OJT/WIP ACCOMPLISHMENT REPORT

NAME: RHOD JASPER ESPANOLA

DATE ACTIVITY

AUG. 08, 2022 FLOOR PLAN, LEFT ELEVATION, RIGHT ELEVATION,


FRONT ELEVATION, REAR ELEVATION

AUG. 09, 2022 SITE VISIT AT KIRANG (LAYOUT AND STAKING,


EXCAVATION), SITE VISIT AT BONE NORTH (ROAD
CONCRETING),
AUG. SITE VISIT AT KIRANG (EXCAVATION OF COLUMN FOOTING)
10, 2022
AUG. SITE VISIT AT KAYAPA, EXPERIENCE STEEL MAN AT
11, 2022 KIRANG SITE

AUG. 12, 2022 AUTOCAD WORKS (ELECTRICAL LAYOUT, FOUNDATION


PLAN, SEWER LAYOUT PLAN)

AUG. 13, 2022 SITE VISIT AT KAYAPA (INSTALLATION OF


PORTALIFT, INSTALLATION OF SLAB BARS)
REMARKS:

Prepared by: I hereby certify to the correctness of the above entries:

RHOD JASPER ESPANOLA ENGR. RANDY P. BANAY

STUDENT TRAINEE

NOTED:

Adviser
84
NUEVA VIZCAYA STATE UNIVERSITY

Bayombong, Nueva Vizcaya

COLLEGE OF ENGINEERING

Civil Engineering Department

ON-THE-JOB TRAINING

Midyear 2022

OJT/WIP ACCOMPLISHMENT REPORT

NAME: RHOD JASPER ESPANOLA

DATE ACTIVITY

AUG. 15, 2022 SITE VISIT AT KIRANG, AUTOCADWORKS(FLOORPLAN)

AUG. 16, 2022 AUTOCAD WORKS(ELEVATIONS)

AUG. AUTOCAD WORKS (ELECTRICAL AND PLUMBING LAYOOUTS)


17, 2022

AUG. AUTOCAD WORKS (FOUNDATION PLAN)


18, 2022
AUG. 19, 2022 AUTOCAD WORKS (PERSPECTIVE AND RENDERING)

AUG. 20, 2022 SITE VISIT KIRANG

REMARKS:

Prepared by: I hereby certify to the correctness of the above entries:

RHOD JASPER ESPANOLA ENGR. RANDY P. BANAY

STUDENT TRAINEE

NOTED:

85
Adviser

86
NUEVA VIZCAYA STATE UNIVERSITY

Bayombong, Nueva Vizcaya

COLLEGE OF ENGINEERING

Civil Engineering Department

ON-THE-JOB TRAINING

Midyear 2022

OJT/WIP ACCOMPLISHMENT REPORT

NAME: RHOD JASPER ESPANOLA

DATE ACTIVITY

AUG. 23, 2022 SITE VISIT AT KIRANG ()


SITE VISIT AT CUTAR (EXCAVATION OF COLUMN
FOOTING)
AUTOCAD WORKS (PERSPECTIVE)

AUG. 24, 2022 AUTOCAD WORKS (SKETCHUP – REVISED SECOND FLOOR)

AUG. SITE VISIT AT POBLACION, ARITAO (COMMERCIAL SOLAR


25, 2022 STREET LIGHT & CCTV)
SITE VISIT AT CUTAR (COLUMN FOOTING)
SITE VISIT AT KIRANG (PLUMBING)
AUG. SITE VISIT AT KIRANG, PUROK 1 (CHB LAYING)
26, 2022 SITE VISIT AT KIRANG, SURONG (INSTALLATION OF CO PVC
PIPES)
OFFICE WORK (AUTOCAD & SKETCHUP)

AUG. 27, 2022 SITE VISIT AT KIRANG (SLAB CONCRETE POURING)

REMARKS:

Prepared by: I hereby certify to the correctness of the above entries:

RHOD JASPER ESPANOLA ENGR. RANDY P. BANAY

STUDENT TRAINEE

NOTED:

87
Adviser
NUEVA VIZCAYA STATE UNIVERSITY

Bayombong, Nueva Vizcaya

COLLEGE OF ENGINEERING

Civil Engineering Department

ON-THE-JOB TRAINING

Midyear 2022

OJT/WIP ACCOMPLISHMENT REPORT

NAME: RHOD JASPER ESPANOLA

DATE ACTIVITY

AUG. 29, 2022 CHB LAYING (KIRANG, CUTAR)

AUG. 30, 2022 CHB LAYING


INSTALLATION OF CCTV’S (POBLACION)

AUG. OFFICE WORK (AUTOCAD)


31, 2022 ESTIMATE
SEPT. OFFICE WORK (AUTOCAD)
01, 2022 SITE VISIT (POBLACION)

SEPT. 02, 2022 CHB LAYING (KIRANG)

SEPT. 03, 2022 OFFICE WORK (AUTOCAD)


ESTIMATE THE GATE

REMARKS:

Prepared by: I hereby certify to the correctness of the above entries:

RHOD JASPER ESPANOLA ENGR. RANDY P. BANAY

STUDENT TRAINEE

NOTED:

88
Adviser

NUEVA VIZCAYA STATE UNIVERSITY

Bayombong, Nueva Vizcaya

COLLEGE OF ENGINEERING

Civil Engineering Department

ON-THE-JOB TRAINING

Midyear 2022

OJT/WIP ACCOMPLISHMENT REPORT

NAME: RHOD JASPER ESPANOLA

DATE ACTIVITY

SLAB CONCRETE POURING (CUTAR


SEPT. 05, 2022 SITE) CHB LAYING (KIRANG SURONG
SITE)
CHECKING CCTV POSITIONING
AND QUALITY (DRRM LGU)
SEPT. 06, 2022 BEAM REBARRING (PUROK 1, KIRANG SITE)
TRUSS ASSEMBLY (BAAN SITE)
SEPT. 07, 2022 CHB LAYING (CUTAR SITE)
BEAM REBARRING (KIRANG SURONG SITE)
SEPT. 08, 2022 PLASTERING (KAYAPA SITE)
SEPT. 09, 2022 ESTIMATION OF GATE
INSPECTION OF ONE MALFUNCTIONED
INVERTER OF THE SOLAR POWERED
SEPT.1 CCTV AND STREET LIGHTS (DRRM LGU)
0, 2022 COLUMN CONCRETE POURING AND CHB
LAYING (CUTAR SITE)
FORMORKS FOR BEAM (KIRANG
SURONG SITE)
TREE PLANTING AT THE MOUNTAIN
SEPT. 12, 2022 BEHIND BAMBANG HOSPITAL
REMARKS
Prepared by: I hereby
certify to the correctness of the above entries:

RHOD JASPER ESPANOLA ENGR. RANDY P. BANAY

STUDENT TRAINEE

89
NOTED:

Adviser