Ms Deck Sheet Welding in Street
Ms Deck Sheet Welding in Street
Date
NAME SIGNATURE
PREPARED BY Mr. JETHIN SURENDRAN
BEPL
CHECKED BY Mr. B .S. SHAJI
BEPL
REVIEWED BY Mr. ANIT RAY MOULIK
BHEL
Mr. ARJUN KUMAR
The Purpose of this procedure is to provide safe working guideline during the duct sheet
welding, grinding, LPG heating, and cutting work. In this procedure we also try to prevent fall
of weld spatter from height. Work including height work and hot work (Welding, Grinding,
LPG heating & Gas Cutting)
SCOPE OF WORK:
Deck sheet hot work safe plan (welding, grinding, LPG heating & gas cutting)
During the deck sheet fit-up time welding and heating prosses on that fan bell should
arrange kept water in can (painting can use) and fire extinguisher near to the hot work place.
In ground level soft barricading, fire extinguish and water kept at near to the place also fire
watcher deputed in that place. Proper supervision on this work and proper communication
with fire watcher and welding gang. Overlap welding at deck sheet with 4mm thickness plate
it help to reduce the falling of weld spatter
Overlap plate welding at deck sheet joint area, (photo attached for reference). In over
lapping welding time weld spatter not falling from height. The weld spatter rested on
deck sheet. In edge side (curved) of the fan bell area welding should be use fire
blanket and the fan blade should be moved (gape from the welding area). Fire
blanket put on the fan guard of fan bell
Grinding on the humped area of the deck sheet and heated or hammering on the
sheet for straighten then in that area overlap welding done on it.
Gas cutting done on the plate for the over lapping. The gas cutting done at the
ground area and plate shift to the fan bell deck sheet .
Safety helmet
Safety full body harness
Safety goggle
Safety hand gloves
Leather gloves
Apron
PROCEDURES AND CONTROLS
Risk Assessment
General Hazard
SAFETY PRECAUTION:
The necessary safety precaution requires for safe work carried out as per requirement, The
following some of the key word guide line to be followed in this work
Housekeeping:
Site work place should be necessary clean for safe practices.
Good Housekeeping is a part of the safe erection safe work procedure to be
maintaining.
Clean properly equipment and machine and surrounding area after use.