Chapter 1
ET
ep
(Surface + subsurface):
D
Implementation of hydraulic structures
through:
E
Conception
,C
Planning
Design
U
Construction
ET
ep
Control of water
Drainage
D
Flood mitigation facilities
Salinity control
Sediment control
E
Pollution abatement
,C
Utilization of water
Municipal use
irrigation
U
hydro-electric
navigation
ET
Management of water
Treatment and quality control
Provision & preservation of soil &water resources jointly
M
Sustainable development
Nature of water resources
t.
projects
ep
Relationship between SUPPLY and DEMAND?
D
E
Availability of water
,C
= f (quantity, quality, space, time)
U
ET
M
Characteristics of water resources problems
t.
ep
Uniqueness
D
Uncertainty
E
Socio-economic aspect
,C
Forecasting
Economy of scale
U
Irreversibility
ET
M
t.
Degree of development:
ep
(single purpose to multi-purpose)
D
Single project
E
Regional project
,C
Project over a basin
Project over a country
U
International project
ET
M
Purposes of development:
t.
ep
to improve/modify existing
D
designs&management
E
to increase national benefits
,C
to improve environmental conditions
to improve socio-economical balance over a
country
U
to sustain regional development
ET
M
Fundamentals of planning
t.
ep
Planning is the orderly consideration of a project from the
original statement of purpose through the evaluation of
alternatives to the final decision on a course of action.
D
Project formulation:
E
One or more aspects of water resources development can
be eliminated on the basis of physical limitation
,C
Certain problems may be fixed in location
The available water may be limited
Maximum land areas usable for various purposes may be
U
definable
Reserve certain lands for specific use, e.g. recreation
ET
Possible sites for water storage can be defined and their
limiting capacities evaluated.
M
Environmental concerns in planning:
t.
ep
Degradation of downstream channel or coastal
beaches
D
Loss of unique geological, historical, archelogical or
E
scenic sites flooded by a reservoir
,C
Change in stream temperature as a result of
reservoir leading to changes in aquatic life
U
Change in water quality as a result of land
ET
drainage (salinity!) or disposal from industrial
establishments
M
Systems analysis in water resources planning:
t.
ep
Input ⇒ ⇒ Output
D
SYSTEM
E
OPTIMIZATION:
,C
• Optimization of individual components of a project
U
• Optimization of a single project
ET
t.
ep
Frequency based design, e.g. storm water collection systems
Exceedance probability of design event, Pd: P(P≥Pd)⇒Failure
D
Risk based design, river training facilities
E
C
,C
Total
cost
Capital cost
U
Cost of failure
ET
Tr