You are on page 1of 1

TOWER No.

118

SECTION THRU - "A"


1:100
SCALE M.

110.00
NGL
109

108

PARTIALLY-BURIED COCO FIBER


107
LOG (200mm Ø) INSTALLED
ALONG THE SAME HORIZONTAL
ELEVATION (AS SHOWN)
106

105.00
VETIVER GRASS (3 SLIPS PER CLUMP) L
FIL
PLANTED @ 0.40M O.C. BOTH WAYS
104

103
Elevation

102

101

100.00
2 - LAYERS COCO
FIBER NET
99

98

97

WH
96
WH

95.00
GROUTED RIPRAP
(SEE DETAIL)
94
100mm THICK LEAN
CONCRET
93
-31.00

-29.00

-28.00

-27.00

-26.00

-24.00

-23.00

-22.00

-21.00

-19.00

-18.00

-17.00

-16.00

-14.00

-13.00

-12.00

-11.00

-9.00

-8.00

-7.00

-6.00

-4.00

-3.00

-2.00

-1.00
-30.00

-25.00

-20.00

-15.00

-10.00

-5.00

0.00
Offset
SUBMITTED BY: PROJECT TITLE: OWNER: SHEET CONTENT: SHEET

NATIONAL GRID CORPORATION OF THE AS SHOWN


MARISSA L. ENCINA
CONSTRUCTION OF SLOPE PROTECTION FOR
PHILIPPINES 2
TOWER 118 ALONG AURORA-NAGAMIN 138kV
GENERAL MANAGER, VITANOVA CONSTRUCTION MINDANAO OPERATIONS AND MAINTENANCE NOTES:
TRANSMISSION LINE 2
MA. CRISTINA ILIGAN CITY BASED ON P.O. NO.: 7
LOCATION: COMPLETED ON: