Professional Documents
Culture Documents
2 511 BF2
2 511 BF2
2022 the above dust Extraction System was thoroughly cleaned and (so for its construction
permits) made accessible for thorough examination. I further certify that on the said date, I thoroughly examined the
above dust extraction system including and fittings and that the above is a true report my examination.
Form 21-A
[Prescribed under rule 107]
Test Report-Dust Extraction System