55.00 55.

00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a 3.38 -1.000 0.600 103(1)a 4.00 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25

508(1) 6.93 508(1) 6.95


TOP OF REVETMENT @ ELEV. 50.997 m TOP OF REVETMENT @ ELEV. 50.997 m

HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00
C.R
UPBK
48.250
FOR STONE MASONRY 48.430 48.430 FOR STONE MASONRY
48.250 -5.286
48.250 1.973 -2.284 48.156
-2.374
-5.106
ZOC. EXCAV. = 0.24 sq.m. 2.021 ZOC. EXCAV. = 0.24 sq.m.
ITEM 506(1) = 1.29 sq.m. ITEM 506(1) = 1.33 sq.m.
LBK
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. 47.650 PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m.
TOP OF PILE CAP @ ELEV. 47.447 m. 1.973 47.561
TOP OF PILE CAP @ ELEV. 47.447 m. 2.021

46.785 46.785 46.785 46.785


-3.641 -2.141 -3.641 -2.141

45.00 45.00

0 + 840.00 0 + 900.00
ORIGINAL GROUND 48.277 m ORIGINAL GROUND 48.230 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

55.00 55.00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a 5.02 -1.000 0.600 103(1)a 3.22 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25


49.892
508(1) 5.77 6.000 508(1) 7.09
TOP OF REVETMENT @ ELEV. 50.997 m TOP OF REVETMENT @ ELEV. 50.997 m

HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00
48.592
48.765 1.802
UPBK -5.621
FOR STONE MASONRY 48.203
48.203
FOR STONE MASONRY
-5.059
-2.397 48.203
ZOC. EXCAV. = 0.24 sq.m. 1.997 ZOC. EXCAV. = 0.24 sq.m.
48.642
-1.619
ITEM 506(1) = 1.18 sq.m. ITEM 506(1) = 1.31 sq.m.
47.992 48.203
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. 1.802 WE PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. -1.838 47.603
TOP OF PILE CAP @ ELEV. 47.447 m. 48.592 1.997
TOP OF PILE CAP @ ELEV. 47.447 m.
6.000

46.785 46.785
46.785 46.785 -2.141
-3.641
-3.641 -2.141

45.00 45.00

0 + 820.00 0 + 880.00
ORIGINAL GROUND 48.592 m ORIGINAL GROUND 48.203 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

55.00 55.00
QUANTITIES CL QUANTITIES CL
ITEM AREA ITEM AREA
50.997 50.997 50.997 50.997
103(1)a 6.21 -1.000 0.600 103(1)a 3.46 -1.000 0.600

405(1)a3 1.25 405(1)a3 1.25

508(1) 4.98 508(1) 6.84


TOP OF REVETMENT @ ELEV. 50.997 m TOP OF REVETMENT @ ELEV. 50.997 m
48.836
1.681
HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00 HIGHEST FLOOD LEVEL @ ELEV. 49.997 m 50.00
UPBK 48.276 48.276
FOR STONE MASONRY -5.132 -2.361
48.276 FOR STONE MASONRY
1.960

49.061 ZOC. EXCAV. = 0.24 sq.m. ZOC. EXCAV. = 0.24 sq.m.


-5.917 48.913
-1.483
48.236 ITEM 506(1) = 1.10 sq.m. 48.276
ITEM 506(1) = 1.29 sq.m.
1.681 UPBK
PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. PRESENT WATER SURFACE LEVEL @ ELEV. 47.615 m. -1.801 47.676
TOP OF PILE CAP @ ELEV. 47.447 m. 1.960
TOP OF PILE CAP @ ELEV. 47.447 m.
47.598
-2.141

46.785 46.785
46.785 -3.641 -2.141
WE 46.785
-3.641 -2.141
45.00 45.00

0 + 800.00 0 + 860.00
ORIGINAL GROUND 48.864 m ORIGINAL GROUND 48.276 m
DESIGN GRADE 50.997 m 40.00 DESIGN GRADE 50.997 m 40.00
-15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00

REPUBLIC OF THE PHILIPPINES


PROJECT TITLE: SHEET CONTENTS: DESIGNED: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PLANS FOR THE DETAILED CROSS SECTION
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE
OFFICE OF THE DISTRICT ENGINEER
AND DRAINAGE SYSTEM ALONG SURIGAO RIVER C 10
Brgy. Quezon, Surigao City, Surigao del Norte NESAH B. DAPAR GINA P. SORIANO EMMANUEL J. CABANOS HENRY CRUZ J. MARAPAO
SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT FC2 11
SURIGAO CITY SOURCE OF FUND: REGULAR INFRA CY 2018
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
APPROPRIATION: Php 70,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION