TABLE OF CONTENTS
1. Introduction ...............................................................................................................3
1.1 General .......................................................................................................................3
1.2 Purpose of Document .................................................................................................3
1.3 Scope of Work ............................................................................................................3
1.4 Definitions and Abbreviations .....................................................................................4
1.5 References .................................................................................................................6
2. Installation Parameters and Product Data .............................................................7
2.1 General Information ....................................................................................................7
2.2 General Data ..............................................................................................................9
2.3 Product and ancillary equipment description ............................................................11
2.4 General Installation Parameters ...............................................................................11
2.5 General Installation Equipment ................................................................................16
2.6 Weather Limitation ....................................................................................................17
2.7 Installation Schedule and Duration ...........................................................................17
3. Procedure Overview ...............................................................................................18
4. Task Plans ...............................................................................................................19
4.1 Task #1 Survey Operations ......................................................................................19
4.2 Task # 2 Pile Guide Frame Installation, Repositioning & Recovery .........................23
4.3 Task # 3 Preparation for Pile & Mooring Chain Installation ......................................30
4.4 Task # 4 Deployment and Upending of Pile .............................................................35
4.5 Task # 5 Laying of LCS Mooring chain .....................................................................41
4.6 Task # 6 Deployment and Recovery of Pile Hammer & Follower .............................44
4.7 Task # 7 Pile Driving Operation ................................................................................52
4.8 Task # 8 Contingency Task Description ...................................................................57
Appendix I: Reference Sketches
Appendix II: Reference Drawings
Appendix III: Task Completion Certificates
Appendix IV: Data Sheets
Appendix V: Inspection & Test Plan
Appendix VI: Lift Plan
Appendix VII: General Information
Page 2 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
1. Introduction
1.1 General
BW Offshore has been awarded an FPU Lease and Operation Services Contract for the TSB
Field Development Project.
The Terang, Sirasun, Batur (TSB) Field Development Project consists of the development of 3
gas fields located approximately 250km from Surabaya, East Java and 100km north of Bali
Island.
This document will provide a clear understanding of the scope of work associated with each
activity to be undertaken and will help to ensure safe and efficient performance of the operation.
Page 3 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Abbreviations
AFC Approved for Construction
AHC Active Heave Compensation
Page 4 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 5 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
TBC to be confirmed
TDP Touchdown Point
TSB Terang Sirasun Batur field
UB Upper Bound
UCS Upper Chain Segment
WROV Work class ROV
w.r.t. With Reference To
1.5 References
Client Documents
KEI - Technical Specifications: FPU Lease and Operation
/A1/ Services of TSB Field Development Project
P.T. Fugro Indonesia - Final Report: Geophysical Survey for the
/A2/ S2014-02 Proposed 20” Gas Export Pipeline Route and the Proposed 16”
Flowline Route Terang Block East Java Sea, Indonesia
P.T Pageo Utama - Geotechnical Investigation Report for
/A3/ AGSB/59/SI/08/SUB Terang Sirasun Batur Field
Fugro GEOS Ltd - Terang Sirasun Development Metocean
/A4/ TS-PL-REP-8171 Design Criteria Report
BWO Documents
Other Documents
Page 6 of 66
Project: FPU
F for Teran
ng Sirasun Baatur Field Doc. No
N
Documentt Title : Mooring Pre-Installation Procedure 4059-K
KA-00213943
3, Rev. 0
2. In
nstallation Parame
eters and
d Productt Data
2.1 G
General Info
ormation
2.1.1 Field Locatiion
The TSB B Field is loc
cated approxximately 250
0km from Surabaya, Ea
ast Java and
d 100km north of
Bali Islan
nd.
Surrabaya
Tanjung Waangi
Page 7 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
The vessel is to be aligned with the bow pointing more or less towards WNW, or more
specifically on a heading of 292.5°. However, the position and heading of FPU will be adjusted
according to as-built riser base.
Each chain will be divided into a 150m LCS with the balance of length incorporated in the UCS.
The UCS chain will be installed later buy another vessel. The azimuth angle when looking from
the FPSO is noted as follows:
Page 8 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Location MSL
Anchor #2 95.5m
Anchor #5 94.8m
Anchor #8 94.5m
Anchor #11 95.5m
Page 9 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
The only seabed features observed within the site were scattered isolated pockmarks.
The soil layer data including submerged unit weight, undrained shear strength and friction angle
are presented in Ref. /A2/, /A3/
The first layer of seabed soil is silty sand except the silty clay at NW cluster.
2.2.4 Main Installation Vessel
Contractor plans to use the DP Class Installation Vessel Southern Ocean for installation of the
Mooring Piles, LCS mooring chains and wet storage of Umbilicals and Risers.
Page 10 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 11 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Geodetic Parameters:
Coordinate System: WGS-72 (NWL-10D)
Datum: WGS-72 (NWL-10D)
Spheriod: WGS-72 (BE)
Projection: Universal Transverse Mercator (UTM)
Zone: Southern Hemisphere
Central Meridian (Cm): 116º E
Origin Latitude: 0º
False Easting: 500000m
False Northing: 1000000m
Scale Factor (Cm): 0.9996
Units: Metres
Page 12 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
The table overleaf provides a summary of installation loads and limiting criteria, the following list
highlights the physical restrictions.
Page 13 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Pile capacity:
Pile stress utilization factor; yield 350 MPa (ULS) 0.14
Pile stress utilization factor; yield 350 MPa (ALS) 0.20
Max lateral deflection of pile (ULS/ALS) 3.7 cm / 5.6 cm
Pile driveability
Hammer size investigated MHU-270 (equivalent to S-280)
Hammer efficiencies 30% / 50% / 75%
Total number of blows 1485 / 1006 / 750
Max no blows/0.25 m 38 / 26 / 19
Max/ Min pile stress during driving (MPa) 148 MPa / -139 MPa
It is estimated that if high estimate soil strength with hard clay layer within the top 5m is
experienced the pile self weight penetration would be in the range from 1m to 3m. This
penetration would not be sufficient for the pile to be stable prior to driving with hammer on top. A
pile guide frame is therefore required to support the pile during installation. The hard clay layer
seems most likely to occur at the SW and SE anchor pile clusters.
Six design profiles are identified. These design profiles include low estimate and
high estimate conditions with and without stiff clay and sand layer. The undrained shear strength
design profiles are as follows:
Soil Profile 1 - low estimate without hard clay
Soil Profile 2 - low estimate with hard clay
Soil Profile 3 - high estimate without hard clay
Soil Profile 4 - high estimate with hard clay
Soil Profile 5 - low estimate with top sand (0 - 2m) and extended hard clay (2 - 5m)
Soil Profile 6 - high estimate with top sand (0 - 2m) and extended hard clay (2 - 5m)
Page 14 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Pile Driving
The TSB piles were assumed to be driven to their target tip depth by the Menck MHU- 270
hammer. Driveability analyses were carried out using hammer efficiencies of 30%, 50%, and
75%. These efficiencies correspond to energy values of 90 kJ, 150 kJ and 225 kJ respectively.
Calculated pile driving resistance are summarised in Table 1 and 2 below for Soil Profile 1 and
4, respectively.
Table 1: Pile driving resistance, low estimate soil strength without hard clay layer soil
(Soil Profile 1)
Energy = 90 kJ Energy = 150 kJ Energy =225 kJ
Depth
N25 Ntot N25 Ntot N25 Ntot
18 m 8 53 5 41 5 40
20 m 10 120 6 88 5 81
25 m 16 356 10 243 8 196
Page 15 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
N25 =Driving Resistance, Number of Blows per 0.25m Ntot= Total Number of blows
Table 2: Pile driving resistance, high estimate soil strength with hard clay layer soil
(Soil Profile 4)
Energy = 90 kJ Energy = 150 kJ Energy =225 kJ
Depth
N25 Mot N25 Ntot N25 Ntot
8m 8 57 6 42 5 41
12 m 13 220 9 159 7 133
15 m 18 399 12 282 9 226
20 m 27 843 18 581 13 444
25 m 38 1485 26 1006 19 750
N25 =Driving Resistance, Number of Blows per 0.25m Ntot= Total Number of blows
A control of pile response due to operational stop during pile driving is conducted for a full set-up
condition (i.e. e = 1.0) with a hammer efficiency of 75%. It is calculated that driving resistances
increase due to set-up effect. Nevertheless, this increase in driving resistance is well below the
refusal levels (Maximum N25 when re-driving after the stop was found to be 36 blows)
Page 16 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Auxiliary Crane (NOV) Main Hoist (2-Falls)** 110t @ 7.0m to 10.2m N/A
Auxiliary Crane (NOV) Main Hoist (1-Falls)* 90t @ 12.3m to 15.3m N/A
* Approx. load capacities based on subsea lift crane curve, DAF = 1.3
** Approx. load capacities based on subsea lift crane curve, DAF = 1.6
2.6 Weather Limitation
Refer to the following document: 4059-CA-00213955, Mooring Installation Analysis, Ref. /B3/
for details of specific weather limitations.
Refer to Section 2.4.4 for a summary table of installation loads and related weather limitations.
Specific weather limitations are noted in the introductory section of each Task Plan in Section 4.
Page 17 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
3. Procedure Overview
The Mooring Pre-Installation sequence shall be as following:
1: Survey Operations
Pre-installation survey for pile guide / pile positions
Pre-lay survey of mooring chain corridors
Pile guide frame and pile position, orientation and
inclination
Mooring chain position (touchdown and twist
monitoring)
Page 18 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
4. Task Plans
4.1 Task #1 Survey Operations
4.1.1 Task #1 Objectives
Task # 1 Objectives
Task Summary
Carry out survey operations as required with reference to document 4059-KA-00213948 “Survey
and Positioning Procedures”, typically as follows:
Operational limitations
Other Information
Refer to Section 2.4 for relevant Field Co-ordinates and Installation tolerances
Refer to the following drawings
FPU – Mooring System Field Layout, 1724-APL-W-XG-BM-S0011901
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 19 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 20 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 21 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Quantity
Equipment List Check+
Use Spare
ROV c/w project survey spread 1 1
Acoustic transponder (contingency for pile guide frame positioning) 2 1
Attached References
Task Plan
Document Number Description
Specific Ref.
1724-APL-W-XG-BM-S0011901 FPU – Mooring System Field Layout 1
4059-XE-00277510 LCS Mooring Chain Abandonment Pattern 1
Page 22 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Other Information
Lift weight – Pile Guide Frame: Static (in Air): 86.8t Dynamic (in Air): 149t
Lift weight – Pile Guide Frame: Static (in Water): 75.5t Dynamic (in Water): 88t
Lift weight – Pile Guide Frame: Estimated load to break seabed suction: 113t
Refer to Lift Plan – Pile Guide Frame, TSB-SO-LP-001
Refer to Lift Analysis Report
Refer to Section 2.4 for relevant Field Co-ordinates and Installation tolerances
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 23 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 24 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 25 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
14. Lower Pile guide frame to approx. 25m water depth. ROV to SS/RS
disconnect holdback tuggers if any.
Page 26 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
2. Set-up vessel on best heading for lifting operations above the pile DP/SS
guide frame position.
3. Deploy ROV to locate pile guide frame. RS
Install transponder (mini-beacon) onto crane block or wire to assist
with future positioning operations. Deploy crane with 250t ROV hook
rigging. Position crane connection point adjacent to grommet
4. connected to guide frame lift rigging. DF/SS
5. ROV to make connection between the 250t ROV hook rigging and RS
PGF “floating” grommet.
Page 27 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Plumb crane above guide frame, take tension in the rigging, maintain
tension and use vessel motion to break seabed suction until frame
lifts off seabed.
6. Note: Shift Supervisor / Crane Operator to select most suitable mode SS
for “breakout” of guide frame from seabed.
Monitor crane hook load at all times during “breakout” – do not
exceed 150t load. Note: SWL of rigging is 150t.
Page 28 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Continue recovering the pile guide frame until it is lifted through the
5. splash zone. SS/DF
Pay in tugger taglines as necessary to stabilise the load.
Slew the pile guide frame inboard, land on deck immediately to
minimise swinging.
6. Reposition pile guide frame on deck as necessary. Disconnect DF
rigging.
Install seafastenings to secure guide frame to deck.
Quantity
Equipment List Check+
Use Spare
Refer to Drg. No. 4059-XG-00279809.001, Pile Guide Frame Rigging Arrangement
1 1
Attached References
Task Plan
Document Number Description
Specific Ref.
4059-XE-00278596.001 Mooring Pre-Installation Deck Layout 2.1, 2.3
4059-XG-00279809.001 PGF Lift Rigging Arrangement 2.1, 2.2, 2.3
4059-KA-00213943-SK-100 PGF Deployment Storyboards 2.1, 2.2, 2.3
96” Slotted Frame Alternative Rigging
DR0607-186-905-1 2.1, 2.2, 2.3
General Arrangement
96SF-Datasheet 84” Slotted Frame General Arrangement 2.1, 2.2, 2.3
Page 29 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Other Information
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 30 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 31 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
5. Continue paying out chain until at least 50m has been deployed over DF
the gypsy.
Page 32 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 33 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Quantity
Equipment List Check+
Use Spare
Refer to Drg. No. 4059-XG-00279818.001, Mooring Pile Deck/Loadout Lift Rigging Details
1 1
Refer to Drg. No. 4059-XG-00279820.001, Mooring Pile Deployment Rigging Details
1 1
Refer to Drg. No. 4059-XG-00288330.001, General Chain Handling Rigging Details
1 1
Miscellaneous
Cargo Strap, Endless Type c/w Ratchet Assembly, 10t MBS x 6m long 4 0
Special Anchor Shackle Assembly c/w locking bolts and accessories 12 0
Round Sling, 2t SWL x approx. 2m Long 4 0
Webbing Sling, 2t SWL x approx. 2m Long 12 0
Spanner, Combination, 24mm A/F (for locking nuts on Anchor Shackle
2 0
pin)
Attached References
Task Plan
Document Number Description
Specific Ref.
4059-XG-00279820.001 Mooring Pile Deployment Rigging Details 3.2
Mooring Pile Deck/Loadout Lift Rigging
4059-XG-00279818.001 3.2
Details
Page 34 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Other Information
Lift weight – Pile (Deployment)c/w chain: Static (in Air): 74t Dynamic (in Air): 98t
Lift weight – Pile (Deployment): Static (in Water): 64.4t Dynamic (in Water): 73t
Lift weight – Pile (Upending): Static (in Water): 64.4t Dynamic (in Water): 73t
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 35 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
5. Release the chain stopper rigging at the crash rail (Goal Post) so that DF
the chain hangs freely from the pile padeye, over the rail.
6. Connect both holdback tuggers (CT tuggers from MAC crane or Deck DF
tuggers) to minimise pile movement during deployment if required.
Connect pile lift rigging arrangement to crane main block and pile as
per drawing. Connect Pile Hang-off Pennant Rigging to the main lift
rigging.
Note:
ROV Supervisor to witness installation of ROV rigging. DF
7. Install transponder (mini-beacon) onto crane block or wire to RS
assist with future positioning operations.
Refer to the following drawings / sketches:
Mooring Pile Deployment Rigging Details, 4059-XG-
00279820.001
Pile Hang-off Pennant Rigging Details, 4059-XG-00286857.001
Page 36 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Lift pile from deck, slew outboard and deploy through splash zone,
paying out tugger winches as required.
Lower pile to approx. 25m water depth, stop for ROV to disconnect
11. DF/SS
the holdback tuggers and recover back to deck.
Refer to the following drawings / sketches:
Pile and LCS Installation Storyboards, 4059-KA-00213943-SK-
200
Continue lowering of crane with ROV monitoring upending sling, such
that the hang-off pennant starts to take weight and pile starts to
upend. SS/RS
12.
Refer to the following drawings / sketches:
Pile and LCS Installation Storyboards, 4059-KA-00213943-SK-
200
Continue lowering crane until pile is fully upended and crane lift
13. rigging is slack. SS
Adjust chain catenary as required.
ROV to disconnect pile lift rigging via the ROV releasable shackles
connected to the Pile’s lower padeye and the masterlink above the
spreader beam.
14. SS/RS
On completion recover pile lift rigging to deck.
Refer to the following drawings / sketches:
Mooring Pile Deployment Rigging Details, 4059-XG-
00279820.001
Deploy crane to hang-off position and connect crane main block to
hang-off pennant as per drawing. DF/SS
15.
Refer to the following drawings / sketches:
Pile Hang-off Pennant Rigging Details, 4059-XG-00286857.001
Come up on crane main block to take weight of pile and hang-off
pennant, disengage and slew outboard from hang-off slot. DF/SS
16.
Note: Care must be taken to avoid imposing uplift on hang-off plate
due to underlying hang-off chain link.
Page 37 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 38 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
22. SS
Lower off crane and slew to side to provide slack in the pennant wire.
ROV to pull out the trunnion locking pins, and disengage the spreader
bar lifting slings.
Note: All parts are secured via wire lanyards. SS/RS
23.
Refer to the following drawings / sketches:
Mooring Pile Deployment Rigging Details, 4059-XG-
00279820.001
24. SS/DF
Recover the spreader beam and rigging back to deck of vessel.
25. Continue with LCS Mooring chain laying and piling operations as per ALL
Task Plan #5.
Quantity
Equipment List Check+
Use Spare
Refer to Drg. No. 4059-XG-00279818.001, Mooring Pile Deck/Loadout Lift Rigging Details
1 1
Refer to Drg. No. 4059-XG-00279820.001, Mooring Pile Deployment Rigging Details
1 1
Refer to Drg. No. 4059-XG-00288330.001, General Chain Handling Rigging Details
1 1
Attached References
Task Plan
Document Number Description
Specific Ref.
4059-XE-00278596.001 Mooring Pre-Installation Deck Layout 4
Page 39 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 40 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Weather window required: 2-hours (from commencement of activity)
Note: The mooring chain can be abandoned to seabed at any suitable opportunity should weather
conditions deteriorate. Vessel heading:Restricted, depending on lay heading.
Other Information
Component weights in air in water
Ø94mm Mooring Chain: 176.7 kg/m 153.6 kg/m
The LCS mooring chain upper end, i.e. the end to be abandoned to seabed has no special end links.
To facilitate LCS chain recovery, a grommet with buoyancy will be pre-attached to LCS chain end for
AHT to subsequent recover, pre-tension and connect to UCS chain at a later stage.
Typical catenary loads:
Load In Air (t) In Water (t) Max
Description Static Dynamic Static Dynamic Hs (m)
Mooring Chain Catenary:
15m layback 15.9
30m layback N/A N/A 16.8 23.4 1.5
45m layback 18.0
Procedure Reference : 4059-KA-00213943
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 41 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 42 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
6. Lay away the chain along the final section of the abandonment route SS/RS
by lowering the crane and stepping the vessel.
Abandon the chain end on seabed, leaving the A&R rigging in a good
7. position for future recovery operations by an AHT. SS/RS
ROV to disconnect the A&R rigging, recover the crane to deck.
8. RS/SR
ROV / Survey to take a fix at the chain end and plot on Navscreen.
4.5.3 Task #5 Equipment
Quantity
Equipment List Check+
Use Spare
Refer to Drg. No. 4059-XG-00288330.001, General Chain Handling Rigging Details
1 1
Refer to Drg. No. 4059-XE-00277608.001, General Deck Crane Rigging Stinger Details ,
1 1
Attached References
Task Plan
Document Number Description
Specific Ref.
4059-XG-00288330.001 General Chain Handling Rigging Details 5
4059-XE-00277510.001 Mooring Chain Abandonment Pattern 5
4059-KA-00213943-SK-200 Pile and LCS chain Installation Storyboards 5
Page 43 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Other Information
Lift weight – Pile Follower: Static (in Air): 38.2t Dynamic (in Air): 49.6t
Lift weight – Pile Hammer & Follower: Static (in Air): 98t Dynamic (in Air): 127t
Lift weight – Pile Hammer & Follower: Static (in Water): 86t Dynamic (in Water): 90t
Refer to Lift Plan – Pile Hammer & Follower Lift and Deployment, TSB-SO-LP-004
Refer to Section 2.4.1 for relevant Field Co-ordinates
Refer to Section 2.4.2 for Installation Tolerances
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 44 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 45 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 46 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
14. Ensure that sufficient slack is paid out from the hammer umbilical and SC2
control line to allow upending to commence without risk of snagging.
Upend hammer & follower on its upending frame.
Payout on hammer umbilical and control lines as required.
Ensure tugger winch connected to upper end of hammer is kept
15. under tension to prevent the assembly from overturning until the DF/SC2
hammer is fully upright.
Refer to the following drawings / sketches:
Pile Hammer & Follower Deployment Storyboards, 4059-KA-
00213943-SK-300
16. Lift hammer & follower out of the upending frame, and slew over the DF/SC2
side of the vessel.
Page 47 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
21. Refer to Section 4.7 for pile hammer & follower stabbing and driving ALL
operations.
Page 48 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Sub–Task #6.2 Pile Hammer & Follower Recovery – Option 1 Recover to Deck
Plumb crane lift rigging over pile top, come up on crane to lift hammer
& follower clear of pile top.
Note: There is a minor risk that the follower may bind within the pile
during withdrawal due to a soil plug, or entrapped soil creating
additional friction between pile and follower. Use crane in the most
suitable mode in order to gradually build the tension without high load
fluctuations.
1. Weight of Pile Hammer & Follower : Static (in Water) : 85.7t, SS/RS
Dynamic (in Water): 90.5t
Page 49 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Lift & Shift Pile hammer c/w Follower from deployment position on its
upending frame to storage position as follows:
Connect Pile hammer c/w Follower deck lift rigging to main crane
Attach suitable holdback tuggers using the crane CT winches and
the deck tagline winches DF/SC2
8.
Release securing rigging from the Hammer and Follower if any
Lift and shift the Pile hammer c/w Follower from the deployment
position on upending frame to the storage position.
Secure Pile hammer c/w Follower on the upending frame as
required
Sub–Task #6.3 Pile Hammer & Follower Recovery – Option 2 Hang-off on Hang-off frame
Plumb main crane lift rigging over pile top, come up on crane to lift
hammer & follower clear of pile top.
Note: There is a minor risk that the follower may bind within the pile
during withdrawal due to a soil plug, or entrapped soil creating
additional friction between pile and follower. Use crane in the most
suitable mode in order to gradually build the tension without high load
1. SS/RS
fluctuations.
Weight of Pile Hammer & Follower : Static (in Water) : 85.7t,
Dynamic (in Water): 90.5t
Record the actual submerged weights of hammer and follower
assembly is any increasing weight from soil plug etc.
Continue lifting hammer & follower while paying in umbilical hoses,
control cable until approx. 30m water depth.
Slew main crane close to the hammer hang-off frame within the reach
of transfer sling.
2. Note: the Pile hammer transfer rigging is designed to be 5m long to SS/RS
avoid any risk of the crane block colliding with hang-off pennant
during the transfer process.
ROV to connect the transfer sling to the 250t ROV hook on the Hang-
off pennant.
If necessary, engage crane heave compensation mode. SS/RS
3.
Refer to the following drawings / sketches:
Pile Hammer & Follower Deployment Storyboards, 4059-KA-
00213943-SK-300
4. Lower the main crane until the hang-off pennant takes all the load of SS/RS
Hammer and Follower.
ROV to disconnect main crane rigging and recover to deck as
5. required. SS/RS
If necessary, engage crane heave compensation mode.
Page 50 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
If the Hammer & Follower had been hanging off on the hang-off
frame, transfer it back to the main crane prior to stabbing into the pile
when required as follows:
Slew main crane and lower the main block c/w ROV hook to the
transfer depth.
6. SS/RS
ROV to connect the transfer sling to the crane at 250t ROV hook.
If necessary, engage crane heave compensation mode.
Take up tension until the main crane takes all the load of Hammer
and Follower and transfer sling becomes slack.
ROV to disconnect Hang-off pennant rigging at the 250t ROV
hook.
4.6.3 Task #6 Equipment
Quantity
Equipment List Check+
Use Spare
Refer to Drg. No. R_000598, Hammer and Follower Deck Lifting Arrangement
1 1
Refer to Drg. No. 4059-XG-00279817, Pile Hammer & Follower Deployment Rigging
Arrangement
1 1
Attached References
Task Plan
Document Number Description
Specific Ref.
4059-XE-00278596.001 Mooring Pre-Installation Deck Layout 6.1, 6.2, 6.3
Hammer and Follower Deck Lifting
R_000598 6.1, 6.2, 6.3
Arrangement
Pile Hammer & Follower Deployment Rigging
4059- XG-00279817 6.1, 6.2, 6.3
Arrangement
Pile Hammer & Follower Deployment
4059-KA-00213943-SK-300 6.1
Storyboards
4059-KA-00213943-SK-300 Piling Stack-Up Details 6.1
TSB-SO-LP-004 Lift Plan – Pile Hammer & follower Lift and 6.1
Deployment
4059-MB-00286266 Piling Hammer Operations Manual 6.1, 6.2
Page 51 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Operational limitations
Piling is not a weather sensitive operation, however the pile hammer will need to be recovered
on completion or suspension of piling whereby the limits noted in Task #6 will govern activities.
Other Information
Lift weight – Pile Hammer & Follower: Static (in Water): 85.7t Dynamic (in Water): 90.5t
Distribution
Copy No Copy No
OM Offshore Manager DP DP Operator
SS Shift Supervisor SR Surveyor
PE Project Engineer RS ROV Supervisor
FE Field Engineer CR Client Representative
DF Deck Foreman SC1 Subcontractors Representative
CD Crane Driver SC2 Subcontractors Representative
Page 52 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
5. Check chain catenary and route is hanging toward the opening of the SS/RS
pile guide mud-mats.
Page 53 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Note: If the pile penetration after stabbing hammer & follower is more
than 10m (i.e. main mooring pile padeye is below seabed level), ROV
8. SS/RS
to cut free the LCS chain which is attached by an Ø16mm wire sling
and 3.25t shackle to the upper padeye prior to starting piling
operation.
Start pile driving with a low blow rate and energy level, continue
monitoring pile verticality while gradually increasing the blow rate and
energy level until the hammer and pile are stable.
Refer to Section 2.4.5.
ROV to maintain visual to estimate pile penetration and verticality at
all times during piling operations. SC2/SS
9.
Notify piling contractor of pile penetration at 0.25m intervals so
they can input to their running log (refer to step below).
Note: ROV should maintain a suitable clearance from the pile
hammer when it is operating to minimise effects of percussion.
Refer to the following documents:
Piling Hammer Operations Manual, 4059-MB-00286266
Record a running log of all pile driving operations throughout the
piling process, as a minimum the following will be recorded via the
pile control data logger:
Project Name & Date
10. Pile Identification / Position SC2
Running Time
Blow Energy
Blow Count
Penetration log
Events or anomalies
Maintain slack on umbilical hoses and control cable and ensure
rigging remains clear of hammer and guide frame. Crane operator to SC2/
11. ensure that the crane also comes down in 0.25 increments and that SS/RS
sufficient slack is maintained in the rigging, 1x ROV observing slack
and 1x ROV observing markings.
12. Continuously monitor chain catenary and route is hanging toward the SS/RS
opening of the mud-mats using ROV.
Page 54 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 55 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Quantity
Equipment List Check+
Use Spare
IHC Piling Spread 1 0
Attached References
Task Plan
Document Number Description
Specific Ref.
Pile Hammer & Follower Deployment Rigging
4059-XG-00279817.001 7
Details
Pile Hammer & Follower Deployment
4059-KA-00213943-SK-300 7
Storyboards
Lift Plan – Pile Hammer & follower Lift and
TSB-SO-LP-004 7
Deployment
DR-0607-186-100-1 84” Slotted Frame General Arrangement 7
Page 56 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 57 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 58 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Quantity
Equipment List Check+
Use Spare
N/A 0 0
Attached References
Task Plan
Document Number Description
Specific Ref.
N/A
Page 59 of 66
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 60 of 66
PREPARATION OF CHAIN & CONNECTION TO PILE
PILE/CHAIN CONNECTING
PLATFORM
GOAL POST LCS BEING PULLED
BY TUGGER
UNDERNEATH PILE
CHAIN CHUTE
TUGGER WINCH
WINCH WIRE
LCS
S-280 HAMMER
UMBILICAL WINCH
1m
DECK TUGGER
3.25Te SHACKLE
GYPSY WINCH
WORK PLATFORM
29th - 30thCHAIN LINK
CHAIN CHUTE
GOAL POST
14.8m
17.2m
12.5m
HYDRAMARINE
ARINE
HYDRAM
85 Te SPREADER BAR
2m
LIFTING
HEIGHT 22.9m RIGGING HEIGHT 5.4m
85 Te SPREADER BAR
22.9m RIGGING HEIGHT 13.8m
28m
20.3m
HYDRAMARINE
HOOK HEIGHT (METRES)
30m
21.5m
HYDRAMARINE
TYPICAL HOOK HEIGHT
23.6m
CoG
OMITTED FOR CLARITY
CoG
SEABED, APPROX. EL-95m(MSL)
HOOK HEIGHT (METRES)
12m
PILE HAMMER LIFT/UPENDING RIGGING DETAILS
HYDRAMARINE
PILE HAMMER LIFT AND FOLLOWER ASSEMBLY-DECK LIFTING
C.O.G 5433
2450
FREEBOARD
2820
3000
PILE HAMMER + FOLLOWER
INSTALLATION OF FOLLOWER
2454
FREEBOARD
3000
C.O.G 11402
6202
PILE HAMMER + FOLLOWER
LIFTING OF ASSEMBLY
12583 10513
FREEBOARD
3000
200 (TYP.)
12202
PILE HAMMER + FOLLOWER
OPERATING POSITION
PILE HAMMER AND
FOLLOWER ASSEMBLY
DECK LIFTING
SLEEVE
DEPTH
PILE HAMMER + FOLLOWER
2217
UPRIGHT POSITION FOR DEPLOYMENT
FREEBOARD
3000
200(TYP)
8063
5063
589
1689
6202
OVERHANG (STORAGE)
6000
12202
OVERHANG (OPERATING)
ARINE
HYDRAM
CoG
HYDRAM
ARINE
PILE HAMMER DEPLOYMENT STEPS:
1. STAB HAMMER C/W FOLLOWER INTO PILE & ROV TO MONITOR
PENETRATION.
2. LOWER OFF CRANE, BUT MAINTAIN MINIMUM AMOUNT OF SLACK.
3. UMBILICAL & CONTROL CABLE CATENARIES TO PROVIDE AND MAINTAIN
SUFFICIENT SLACK DRIVING PILE OPS.
4. CHECK CHAIN CATENARY AND ROUTE IS HANGING TOWARDS THE
5m
OPENING IN PGF.
HAMMER
5.4m FLUSH MARK
6
12.8m
5.4
5
(TYP. INCREMENT)
6
5.4
3 5
6.8m
4
PAINT TEXT ON FOLLOWER 3
250
BOTH SIDES 2
2
482
1000
5.4m
50
25m
PGF SEABED, APPROX. EL-95m(MSL)
16.8m MAX.
METER MARKING ON
6.5m MIN.
FOLLOWER
8.4m MAX.
2.8m MIN.
25m
SELF PENETRATION PENETRATION WITH HAMMER FULL DEPTH
(ESTIMATED) (ESTIMATED) PENETRATION
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 61 of 66
klTbpW
N. clo dbkboAi fkclojATflkI pbb atd. ko. NTO4-Ami-v-uu-AA-pMMNNVRS L
4MRV-oA-MMOPPNPR.
oev. aate oeason for issue L oef. aCk ko. lriginator Checked Approved
This drawing has been signed by an blectronic aocument janagement pystem. then printed it is considered as a for information only copy. The controlled copy is the screen
version and it is the holderDs responsibility that heLshe holds the latest valid version.
aateW aesignW jethodW cormatW pcaleW
AB LAoo
oeference dwg.W
AN klTba
RM P
X peKO
A peK O A
QRM UR H- M
N
EnONPPISF
NORM
VM QR
a
OM EOMF EOMF
a NTM
oNM
NN4 oN
M
OM
NM
oRRR
PV
EQSRPF
oO
OMM
a
M
g
oNP
g
QMM
S
fkpmK CATK fff
SMM
B B
ROM
a
klTbpW
HN
ØTS - M
Tl Bb ifkbBloba
ØOOM
UMM
QMM
NOIR
AcTbo cfkAi tbiafkd M NNS NK clo dbkboAi fkclojATflk pbb Ami atdKkoK
NMM NNP oN NTOQ-Ami-v-uu-AA-pMMNNVRS L QMRV-oA-MMOPPNPR K
i fc
Tfk
dp OK Aii tbiap Tl eAsb crii mbkbToATflk rKkKlK
if k
d
oOPV ORM
OMM
oRRR NM PK Aii tbiap Tl Bb fkpmbCTflk CATbdlov II rKkKlK
N fkpmK CATK f a
-
OM
QK Aii badbp Tl Bb olrkaba jfkK OmmK
a a aETAfi J 4
OM E N W OM F RK fTbj NMMI peAii Bb CebChba AdAfkpT iAjfkATflk cAfirobI
NO
C fk Ak AobA lc OMMmm colj bACe pfabp lc mAabvb miATbpI fTbj NMQ Aka NNPK C
fkpmK CATK f
ERMF OOM S M°F TK mfib AkCelop peAii klT Bb ClATbaK
k
Ejf
NO
NSMMM a
EoN a
MSS
IUF
TVUV
oN
a a
M
ETYP O iOCKF FOo peAChiE CoOpBY TYPEJONPM
E N W NM F tii RRT
ENWRF
M
oN
a a
pECTfON gJg
Aii EadEp oOrNaEa oNM
a
E N W OM F
ORMMM
NM
oO
R Tv
a
m
EORMMMF
CKOKdK
NMM
RM
g g
OM
a
E NOQ O fMMMUTMQ pbClkaAov lofbkTATflk miATb ABp Ae PS miK QM VQ kg E
EØOMPPISF NOP fTbj objlsba
NOO Q fMMMUMSN miATb ABp Ae PS miK OM P kg
A A EØONPPISF NON O fMMMUMSM miATb ABp Ae PS miK OM S kg
peK O peK O NOM O fMMMTUTT mfk obCbmTACib ABp be PS miK NMM N kg
NNV O fMMMSNPR miATb a ABp ae PS miK OR PM kg
a h NNU O fMMMROON mfmb Amf Riu RO lKaKPRRISuOPIU OS kg
peK O NNT U fMMMSUNR miATb ABp Ae PS miK NM S kg
pECTfON FJF a
NNS N
NNR
fMMMSTSP mofjAov lofbkTATflk miATb
fTbj objlsba
ABp Ae PS miK QM QS kg
g NMO
NMN
fTbj objlsba
fTbj objlsba
TIO° Tvm
NOMM
mAoTp ifpT
oeferenceW cmr - mfib AkCelo - jAohfkdW
M
all burrs
ORM R Coated accKtoW kKAK
purface roughnessW Tolerance when not specifiedW ptandard referenceW cabrK ppecK koKW teightW
Q
Tvm oa jachiningW kp-fpl OTSU-mh teld symbolsW kp-fpl ORRP NTOQ-Ami-C-pA-MMMN L STOU4 hg
PRMM
fpl
teldingW kp-bk fpl NPVOM BLc
d QMRV-pA-MMONMMSQ d
QO°
fp NPMO EµmF
F F CastingW kp-fpl UMSO-CTNP
Client arawing koK oevK
Bt Offshore
A
R QMRV-ud-MMOPPNVQKMMN
Tvm a
EQPQTF
h En
pingapore PteKitd NKAK JJ
ONP
Y Q PIS a NTKMUKOMNN ClkpTorCTflk Aol Aol mAsb
F f Q A
--
TvmK P ilCK
C MPKMUKOMNN ClkpTorCTflk Aol Aol mAsb
NNT
B MNKMTKOMNN ClkpTorCTflk pli pps mAsb
E E
TRM
oevK aate oeason for issue L oefK aCk koK lriginator Checked Approved
This drawing has been signed by an blectronic aocument janagement pystemK then printed it is considered as a for information only copyK The controlled copy is the
screen version and it is the holderDs responsibility that heLshe holds the latest valid versionK
aateW aesignW jethodW cormatW pcaleW
NQKMNKOMNN AB L Aol
oeference dwgKW AN N W RM
rKkKlK
NATIONAL OILWELL VARCO
Pa-jodel
a
sfEt Y cmr - mfib AkCelo jAohfkd
e E N W RM F APiä APi Norway Ap e
FPU - PILE ANCHOR - MAIN STEEL
pfaE sfEt
Article koK L oevK
pECTfON EJE aETAfi J O
klT Tl Bb obmolarCba AkaLlo jAab
AsAfiABib Tl A Tefoa mAoTv tfTelrT
cABofCATflk lro tofTTbk ClkpbkT IMMMROM9LU
E N W OM F E N W NM F oeplacemK forW mroject faW lriginatorW aiscW TypeW Ami AreaW oevK pheet
arawing faW
TR
oO
ØPRRIS
fkpmKCAT f
OPIU
P pfabp
OM
oO
e e
RM
RM
oQ
PM
ESRMF
RM
PM
oQ
oQ
EPMMF
OM
PMM
TMM
oPRM
NMPR
B NNV B
NNU
RRR
EPORF
NON
EOMMMF
NNNM
OMTM
oT
NNNM
R
NM4
d HM
NPMM
NTM - O
aETAfi J P
oQ M oPR NMS PM oEFK peK N E N W OM F
PM oPR
RM
M oQ
pECTfON dJd
RM
RM
NMR E N W OM F
TM
fkpmKCATK f
OM TvmK P pfabp
a
C NR C
fkpmK CATK f Q
PPN
NR
MIR
a nU H-
M Teor
nRS `N
NOO
O u QR°
TOV VM
pECTfON eJe
pECTfON CJC E N W NM F
ØUM
ENRMMF E N W OR F S
a a
NOM
PR
TM
ENTMF
E E NWR F E
EnRRMF
QOSIS QMSIU
a fkpmK CATK f
a
a EnUMF a
I SF
NUM°
PP
NM
ON
fkpmK CATK fff
En
ENOPSIUF
ENRF
F fkpmK CATK f F
QR°
C
HM
NVM - N
ENMMF
ENVMF
B
NMM
QR
EOMF
PM
EOQTPISF
CKOKdK
B B
NWQ
j Q B
ENOPSIUF
TvmK P ilCK
NMV
QR°
NR
C fkpmK CATK f
HN
ØNUR - M a
d d
PM
ifkbBloba AcTbo
cfkAi tbiafkd
a fpOMETofC sfEt
ENPNSISF ENTSSIUF E N W TR F
pECTfON hJh
NOKR
EPMUPIQF oEFK peK N E N W OR F FOo TABiE OF oEsfpfONp ANa NOTEpI PiEApE oEFEo TO peEET NOK NK
Client arawing koK oevK
nQMM
sfEt X Bt Offshore lperator arawing koK
QMRV-ud-MMOPPNVQKMMN
oevK
A A
B B
klTbpW
NK clo dbkboAi fkclojATflk pbb Ami atdKkoK
NTOQ-Ami-v-uu-AA-pMMNNVRS L QMRV-oA-MMOPPNPR K
C C
SM°
nRP
OSIR
MIR
elib nU H- M
R u QR°
TvmK
a a
E E
RNM
OVM
UM UM UM RM R
N00
F F
PM°
U NTOQ-Ami-k-ud-jp-pMMNNVMT L QMRV-ud-MMONMMSUKMMN
CATK C oemove NMN
oO M
all burrs
Coated accKtoW kKAK
purface roughnessW Tolerance when not specifiedW ptandard referenceW cabrK ppecK koKW teightW
fpl oa jachiningW kp-fpl OTSU-mh teld symbolsW kp-fpl ORRP NTOQ-Ami-C-pA-MMMN L R hg
teldingW kp-bk fpl NPVOM BLc
d fp NPMO EµmF CastingW kp-fpl UMSO-CTNP QMRV-pA-MMONMMSQ d
N0O Client arawing koK oevK
oevK aate oeason for issue L oefK aCk koK lriginator Checked Approved
This drawing has been signed by an blectronic aocument janagement pystemK then printed it is considered as a for information only copyK The controlled copy is the
screen version and it is the holderDs responsibility that heLshe holds the latest valid versionK
aateW aesignW jethodW cormatW pcaleW
OOKMSKOMNN AB L pli
oeference dwgKW AN NWO
rKkKlK
NATIONAL OILWELL VARCO
Pa-jodel
cmr - mfib AkCelo AppbjBiv
e APiä APi Norway Ap e
FPU - PILE ANCHOR - PIN klT Tl Bb obmolarCba AkaLlo jAab Article koK L oevK
AsAfiABib Tl A Tefoa mAoTv tfTelrT
cABofCATflk lro tofTTbk ClkpbkT IMMMMOPMLM
oeplacemK forW mroject faW lriginatorW aiscW TypeW Ami AreaW oevK pheet
arawing faW
A A
A
NMM
QORP
E N W NM F
N
-
B fpl=sfbt==EkKTKpF B
klTbpW
EUMMF
QR°
klTb=R =
NK==clo=dbkboAi=fkclojATflk=pbb=Ami=atdKkoKNTOQ-Ami-v-uu-AA-pMMNNVRS=
=========================================================================================QMRV-oA-MMOPPNPR
=
OK=jAohfkdp=Tl=Bb=Ap=cliiltpW
ERMF
====-=jbTbo=jAohfkdp=Tl=Bb=RMMxRMmm=AT=VM°=fkTbosAipK
====-=eAic=jbTbo=jAohfkdp=Tl=Bb=ORMxRMmm=AT=VM°=fkTbosAipK
ERMM=L=ORMF ====-=jbTbo=krjBbop=Tl=Bb=OMMmm=efde=AT=VM°=fkTbosAipK
klTb=O ====-=clkT=AofAi
====-=Clilro=tefTb=oAi=VMMO
C = C
aETAfi - O PK=ifcTfkd=mAabvbDp=EO=lccF=Tl=Bb=jAohba=tfTe="pti=RRt"=Ap=peltk=EBlTe=pfabpFK
TYP Aii METEo MAohfNdp ====TbuT=ebfdeT=W=TRmm
E N W NM F =====Clilro========W=tefTb=oAi=VMMO A
=====clkT==============W=AofAi
=
=
A
O =
-
=
NMOQT
VM ENPMF RK=A=ifkb=Tl=Bb=mAfkTba=lk=AkCelo=Aifdkba=tfTe=mAabvbp=Ap=peltkK
====Tefp=Tl=fkafCATb=lofbkTATflk=lc=mAabvbp=AcTbo=mbkbToATfkd=pbABbaK
====Clilro=tefTb=oAi=VMMOK
klTb=P =
=
a A = a
=
TK=Aii=jAohfkdp=Tl=Bb=ACCloafkd=Tl=bmluv=dbkbofC=pvpTbj=Ap=mbo
X ====NTOQ-TC-mof-Ami-MMMRK=obpT=lc=AkCelo=Tl=Bb=ibcT=rkClATbaK
EORMMMF
A A
=
=
=
EPURF
A
A
EOMPQTF
E E
TR
EOMMMF
A
aETAfi - N
TYP O iOCK
E N W NM F
OVRP
F F
QR°
A
Ekl x=VM°
=OF
A
EVMMMF
Tb
NMM N fMMMROMV cmr=-=mfib=AkCelo=-=jAfk=pTbbi Ami = = STOUQ=kg
EUMMF
Q=
ftem nTv Article=noK aescription ptandard jaterial aimension hg=L=each
mAoTp=ifpT
oeferenceW cmr=-=mfib=AkCelo=AppbjBiv
NTOQ-Ami-k-ud-jp-pMMNNVMTLQMRV-ud-MMONMMSUKMMN NMM
Coated=accKtoW ===============klTb=T
purface=roughnessW Tolerance=when=not=specifiedW ptandard=referenceW cabrK=ppecK=koKW teightW
A
fpl oa jachiningW==kp-fpl=OTSU-mh teld=symbolsW===kp-fpl=ORRP NTOQ-Ami-C-pA-MMMN STO84
teldingW=====kp-bk=fpl=NPVOM=BLc = hg
d fp=NPMO EµmF CastingW======kp-fpl=UMSO-CTNP QMRV-pA-MMONMMSQ d
EQPQTF
Client=arawing=koK oevK
Bt Offshore QMRV-up-MMONMMTNKMMN=
PVQT
lperator=arawing=koK oevK
pingapore PteKitd NKAK = -= -
Z
A NTKMUKOMNN ClkpTorCTflk Aol Aol mAsb
RMM
TypK
°
N MSKMRKOMNN fkclojATflk swA Aol mAsb
NMMM
Z c= djb
RS
TypK
l
= b
N T° NT° Tbo d=p oevK aate oeason=for=issue=L=oefK=aCk=koK lriginator Checked Approved
k fk =This=drawing=has=been=signed=by=an=blectronic=aocument=janagement=pystemK=then=printed=it=is=considered=as=a=for=information=only=copyK=The=controlled=copy=is=the=
Cb oh =screen=version=and=it=is=the=holderDs=responsibility=that=heLshe=holds=the=latest=valid=versionK
jA aateW aesignW jethodW cormatW pcaleW
MOKMRKOMNN AB=L= swA
oeference=dwgKW AN N=WRM
rKkKl
NATIONAL OILWELL VARCO
RM EØONPPISF = Pa-jodel
EobCbmTACib=nRSF
fTbj AoTfCib=koK aoAtfkd=koK
NMM fMMMSUQQ NTOQ-Ami-k-up-jp-pMMNNVMS
NMN fMMMMOPM NTOQ-Ami-k-up-jp-pMMNPORP
ifcTfkd=Torkkflk
dobApb=t=L=pTABroAdp=kBr=NOh
EØPRRISF
A CLt=olmb=Aka=jlkhbvDp=cfpT A
Emfk nRP=F
N0N
N0O B
ENORMF
clo=oKlKsK=objlsAiK Elo=pfjfiAoF
EPMMF
pbb=klTb=OK
B
O
--
EØUMF
EQSRPF
B Emfib=tAii=nONPPISF B
N
-
aETAfi - O pECTfON B-B
B E N W N0 F E N W N0 F fpl=sfbt==EkKTKpF B
klTbpW
=
NK==clo=dbkboAi=fkclojATflk=pbb=Ami=atdKkoK=NTOQ-Ami-v-uu-AA-pMMNNVRS
q
ENQNSIU=-=colj=======F ===========================================================================================QMRV-oA-MMOPPNPR
=
OK=o-Cifm=Tl=Bb=jAab=Bv=cABofCATlo=EklT=A=mroCeApbaI="pTAkaAoa=CljmlkbkT"
====obcbobkCb=fp=jAab=Tl=afk=pTAkaAoa=NNMOQFK
=
= B
=
C C
ENSMMMF
ENVMF
ETVUU=-=CldF
EØNURF
EØQMMF
N00
a pECTfON A-A a
Cld
Y
EORMMMF
EOPTRMF
q
ENOUSIS=-=colj=====F
ENOMMF
E E
A A
B
EUMNO=-=CldF
pbClkaAov=lofbkTATflk
EQMMMF
miATb
aETAfi - N
TYP O iOCK
B
F F
B
ENOMMF
teldingW=====kp-bk=fpl=NPVOM=BLc
d fp=NPMO EµmF CastingW======kp-fpl=UMSO-CTNP QMRV-pA-MMONMMSQ d
mofjAov=lofbkTATflk Client=arawing=koK oevK
q
aateW aesignW jethodW cormatW pcaleW
MQKMRKOMNN AB=L= swA
oeference=dwgKW AN N=W=OR NATIONAL OILWELL VARCO
EORMF EnONPPISF = Pa-jodel rKkKl
DC
14 -
By Steve Wight at 7:04 pm, Oct 12, 2011 By Bancha Onthaworn at 4:03 pm, Oct 12, 2011
APPROVED
By 103920swi at 6:08 pm, 8/26/11
REVIEWED
By 103920bon at 5:47 pm, 8/26/11
APPROVED
By 103920swi at 6:16 pm, 8/26/11
REVIEWED
By 103920BON at 10:38 pm, 8/24/11
APPROVED
By 103920swi at 6:07 pm, 8/26/11
REVIEWED
By 103920bon at 5:48 pm, 8/26/11
APPROVED
By 103920swi at 6:09 pm, 8/26/11
REVIEWED
By 103920bon at 5:45 pm, 8/26/11
APPROVED
By 103920swi at 6:09 pm, 8/26/11
REVIEWED
By 103920bon at 5:42 pm, 8/26/11
APPROVED
By 103920swi at 6:10 pm, 8/26/11
REVIEWED
By 103920bon at 5:43 pm, 8/26/11
APPROVED
By 103920swi at 6:07 pm, 8/26/11
REVIEWED
By 103920bon at 5:58 pm, 8/26/11
S. W S. W
Te . Te .
55
55
L.
L.
85 Te SPREADER BAR
L.
L.
. .
55
55
Te S.W Te S. W
S
Te . W.
55
L.
12 Te S.W.L.
L.
.
55
Te S. W
APPROVED
By 103920swi at 5:22 pm, 9/20/11
REVIEWED
By 103920daya at 5:07 pm, 9/30/11
APPROVED
By 103920swi at 10:25 am, 10/3/11
Project: FPU for Terang Sirasun Batur Field Doc. No
Document Title : Mooring Pre-Installation Procedure 4059-KA-00213943, Rev. 0
Page 62 of 66
TASK COMPLETION CERTIFICATE
TSB-SO-
WORKSITE: Main Installation Vessel (Southern Ocean) CERT No:
TCC 001
TASK
DESCRIPTION:
Reference Management of Change
As-Built Data:
Comments:
Page 63 of 66
13/10/2011 TSB-SO-DS-001 Mooring Line Component Identification Record
TSB PROJECT
Notes 1 1 1 1 1 1 1
1
2
3
4
5
6
7
8
9
10
11
12
Page 64 of 66
BW Offshore Pte. Ltd. TSB Project
Activity
Anchor Shackle Connection Visual Inspection
1 TSB Field 4059-RA-00213943 Task Plan 3.2 completed as per H R
Between Pile and LCS Chain TSB-SO-DS-001
Procedure
Activity
Pile driven to target depth, within Survey Log
2 TSB Field 4059-RA-00213943 Task Plan 7 completed as per H R
target box TSB-SO-DS-002
Procedure
Activity
H-Shackle Connection Between Visual Inspection
3 TSB Field 4059-RA-00213944 Task Plan completed as per H R
LCS and UCS Chain TSB-SO-DS-001
Procedure
Legend:
Note: Lift Plans shall be provided an updated offshore in accordance with Sub-Contractors system.
Page 65 of 66
Lift Plan
(To be reviewed by a Competent Person*)
Weight of lift: (Note: Provide submerged load information if the load is to be deployed subsea)
Static Load: Dynamic Load: Static Load (Submerged): Dynamic Load (Submerged):
Ship / Barge / Worksite: Location (Deck, Quayside, Subsea): Risk Assessment No:
Routine Lift: (General lifting operations) Non-Routine Lift: (Specific lift operation or lifts 10 Te)
Possible Considerations (not exhaustive): (tick if relevant and address each point in ‘Step-by-Step’ section below)
Weight of load not defined Lifting of chemicals Large / limited hook height
High centre of gravity Load on pallet requires securing Dynamic factors involved
Stability of load Certified & correctly installed rigging Hazards to personnel
Awkward size / shape / sharp edges Restricted / confined work area Clear communications
No dedicated rigging No lift point above load Tag lines, tugger lines
No dedicated lift points Crane power / fuel levels checked Adequate lighting
Seafastening removed? Vessel ballast & fuel in accordance with stability calculations
Pre-Lift Checks: (If you answer No to any question below, explain in the ‘Step by Step’ section below) Yes No N/A
1. Has a HAZOP and TBT been completed, is a Permit to Work in place (where required)?
2. Is the lifting arrangement Certified, and sufficiently strong, stable and suitable for the proposed use?
3. Has the rigging been visually examined by a Competent Person* to check it is fit for purpose?
4. Is the load path and landing area clear of obstructions?
5. Is the landing area adequate in terms of size and load bearing ability?
6. Is suitable packing available for protection of load and adjacent equipment?
7. Have barriers been positioned to prevent access by unauthorised people?
8. Have you confirmed that the laydown area is within the operating limits / radius of the crane?
9. Have weather conditions been considered with regards to the safety of the lifting operation?
10. Will the crane driver be able to see the banksman throughout the operation, or have another suitable
means of communication been checked and made available (e.g. radios)?
Rigging list: (Note: Alternatively refer to the relevant Rigging Arrangement drawing, and attach to the Lift Plan)
Step by Step details of lifting operation: (Note: Alternatively refer to the relevant Task Plan, and attach to the Lift Plan)
(Additional information or sketches can be provided on the back of this sheet if required)
Manning: (Tick the appropriate boxes and specify the number of people required for each selected position)
Banksman No. Rigger No. Lifting Technician No. Support Engineer No.
Planned by: Job Title: Sign: Date:
* The Competent Person must be deemed competent by virtue of attaining the appropriate theoretical and practical knowledge in
terms of the activity to be performed. This will be a combination of experience, training and qualifications
Page 66 of 66
Subject:
IHC Hydrohammer S280 spread – (rigging) Drawings
Project:
4059
TSB Field Development Project
Date:
04-08-2011
1
187,2
4,67
4,4 Ton
R 79 6
6,14°
3 06
,7
7 ,4
8532
7964,6
25,42°
4
14,63°
,1
7712
7850
7
20,8° 20,8°
20,23° 20,23°
Total weight 14665,6 kg
Hydrohammer bv Drawn : NT
P.O. box 26 Date : xx-xx-xx
2960 AA Kinderdijk
Holland Appr. :
2838,26 2838,26 Ref :
r-00411
Phone:++.31.078.6910302 Fax:++.31.078.6910304 Email:info.hh@ihcmerwede.com
Hydrohammer S-280 30 T
Sleeve 86” 17 T
Anvil 13 T
Follower 84” 38 T
Total weight 98 T
Submerged weight 86 T
(during lowering/lifting)
10T
90T
Sling
L= 16000 98T
Sling
L= 11500
14045
39,7°
4,1°
O 915
Shackle
WLL 35T
15,5T 23,6T
2952
15,5T
23,6T
13714
30,9T 47,1T
Total weight 74,8T
L= 10000 L= 9626
20° 13°
10321
3768
Softsling Softsling
4 31
L= 11000 L= 11000
WLL 22 T 35,8° WLL 41 T
35,3°
5629
O 2130
2184
O 2140
C.O.G. 4705
7179
9000
0
160
11,69° 11,69°
Hydrohammer bv Drawn : NT
P.O. box 26 Date : 270209
2960 AA Kinderdijk
1940 Holland Appr. :
Ref :
Transport cradle h=2890 r-00423
Phone:++.31.078.6910302 Fax:++.31.078.6910304 Email:info.hh@ihcmerwede.com
Hydrohammer S-280 30 T
Sleeve 86” 17 T
Anvil 13 T +
Total weight 60 T
27T 60T
40T
Sling
L= 13581
Sling
L= 11500
13361
°
31,2° 20,3
Shackle
WLL 120T
O 915
Shackle
WLL 35T
22T 38T
22T
Softsling Softsling
0
420
420
L= 11000 L= 11000
0
3305
O 2140
C.O.G. 5433
7560
12230
267
Length grommets
WLL 55T
2288
15
334
23096
340
40
B Top of pile
DETAIL A
12235
5500
C
6 8
3230
SEABED
O 2133,6 OD pile 84"
50
DETAIL B DETAIL C
P.O. Box 26, 2960 AA Kinderdijk
The Netherlands
IHC Hydrohammer B.V. Phone: +31 78 691 03 02
Fax: +31 78 691 03 04
Email: info.hh@ihcmerwede.com
Title: Drawing no: Drawn: KCh Date: 26-07-2011
S-280, 86" sleeve 84"follower V_001277 Appr.: RSM Date: 29-07-2011
1 2 3 4 5 6 7 8
Revisions
Issue Description Drawn Date Checked Date
A A
(O 2200 )
(O 2140 )
(O 2130 )
B B
8
6
A 3230
C 12230
C B C
SECTION A-A
86109012 86109012 335 40
X_000384 Total weight 37857.0 kg
DETAIL C X_000384 2 D-shackle WLL 55 - 44.3 kg
1:20 86109012 2 Socket head screw DIN 912 M30x100 NEN-ISO 898-1
-U130
1.8 kg
Project:
4059
TSB Field Development Project
Date:
22-07-2011
Data sheet IHC Hydrohammer B.V.
Hydrohammer® S-280 sheet no. : 1.1.0103
revision : 2
date : February, 2010
page : 1/1
Operating data
Max. net energy/blow 280 kNm
Min. net energy/blow 28 kNm
Blow rate (max energy) 45 Blows/min
Weight
Ram 13,6 tons
Hammer (incl. ram, in air) 30,5 tons
Hammer (incl. ram, in salt water) 23,9 tons
(Only if fully submerged)
Hydraulic data
Operating pressure 310 bar
Max. pressure 350 bar
Max. oil flow 750 l/min
Safety setting
Cap 40 bar
Hose connections
Oil supply 2” hose (P) M68x2 male
Oil return 2” hose (R) M68x2 male
Nitrogen to cap (CA) M42x2 male
Main dimensions
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Sleeve, for piles Ø 2160, 84" sheet no. : 4.1.005850
revision : 1
date : January, 2010
page : 1/1
Weights
- Connection ring 4100 kg
- Conductor sleeve 13100 kg
- Anvil 13400 kg
Total 30600 kg
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Up-ending frame sheet no. : 9.2.0170
revision : 1
date : July, 2010
page : 1/1
APPLICATION: Offshore support and outboard tilting to the vertical of Code no. 86 18 35 00
Hydrohammer®, type S-200/280 with 72" sleeve and ballast
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
1,1 Ton
1,1 Ton
4000
0
160
11,69° 11,69°
Hydrohammer bv Drawn : NT
P.O. box 26 Date : 270209
2960 AA Kinderdijk
1940 Holland Appr. :
Ref :
Transport cradle h=2890 r-00423
Phone:++.31.078.6910302 Fax:++.31.078.6910304 Email:info.hh@ihcmerwede.com
Data sheet IHC Hydrohammer B.V.
Water cooled Hydraulic power pack sheet no. : 2.2.0012
P-750W revision : 4
date : January, 2005
page : 1/3
Code no. 86 40 00 13
APPLICATION: Hydraulic power supply for Hydrohammer® types S-200/250/280. S/N’s.: 2.2.0750.D01/D02
Water cooled hydraulic power pack. Dealer information; page 1/3
Integral compressed air system for:
-setting and maintaining of cap pressure during underwater
piling applications,
- internal water displacement of sleeve,
- emptying hydraulic hoses to the reservoir.
Approved lifting equipment Steel wired four leg sling and green pin shackles (4x)
Weight, air vessels in frame approx. 1.800 kg, (air vessels at atmospheric pressure)
Weight, including fuel and oil approx. 19.000 kg, (air vessels in frame excluded)
Weight, excluding fuel and oil approx. 13.000 kg
Hydraulic pump 6 pump heads, diesel engine driven delivering 750 l/min at maximum
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Water cooled Hydraulic power pack sheet no. : 2.2.0012
P-750W revision : 4
date : January, 2005
page : 2/3
Code no. 86 40 00 13
IHCFE RENTALS: serial no’s.: 2.2.0750.D01/D02
Additional information; page 2/3
Hydraulic pump,
Make / model Poclain / PL6H20 FOR, 74 cc/rev / 6 pump heads
Rated Capacity 750 l/min / 350 bar
Capacity Control 0 / 50 / 100 %
Diesel engine
Make / model / type Cummins / KTA19 G4 / 4 stroke cycle, 6 cylinder in line,
(water-cooled, turbo charged after-cooled aspiration)
Rated Output 507 kW (at 1900 rpm)
Cooling system Closed loop coolant, coolant-sea water heat exchanger
Engine control
Engine control panel A-61, fixed inside power pack
Engine remote control panel B-61, for remote engine control outside power pack
Capacities
Fuel tank approx. 2000 litres
Hydraulic oil reservoir approx. 6000 litres
Certified air vessels 400 litres (3x)
Connections
Hydr. press. & return hose M68 male (2x)
Air hose M42 male (1x)
Leak oil hose (Vibrator) M36 male (1x)
(Sea) cooling water hose Storz LM 81mm (2x)
Electric connections
400Vac/50 Hz or 440Vac/60 Hz CEE form wall socket, 64A, 3ph+N+GND male
230Vac/50 Hz or 60 Hz CEE form wall socket, 16A; 1ph 2 pin+GND male
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Water cooled Hydraulic power pack sheet no. : 2.2.0012
P-750W revision : 4
date : January, 2005
page : 3/3
Code no. 86 40 00 13
IHCFE RENTALS: serial no’s.: 2.2.0750.D01/D02
Internal information; page 3/3
Engine fuel
Pre filter 86 47 90 03 Fleetguard / FF 105 D (2x)
Water separator 86 40 92 39 Separ / 2000/10-01030
Aeration
Breather filter 86 40 91 22 Internormen / 01.NBF85.3VL
AIR CIRCUIT:
Compressor air
Air filter 86 40 92 36 type Knecht, AG229
Compressor lube oil
Lube oil filter 86 40 92 35 type Mann, W920
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Equipment Manual
Data sheet sheet no. : 3.7.0041
Hydrohammer B.V. 10Ft storage cabin revision :1
Hydrohammer® date : December, 2005
APPLICATION: Container, used for storage of spare parts and tools Code no.: 86.18.00.01
S/N. 6518
Container
- Max weight : approx. .......................8000 kg
- Dimensions lxwxh : .............3000x2450x2430 mm
- Type : container, w. pad eyes on top
Basic provisions and energy consumption
- Heating : ................................... 2000 W
Handling
- Lifting provisions :
- Lifting eyes : ...................................Four (4)
- Hole diam. : (cabin roof) ............. Ø29,5mm
- Lifting equipment :
- One 4-legged steel wire rope sling, . WLL 5,6 tons
L=3,6m, diam. Ø14mm
- Four shackles, green pin type, ........ WLL 6,5 tons
Power supply
Required : 230Vac/16A (50Hz or 60Hz)
2-p + earth
Mains wall sockets : ....................acc. CEE form 6h
230Vac/32A (50Hz or 60Hz)
2-p + earth, 3x 4mm2
Pos. Description
1 Tube light
2 Heater
3 Workbench
4 Wall socket (2x)
5 Rack
6 Power supply
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
Indicator LEDs
Indicating instruments
Controls
S1 Power OFF / ON
S3 Air to cap (when button is pushed)
S4 Cap pressure 0-50 / 0-150 bar
S2 Air to sleeve (H - 0 - A) (manual / automatic)
Box
Make / type ELDON / ASF4032
Weight approx. 10 kg
Dimensions l x w x h 400 x 300 x 210 mm
Cable connectors
No. 35 48 p Burndy (with dust cap) female, for connection with C-32 (C-34 Only with reducing cable
86 66 20 49)
No. 36 9 p AMP (with dust cap) male for connection with P-32-A
®
No. 34 16 p Walther Procon series A16 female for connection with Hydrohammer
No. 37 24 p Walther Procon series B24 male for connection with Hydr. power pack
No. 38 6 p Walther Procon series B6 female for connection with CA-valve and cap pressure sensor
(both mounted in hydr. power pack)
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Control box sheet no. : 3.1.0050
revision : 2
C-34 date : January, 2008
page : 1/1
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Printer set sheet no. : 3.4.0021
revision : 1
P-31/P-32 date : January, 2008
page : 1/1
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Printer set sheet no. : 3.4.0021
revision : 1
P-31/P-32 date : January, 2008
page : 1/1
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet IHC Hydrohammer B.V.
Control container 10-Ft sheet no. : 3.7.0001
®
Hydrohammer revision : 1
date : February, 2008
page : 1/1
APPLICATION: Certified offshore container, used for shelter and IHC Code no. 86 60 88 03
protection of IHC HYDROHAMMER control equipment
during (offshore) piling operations.
Option: Several equipment arrangements.
- Mass
Gross : . ................................6.500 kg
Tare : . ................................5.000 kg
Payload : .................................1.500 kg
- Dim’s lxwxh : 3000 x 2450 x (2430+120)mm
Basic provisions and energy consumption
- Heating : .................................. 2000 W
- Air conditioner: .................................. 2000 W
- Ventilator : .................................... 300 W
- Control eq. : .................................... 600 W
Handling
Certified lifting equipment consisting of a
Master link with 4 wire rope legs fitted with 4
shackles
Power supply
Required : 230Vac/32A (50Hz or 60Hz)
1ph(2 pin)+GND(1 pin)
Mains wall sockets : ................... acc. CEE form 6h
230Vac/32A (50Hz or 60Hz)
1ph(2 pin)+GND(1 pin), 3x4mm2
Electrical safety provision
- Circuit breaker : ..............................ABB (10A)
for : 230Vac wall sockets,
: lighting
: heating
- Circuit breaker : ..............................ABB (16A)
for : air conditioner
: refrigerator
Compliance with requirements
EN 12079: 2006 “Offshore containers – Design, construction,
testing, inspection and marking”
EN 12079: 2006 “Lifting sets – Design, manufacture and
marking”
IMO/MSC/Circ. 860
“Guidelines for the Approval
of Offshore Containers
Handled in Open Seas”
May, 22 1998
(IMO International Marine
Organization)
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Subject to modifications
e-mail: info.hh@ihcmerwede.com Web: www.ihchh.com
Data sheet Equipment
sheet no.
Manual
: 6.2.0600
Foundation Equipment B.V. Winch for control cable, revision :5
electric driven EW-600 date : June 2000
APPLICATION: Haul in and pay-out of control cable, 600 m outer diameter 26 mm. Code no. 86.46.24.00
S/N. 620600A01
1 Control cable 4 Connect. to Hydrohammer® control unit 7 Electr. motor for drum drive 10 Hand pump, for
2 Remote control box 5 Electric slip ring 8 Main control panel pressurization of cylinder
3 Guide sheave 6 Cable drum 9 Power connection 11 Load switch
©IHC Foundation Equipment B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
APPLICATION: Haul in and pay-out of hose bundle with load carrying cable ∅ 24 mm. Code no. 86.46.14.00
For: S-200-280: 2x 2” (hydraulic oil) + 1x 1” (air) S/N. 610600A01
S-400-500-600: 4x 2” (hydraulic oil) + 1x 1” (air).
1 Remote control panel 5 Hydro motor & gear box for 7 Geared electric motor, for 10 Hose bundle
2 Hydraulic Power-Unit (HPU) drum drive guide sheave adjustment 11 Load cell
3 Main control panel 6 Hose drum 8 Guide sheave 12 Lifting points (4x)
4 Hydraulic hose connections 9 Air hose swivel joint 13 Hydraulic swivel joint
© IHC Foundation Equipment B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
Hydraulic drum Hydraulic motor / angled gearbox / pinion and gear wheel
drive system Hydraulic motor Linde, type HMF-35-TFC
Angled planetary gear box Brevini, type EC-3150/MR/100/00 with brake type FL-635
Ratio 100:1
Hydraulic Power Motrac, electric/hydraulic control Variable (booster) pump with feed pump in tandem arrangement
Unit (HPU) Hydraulic pump Linde, axial piston type BPV 100 18 REH EXT, rating 420 bar
Operating pressure 250 bar
Displacement variable 0-100 cc/cycle
Electric motor 75 kW, 400Vac/50cps, 3ph
Isolation / protection grade F / IP56
Reservoir gross volume 250 liters
Oil cooler aircooled by motor driven fan
Cooling capacity 32 kW
Cooler motor 3 kW
Guide sheave Electric motor reductor Bauer, type CFG7G12-111/DK94-241UB
adjustment Electric motor Bauer, type ET-DK8; 0,75 kW, 380Vac/50cps
Gear box Bauer, CFG7 + G12
Pitch of lead screw on shaft 168 mm
Automatic protection against too high a line pull
Load cells (2x) installed in guide sheave supports
© IHC Foundation Equipment B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
FLUID
Level A D E
Temperature C F E
Condition (sample) # # # # # # #
Changes B E E
FILTERS
Changing of filters without blockage indicators B E E E
Monitoring of blockage indicators E E E E
Cleaning of breather filters # # # # # # #
ACCUMULATORS
Check gas pressure, check mounting B
Transport data:
Transport With additional special permission on highways.
Height of trailer 600 mm.
Lift the winch by means of the supplied hoisting slings, attached to the hoisting eyes (pad eyes).
Note: What is there to say about filler blocks lockng pins, caps and plugs?
Hydr. hose, as well as air hose and the load-carrying steel cable, are to be bundled and wound on the drum.
The same goes for the electric cable; see to it that it is wound properly on to the cable reel.
Max. operational dimensions (working space included), centre of gravity (COG), Lifting plan grafically presented.
© IHC Foundation Equipment B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
© IHC Foundation Equipment B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
©
IHC Hydrohammer B.V., P.O. Box 26, 2960 AA Kinderdijk, The Netherlands, Phone +31.78 6910302 Fax +31.78 6910304
IHC Hydrohammer B.V., P.O. box 26, 2960 AA kinderdijk, The Netherlands Phone +31.78 6910302 Fax +31.78 6910304
Sheet1
85208910 Spare parts S200/280 Basic
Page 2
SE forø94
f orØ94
REl\,lARK:
1, Breaking Test Load: 7189 KN; Proof Iesl Load: 5029 KN.
2, Mechanical Properties of 0ffshore Mooring [hain'
6, [ontract: 172/*-SUB-001'-10
Ih ain 1. ACCEPTED
SiGNAI URE:
Triat Fitting Template
Enlarged link For Ø94mm = EL for Ø94, Approx,S5Kg/Link Special End tink For 094mm = SE for øg4 , Approx,142Kg/Link Triat Fitting Templale
úl
o+t
úl
\-o
-
-J8 0
618t15 4 720
D, [rown ø103:¡[*
D, [rown øtlt:98 *
REI'4ARK:
1, Att Speciat End Link Shatt Be TriaI Fitting Test wilh Anchor Shackle.
ATIONAL OILWELL VARGO
2. This Tesl Shatt Be Done After FinaI lnspeclion and Att Shackte Shatt Be
Send to ZM Before Triat Fitting Test.
FPU For TSB Fietd \1Ur Pro iect
L Both Ends 0f Att Speciat End Links Shatt Be Tested l{ith The Triat Fit Template.
This ln Addition To The Triat Fit Test !{ilh The Shackles,
ZHENGI'4AO GROUP [O,,LTD
P001BR3-!( n.-'
ttÌ 1l.o[.12 tlf# 11.0','12 Í*,l; 11,0[.12
Studless conrnon link = [, Approx,6SKg/Link 10- t
564t1[ 1
D, [rown øgtlÍl *
REMARK:
1, Breaking Test Load: 7189 KN; Proof Test Load: 5029 KN.
2, Mechanical Properties of 0ffshore l\4ooring [hain,
PP0029BRJ-9[ n,' z
SIGNATURE: flf+ 11,04.ß r*+ fl.04,8
Marking area :
N° LB Date PL 5029KN Equivalent of 210
+6 50
ABS N° + Stamp 132 - 4 section
(Note 3)
(Note 3)
132
250
(Note 3)
M150 x 6
500 ±25
897
NOTE :
+1
95 0
+0,5
180 0
2 X 45° 2 X 45° See note 2 • DN94 chR3 Chain
See note 1
MBL : 7189 KN
PL : 5029 KN
Out of plane loading : ± 5°
24
175
Shackle body : 238 Kg
Shackle pin : 111 Kg
Shackle nut : 11 Kg
+4 206 ±4 +4
+1 132 0 (Note 3) 132 0 • Note 1 : Both end of the shackle pin shall be equipped with a M20
182 0 326 ±6 Eye Bolt & replaced by Plastic seal plug M20 x 25 before immersion.
(Note 3)
470
• Note 2 : Stainless Steel Bolts AISI316 or A4 :
• M16 x 180 Screw
• 2 x Self-locking nuts (Nylock)
• Safety pin location to allow for installation nut
Project title :
R3
1724 TSB
34,5
2 X 45°
220
17 Spe ANCHOR SHACKLE DN94 chR3
+0,5 Connecting : ANCHOR PADEYE & Special End Link (Tol. 0/+2.5%)
180 0
Le Béon Manufacturing
Drawing N°:
N°251210 0E
Rev.