WALLS
Brickwork under dpc to have brickforce
every 2 courses and above DPC,
brickforce every 4 courses
Provide DPC under all walls minimum
150mm above ground level and under
window sills.
External walls plastered smooth for painting
,internal walls plastered and skimmed for
painting except for bathrooms, toilets, glazed
wall tiles to owner specifications.
SLAB
100mm concete floor slab in 1:3:6 mixture
on minimum 150mm rammed fill after removal
of all loose turfant -proof treatment
underside fill and to 1500 curtilage of roof
Slab level to be minimum 200mm above natural
ground level
SOUTH ELEVATION
EAST ELEVATION 1:100
1:100
12,100
B
230
Address:
970
14 Enterprise Block
1,770
Exhibition Park
230
3,770
LOUNGE
-100mm dia g.i gutter on gutter brackets
-75mm dia rainwater downpipes fixed with
BEDROOM 2 BEDROOM 3 d.p.c. metal brackets with dripstone under
2,770
NGL
-eaves 600mm width
230
230
230
690
VERANDAH
670
230