OTHER INPUTS : -

1) COLUMN SIZE- 300 x 300 x 5500 HT. 5 Nos.


2) INLET BASE SLAB -200 THICK
3) OUTLET BASE SLAB -200 THICK

500 500 1000


102.571
4) INLET WALLS -200 THICK
WL. 102.071 TL. 102.071 TL. 102.071
5) OUTLET WALLS -200 THICK

600

500
TWL. 101.571 TWL. 101.571 6) WALKWAY SLAB 150 THICK
101.071
7) COLUMN FOOTING SIZE- 1200 X 1200 X 450d
1000

BAFFLE WALL
99.770
5500

5500
FGL. 97.00 FGL. 97.00

OPENING 500 x 600

BL..96.071 BL..96.071 1000

600
200

150
6000
34700

S E C T I O N B-B

6000
1000 1000 1000

200
500 1000

1050
TL. 102.071 TL. 102.071

200
500

TWL. 101.571 TWL. 101.571


1050 1050 3000

DETAILS OF END WALL


1000
6000
5500

200
5500

FGL. 97.00 FGL. 97.00

BL..96.071 BL..96.071

6000
11600 200 11600

S E C T I O N A-A

200

200
B

850

850
3400
1000 2450 1050 2450

INLET CHANNEL TOC.101.071


TOC.102.071 DETAILS OF MID WALL
5800 5800 5800 5800
6000

500 340 500 340


TYP. TYP. TYP. TYP.

NOTES :-
1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS UNLESS OTHERWISE NOTED.
2. AVERAGE GROUND LEVEL IS AS 97.00 M
3. ALL WALL THICKNESS TO BE DECIDED BY RCC DESIGNER.
4. SHOWN AS TOP RL
34700

5. SHOWN AS BOTTOM RL
6. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH OUR DRG. NO.
SBR BASIN NO.-01 SBR BASIN NO.-02
7. ALL WORK WILL BE CARRIED OUT AS PER TENDER SPECIFICATIONS
34700 X 11600 X 5500 SWD 34700 X 11600 X 5500 SWD 8. PIPING AND EQUIPMENT DETAILS ARE SHOWN INDICATIVE. IT IS AS PER MANUFACTURER
TOC.102.071 TOC.96.071 TOC.102.071 TOC.96.071 TOC.102.071
28700

A A

00 ----- ----- ----- ----- -----

REV. DESCRIPTION OF CHANGE DATE DRA. CHK. APPR.

Status FOR PRETENDERING PURPOSE

Client:
KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD

Developer : --
OUTLET PIPE OUTLET PIPE

Main Contractor: --

Project
SEWAGE TREATMENT PLANT OF 5.83MLD CAPACITY
2000

2000

BASED ON SBR TECHNOLOGY

Title :
GA DRAWING OF SEQUENTIAL BATCH REACTOR (SBR)
1500 2100 2100 1500
DRAWING NUMBER : KUWSDB /5.83MLD STP/ SBR / G.A. / 01 Sheet No : 01.
11600 11600
Scale: 1:100 Drawn By: SSS Checked By: --- Date:30.10.2020
B PLAN Drawing Status : FOR APPROVAL Approved By: --- Rev: 0.