Project November 16. Commencement of commercial operations in 2012 April 6. Generators
Ceylon Electricity Board
Environment and Development in Harmony, for Economic Prosperity of the Nation To maintain the natural beauty and aesthetics of the waterfall, 47,250 cubic Introduction meters of water is released from the reservoir daily. By the Thalawakele-Hatton main road, a viewing gallery is constructed The power plant has two generators by CEB for the benefit of both local and that can generate 75 megawatts of foreign tourists who comes to visit the electricity each. Water-fall. An electromagnet in a copper coil Project details generates electricity by rotating 600 The cost is 55 billion rupees revolutions per minute. The Upper Kotmale Hydro Power Project, The mechanical energy received in the The donor nation: Japan which was part of the Initial Mahaweli turbine becomes the electrical energy. Expert advice was provided by Development Plan formulated in 1968, The Upper Kotmale Power Plant Electrical Power Developed Company, was delayed due to various reasons and capable of generating 409 million units was reactivated in year 2002. The water Japan Major Contracting Companies are of electricity to the national grid collected by crossing the Kotmale Oya, a annually. It is enough to supply tributary of the Mahaweli River near the • Maeda Corporation, Japan electricity to about 500,000 town of Thalawakele, will be taken to the • Maeda Nishimatsu J-V, Japan households. underground power plant in Kotmale • Kurimoto Limited, Japan Niyamgamdora area through a 12.5 km Transmission Line • Mitsubishi Corporation, Japan long tunnel where a capacity of 150 • Kinden Corporation, Japan Electricity is transmitted from the megawatts of electricity will be generated Upper Kotmale Power Plant at and released to the National Grid for the Number of resettled families :498 Niyamgamdora to the Kotmale Switch economic development of the nation. Generation capacity is 150 MW Yard in the Ata-bage area in Gampola. Transmission Voltage is 220kV. Upper Kotmale dam features: The maximum supply level is 1194 m It is about 15.5 km in length. Type: Concrete gravity above sea level and the minimum supply The transmission line consists of 45 Height: 35.5. m level is 1190 m above sea level. towers. Length: 180 m Tunnel Turbines Width: 7 m The reservoir has two special gates to remove sand and silt and release water to St. Clair waterfall. In the event of an emergency flood, 3300 cubic meters per second can be pumped out of the sluice gates. Upper Kotmale headrace tunnel features: Reservoir Two Francis type turbine machines are Type: Horseshoe shaped with
installed in the plant. Each turbine can concrete lining
absorb 77 megawatts of energy from water Length: 13.5 km (including
into mechanical energy. The turbine is penstock)
housed in a spiral container. Diameter: 5.8 m
Thickness of concrete: 400 mm Intake Dam At the end of the tunnel there is a top- Upper Kotmale reservoir features: down pipe system called penstock to direct Spill level: 1194 masl water to the turbine with high pressure. Intake level: 1190 masl Drawdown: 4 m Live storage: 0.8 MCM Total storage: 2.5 MCM It is built near the town of Thalawakele. Catchment area: 310 km2