You are on page 1of 1

55.00 55.

00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a - -1.000 0.600 103(1)a 0.64 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25

508(1) 6.86 508(1) 3.00


TOP OF REVETMENT @ ELEV. 50.997 m TOP OF REVETMENT @ ELEV. 50.997 m

HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m CORN FIELD 50.00
UPBK
FOR STONE MASONRY FOR STONE MASONRY
49.147
UPBK 1.225 49.698 49.098
ZOC. EXCAV. = 0.22 sq.m. -1.000 1.250 ZOC. EXCAV. = 0.24 sq.m.
48.347
0.000 ITEM 506(1) = 0.79 sq.m. ITEM 506(1) = 0.81 sq.m.
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m.
TOP OF PILE CAP @ ELEV. 47.447 m. TOP OF PILE CAP @ ELEV. 47.447 m.
WW LBK
47.598
WE WE -2.141
CWW
WE 46.785
46.698 -2.141
46.547 -3.000
-3.000
CWW
45.00 45.00
45.198
-8.000

0 + 480.00 0 + 540.00
ORIGINAL GROUND 48.347 m ORIGINAL GROUND 49.698 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

55.00 55.00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a 0.98 -1.000 0.600 103(1)a 1.40 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25

508(1) 4.56 508(1) 3.37


TOP OF REVETMENT @ ELEV. 50.997 m UPBK TOP OF REVETMENT @ ELEV. 50.997 m

HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00
UPBK
FOR STONE MASONRY FOR STONE MASONRY
47.742
49.367 47.319 49.119
-2.628
WW 1.115 ZOC. EXCAV. = 0.29 sq.m. -3.550 1.239 ZOC. EXCAV. = 0.24 sq.m.
CWW 48.419
LBK
48.396 ITEM 506(1) = 0.72 sq.m. LBK -1.150 ITEM 506(1) = 0.80 sq.m.
-0.500
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m.
WE TOP OF PILE CAP @ ELEV. 47.447 m. WE TOP OF PILE CAP @ ELEV. 47.447 m.
48.074
47.394 47.598 -1.902
-4.249 -2.141
CWW
46.785 46.785
46.785 -3.641 -2.141
46.785
-3.641 -2.141

45.00 45.00

0 + 460.00 0 + 520.00
ORIGINAL GROUND 50.096 m ORIGINAL GROUND 49.719 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

55.00 55.00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a 0.68 -1.000 0.600 103(1)a 0.25 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25


50.268
0.965
508(1) 5.78 508(1) 3.14
TOP OF REVETMENT @ ELEV. 50.997 m UPBK TOP OF REVETMENT @ ELEV. 50.997 m
ROAD SLIP

HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00
49.668 UPBK
0.965 FOR STONE MASONRY FOR STONE MASONRY
47.089 48.005
-3.945 0.000 ZOC. EXCAV. = 0.53 sq.m. 2.493 ZOC. EXCAV. = 0.24 sq.m.
ITEM 506(1) = 0.62 sq.m. 42.860
4.073
ITEM 506(1) = 0.82 sq.m.
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. LBK PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. 46.262
TOP OF PILE CAP @ ELEV. 47.447 m. WE TOP OF PILE CAP @ ELEV. 47.447 m.
WE WE
WW
CWW 47.289
-2.141 1.785
CWW 42.859
1.785
46.785 46.785
42.125
-3.641 -2.141
45.00 45.00

0 + 440.00 0 + 500.00
ORIGINAL GROUND 50.805 m ORIGINAL GROUND 49.673 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

REPUBLIC OF THE PHILIPPINES


PROJECT TITLE: SHEET CONTENTS: DESIGNED: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PLANS FOR THE DETAILED CROSS SECTION
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE
OFFICE OF THE DISTRICT ENGINEER
AND DRAINAGE SYSTEM ALONG SURIGAO RIVER C 7
Brgy. Quezon, Surigao City, Surigao del Norte NESAH B. DAPAR GINA P. SORIANO EMMANUEL J. CABANOS HENRY CRUZ J. MARAPAO
SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT FC2 11
SURIGAO CITY SOURCE OF FUND: REGULAR INFRA CY 2018
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
APPROPRIATION: Php 70,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION