasan jalan
Kondisi jalan yang masih belum dilakukan pelebaran dan pengerasan, lebar jalan 5.8m dan masih perlu pelebaran agar proses mobilisasi tidak
terhambat.
Mobilisasi Unit PC3400-11 M0 & HD1500-8 From Jety To Port DSP
PELABUHAN DUA SAMUDRA PERKASA (DSP)
Area turun nya unit dari kapal (ramp door) perlu diperbaiki & Jalan belokan keluar dari Pelabuhan perlu diperlebar untuk manuver & tinggi
diperkeras tiang listrik kurang dari 7 meter (perlu diangkat saat mobilisasi HD1500-8)
5,8 meter
Tinggi kabel kurang dari 7 meter , perlu diangkat menggunakan Area jalan dekat stok file perlu diperlebar minimum 8 meter
tools saat mobilisasi HD1500-8
MACHINES PROFILE
No Description L Overall length (mm) W Overall width (mm) H Overall height (mm) Volume (m³) W Weight (kg)
1 Center frame assembly 3700 4600 2200 37,444 25000
2 Crawler frame assembly L.H 8250 1800 2250 33,413 42000
3 Crawler frame assembly R.H 8250 1800 2250 33,413 42000
4 Superstructure platform 8300 4400 4550 166,166 4620
5 Machine house 6000 2800 4050 68,040 30000
6 L.H. platform 4000 3500 4600 64,400 2400
7 Hydraulically operated stairway 1000 1000 4700 4,700 310
8 Machine house L.H. platform 2900 1100 1650 5,264 350
9 Cab base 2300 2300 2900 15,341 3700
10 Cab base step 1 4000 1400 1400 7,840 470
11 Cab base step 2 900 1900 1350 2,309 170
12 Operator’s cab 2900 2200 2600 16,588 2400
13 Lubrication pump station 1300 750 1800 1,755 315
14 Hydraulic oil tank 1800 1800 4000 12,960 3500
15 Emergency escape ladder 3500 1500 1200 6,300 500
16 Hydraulic oil cooler assembly 2100 1800 3900 14,742 3700
17 Machine house R.H. platform 3350 850 1500 4,271 350
18 Hydraulic oil tank R.H. platform 1900 850 2000 3,230 230
19 Hydraulic oil cooler R.H. platform 2000 850 1500 2,550 200
20 Hydraulic oil cooler front platform 850 2350 1500 2,996 350
21 Boom assembly 9500 2150 2600 53,105 26700
22 Counterweight 5700 900 3650 18,725 27099
23 Stick assembly 5900 2390 2550 35,958 18700
24 Bucket assembly 3100 3900 4200 50,778 20160
EMPTY VEHICLE WEIGHT (EVW) : ± 108 TON ESTIMASI KEBUTUHAN TRAILER UNTUK MOBILISASI PC3400-11M0
GROSS VEHICLE WEIGHT (GVW) : ± 250 TON : 16 – 17 TRAILER
LEBAR JALAN MINIMUM : 8 meter
KETINGGIAN JALAN MINIMUM : 7 meter
Kendala yang ada pada sekitar jetty DSP saat proses survey lokasi sebagai berikut :
• Kondisi landasan di jetty tempat turunnya rampdoor masih perlu di timbun material perkerasan dan batu split serta butuh di compact agar
kuat menahan beban unit atau armada yg melintas keluar jetty.
• Adanya kabel listrik yang melintang didekat jetty dan area keluar jetty menuju lokasi assembly, dikhawatirkan ketika proses mobilisasi
tersangkut kabel, berikut foto dari kabel listrik yang melintang serta akses jalan menuju ke lokasi assembly perlu dilakukan pelebaran.
Kendala yang ada pada sekitar jetty terpadu saat proses survey lokasi sebagai berikut :
• Landasan tempat turun rampdoor kurang lebar dan belum pernah digunakan untuk proses unloading unit dengan kategori big class,
• Lebar jalan / lebar landasan rampdoor hanya selebar unit kelas PC200, berikut foto kondisi rampdoor di jetty terpadu.
Survey lokasi Assembly
Survey dilanjutkan ke lokasi tempat proses assembly, jarak tempuh menuju lokasi assembly dari kedua jetty tersebut kurang lebih sejauh 15-20 km.
Kesimpulan dari hasil survey Lokasi Mob PC3400 & HD1500-8 PT Jhonlin Baratama Site Sungai Dua Batu licin.
Setelah dilakukannya proses survey dan diskusi dengan tim customer dan tim Harmony dilapangan diputuskan bahwa jetty yang akan digunakan
untuk plan sandar LCT dan plan mobilisasi unitnya adalah Jetty DSP Sungai Dua. Karena jetty tersebut sudah sering di pergunakan untuk proses
sandar dan mobilisasi unit Big Class,
Legend :
Highly Effective
CBR TEST RESULTS Well Suited
Not Effective Need Compacting
Unsuitable (Not Recommended)
Contributing factors
THEORY OF COMPACTOR APPLICATION
Smooth
Pad Foot
WHY NEED COMPACTOR?
20 T Class
RECOMMENDATION
• Increase CBR To at lease to 50% CBR
• Standby road maintenance feet, consist of :
• D85 Class Dozers
• GD825 Class Motor Grader
• BW219
• Water Trucks
• Re Engineering of current road construction, Includes Of:
• Changing Burrow Material Types (Re layering)
• Drinage construction and maintenance
• Re-Grading and re-compacting
• Increasing Road Width of minimum 33 m to ensure road maintenance process
• Blasting Is Highly required to ensure excavator productivity to match with HD1500 productivity
• Recommended Maximum Hauling Road :
• Distance max : 1200 m
• Grade : 5 %
• Rolling Resistance : 4-5%
SPECIAL CASE FOR HD1500 OPERATION
Active Road Mantained Road
Drainage
Drainage
Safety
Safety
Berm
Berm
33 m
Active Road Mantained Road Active Road
Drainage
Drainage
Safety
Safety
Berm
Berm
33 m
SPECIAL CASE FOR HD1500 OPERATION
Borrow Compaction
with smooth drum
Base Compaction
with sheep foot
Insitu Material