ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

PLATFORM DEAD LOADINGS

Metal Planks

Size per plank - 10" wide x 10 ft longx 2" thick


2
Area/plank = 0.75 m
Average Weight per plank = 35 lbs
2
Platform Area = 4.32 m
2
Uniformly Distributed Dead Load = 0.208 kN/m

Hand Rails

Height of Railings = 1 m
Size= 50 mm
Vertical Spacing = 1800 mm
Self Weight of Tube = 3.6 lb/ft
= 0.053 kN/per post
UDL = 0.095 kN/m

Midrail size = 50 mm
Self Weight of Tube = 3.6 lb/ft
UDL = 0.029 kN/m

Toe Plate thickness = 0.00635 m


3
Density of Steel = 7700 kg/m
Height = 0.1 m
Toe Plate UDL 0.048895 kN/m

TOTAL SELF WEIGHT OF SAFETY HANDRAIL = 0.172 kN/m

Personnel Loads =

Weight of each personnel = 250 lbs


= 1.11 kN
#= 4
2
Platform Area = 4.32 m
Total LL = 4.45 kN
2
Total LL = 1.03 kN/m
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

LIVE LOADS

Consider that each platform shall have four (4) workers at any one point in
time

Weight of each personnel = 250 lbs


= 1.11 kN
#= 4
2
Platform Area = 4.32 m
Total LL = 4.45 kN
2
Total LL = 1.03 kN/m

2
use LL = 2.4 kN/m

2
Fixed Material Load = 0 kN/m
CFML - Fixed Material Load

2 2
Variable Material Load = 0.48 kN/m (10 lbs/ft )
CVML - Variable Material Load

ASCE 37-02
pg. 19
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

Construction Procedure Loads

CH -Horizontal Loads

ASCE 37-02
Clause 4.4
pg. 15

CH -Horizontal Loads

Consider number of persons on each platform = 6


Horizontal Force per person ( 50 lb) = 300 lbs
(per platform)
= 1.335 kN
Length of access around reformer = 14.32 m
UDL = 0.093 kN/m
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

STRUCTURAL SYSTEM

R1 = 2.5
Cd = 0
Ω= 0

Spectral Acceleration Parameters

ss = mapped MCE spectral response acceleration at short


periods @ 2475 years return period
s1 = mapped MCE spectral response acceleration at 1s @
2475 years return period

ss = 0.302 s 1.51 x 20%


s1 = 0.076 s 0.381 x 20%

Site Class = D

ASCE 7-05 Fa = 1.6


Tab.11.4-1 Fv = 2.4
pg.115
SMS = 0.4832 s
SM1 = 0.18 s
SDS = 0.32 s
SD1 = 0.12 s

Tab.1-1 Occupancy Category = B


pg.3

Tab.11.5-1 Importance Factor = 1


pg.116
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

Load Combinations

2.2.3 1.4 D + 1.4 CD + 1.2 CFML + 1.4 CVML

1.2 D + 1.2 CD + 1.2 CFML + 1.4 CVML + 1.6 CP + 1.6 CH + 0.5L

1.2 D + 1.2 CD + 1.2 CFML + 1.3 W + 1.4 CVML + 0.5 CP + 0.5L

1.2 D + 1.2 CD + 1.2 CFML + 1.0E + 1.4 CVML + 0.5 CP + 0.5L

0.9D + 0.9CD + (1.3W OR 1.0E)

WHERE
D - Dead Load
L - Live Load
CD - Construction Dead Load

Material Loads
CFML - Fixed Material Load
CVML - Variable Material Load

Construction Procedure Loads


Cp - Personnel and Equipment Loads
CH - Horizontal Construction Loads

W-Wind Loads
E - Earthquake Loads

WIND LOAD REDUCTION

ASCE 37-02
6.2.1
pg. 25

Reduction Risk Factor = 0.75


ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

WIND LOADINGS

V= 87.75 mph (117 mph x 0.75)


ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

Tab. 6-3 pg. 79 Kz = 1.11


CL 6.5.7.2 pg. 26 Kzt = 1
Tab. 6-4 pg. 80 Kd = 0.85

Tab. 6-1 pg. 77 I= 0.77 Occupancy Category I

2
qz = 14.32 lb/ft

Fig. 6-5 pg. 47 GCPi = 0 open structure


0

CL 6.5.8.1 G= 0.85
pg. 26

2
qz = 14.32 lb/ft
G= 0.85

Fig. 6-23 ϵ = ratio of solid area to gross area of one tower face for the segment under
pg. 76 consideration

2
Gross Area = 493.53 m
2
Solid Area = 30.75 m 38.44*80% due to roundness

ϵ= 0.06

2
Af = 30.75 m
2
= 330.87 ft.
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

For square tower arrangements with round members

Cf = 0.572

F= 2303.69 lbs
= 10.25 kN
ABSORPTION TOWER SCAFFOLDING DESIGN CALCULATIONS AUM DOWNSTREAM

REFERENCES CALCULATION OUTPUT

Calculate Base Shear Coefficient

ASCE 7-05
Cl.12.8.1
pg. 129

SDS = 0.32
R= 2.5
I= 1

Cs = 0.13

h= 150 ft
Ct = 0.02
x= 0.75
T= 0.86 s

Cs (max) = 0.06