TEFOMA CONSTRUCTION
TFM-SHEMS-MGT-001-00
TEFOMA CONSTRUCTION JV
MINUTES OF THE MEETING HELD ON 8 NOVEMBER 2022 AT 02:53 HRS. AT BRIDGE 10 MBUDZI
INTERCHANGE PROJECT
PRESENT
NO NAME TITLE EMAIL/ PHONE NUMBER
1 P.Madhovi SHE Manager- Tefoma peter@tefoma.com
2 L. Sibanda SHE Officer -Tefoma lloyd@tefoma.com
3 P. Mukwachari SHE Document Control- Tefoma sheq@tefoma.com
4 W.Mbede Sheq Rep 0785625573
5 M.Moyo Sheq Rep 0774789691
6 P.Mahlanza Sheq Rep 0772214976
7 E.Gutsa Sheq Rep 0789787229
8 D.Maninga Sheq Rep 0773774935
9 T. Mhlanga Sheq Rep 0719259943
10 T.Murevenemwe Sheq Rep 0718797051
OPENING PRAYER
EUNICE GUTSA
ITEM DISCUSSION RESOLUTION RESP DATE
No
1.0 CHAIRPERSON’S WELCOME REMARKS P.M 8/11/2022
The Chairperson firstly took swipe by thanking all board members who attended the
meeting. He emphasized that, the purpose of the meeting was to discuss about the
duties and responsibilities of sheq department.
2.0 ADOPTION OF PREVIOUS MINUTES
There were no previous minutes to be read hence the meeting went on
3.0 MATTERS ARISING FROM THE PREVIOUS MINUTES.
It was discussed about shifts changes since most of the activities are now done at night
therefore, everyone is now liable to work on night shift. All She Reps to be rotating since
it wasn’t fair to let Takudzwa be the one responsible for night shift. Therefore from
Wednesday night 09.11.2022 Danne Maninga and Hojesi Bennetti will be on night shift
till Wednesday 16.11.2022. Sibanda also emphasised on the point of hand over and
take over. There should be a proper hand over and take over when rotating or shift
exchanges.
Safety slogan was another issue raised in the meeting. It has been debated on how to
launch our slogans so that everyone can be aware of the slogan for the month. The
question was on HOW? HOW ARE WE GOING TO DO IT? HOW ARE WE GOING TO
ENFORCE IT? HOW ARE WE GOING TO MAKE OUR SAFETY SLOGAN MORE
VIBRANT? How to enforce our slogans so that everyone would be aware. Therefore,
there were different suggestions passed out in order to make our slogan lit.
To start with, it was agreed that repeating the slogan every day at Hira makes our
slogans to be more vibrant and it makes employees to be very aware of the slogan.
Use of flyers and banners at site was also suggested for it will help employees to get
Document Number
TEFOMA CONSTRUCTION
TFM-SHEMS-MGT-001-00
used to the slogan. All in all, it was agreed that in order to make our slogan vibrant we
have to preach about it and write about it.
7.1 Airtime
There is need of airtime for communication because sometimes we fail to send reports
in time due to airtime challenges.
7.2 PPE
There is shortage of PPE on site. However, we were promised that the company is
working on the ppe issue.
7.3 Shade for eating areas
Teclar raised the issue of erecting shades on eating areas as a necessity since we are
in rain season. There must be adequate shades erected to avoid employee being
exposed to heavy rains. However, Sibanda said it is on progress since there is a
parameter fence that is being erected.
7.4
Document Number
TEFOMA CONSTRUCTION
TFM-SHEMS-MGT-001-00
Labour requisition
Since Mukai Musiyarwo haven’t been replaced Takudzwa have been covering 3
sections by himself. Therefore, he was complaining that the load is too much for him
7.5 hence there is a need of a She Rep.
Speaker
7.6 There is need for a speaker at bridge 1 for sound system during HIRA.
Salary increment
Some she reps are still paid as general hands therefore there is need for salary
7.7 adjustments.
Lights
There is need of lights for spotters to direct vehicles.