You are on page 1of 13

Eccentric Footing

1. Assign Loading
Original

New
2. Define Slab

3. Draw Slab

4. Assign Soil Spring


5. Result01
Displacement (Service Load) Punching Shear Check

Soil Pressure (Service Load)(Fail)

6. Solution01
Expand 25mm of Cap

7. Result02
Soil Pressure (Service Load) Punching Shear Check

8. Solution02
Further Offset 25mm of Cap to 3.1m (Better Design Strip)

9. Design Strip
Strip A(Horizontal) Strip B(Vertical)

Min Cover Load Combo


Strip Force

Eccentric Footing02

1. Loading

2. Draw Footing and Assign Soil Spring


3. Result01
Soil Pressure(Service)(Fail) Punching Shear Check(Fail) Settlement(Service)

4. Soultion01
Increase THK=550mm Expand Footing by 100mm

5. Result02
Soil Pressure(Service) Punching Shear Check(Fail)
6. Solution02
Expand Footing by 300mm

7. Result03
Soil Pressure(Service) Punching Shear Check(Fail)

8. Solution02
Increase THK=650mm
9. Result04
Soil Pressure(Service) Punching Shear Check(Fail)

Solution on Next Lecture


Eccentric Footing03

0. From Lecture02

Soil Pressure(Service) (Fail) Punching Shear Check(Fail)

1. Draw Footing

2. Result01
Soil Pressure(Service) Punching Shear Check(Fail)
3. Solution01
Add Drop Panel(900mm) Result02 (Fail)
Punching Shear Check(Fail)

Another Column Punching Shear


Increase

4. Solution02
Increase Drop Panel(1000mm) Result03 (Fail)

Another Column Punching Shear Increase nearly Fail


also
5. Solution03
Increase Overall Footing THK=700mm Result04 (OK)
a. Punching Shear Check OK

b. Soil Pressure (Service) OK

c. Settlement(Service)
Strap Beam

1. Draw Beam
Define New Rebar Define Beam Section Draw Beam

2. Modify Beam
To adjust to overall depth of footing(Move UP 200mm)
3. Result01
Soil Punching Shear Check (Beam Force/Stress) Settlement(Servic
Pressure(Service) e)

4. Design Result
a. Envelope Longitudinal Reinforcement

b. Envelope Transverse Reinforcement