You are on page 1of 16

Practical No.

Title: Calculate average rainfall for the given area using arithmetic
mean method.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)


Practical No. 2

Title: Calculate average rainfall for the given area using isohyetal
Theissen polygon method.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 3
Title: Delineation of the contributory area for the given outlet from
the given topo-sheet.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 4
Title: Compute the yield of the Catchment area demarcated in
Sr.No.2.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 5
Title: Estimate crop water requirement for the given data.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 6
Title: Estimate capacity of the canal for the given data.
.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 7
Title: Calculate reservoir capacity from the given data..

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 8
Title: Calculate control levels for the given data for the given
reservoir.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 9
Title: Draw a labelled sketch of the given masonry/earthen dam
section.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 10
Title: Draw the theoretical and practical profile of the given gravity
dam section.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 11
Title: Prepare a presentation on the technical details of any one micro
or minor irrigation scheme.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 12
Title: Prepare a model of any irrigation structure using suitable
material.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 13
Title: Prepare a maintenance report for any major/minor irrigation
project site in the vicinity of your area, based on field visit.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 14
Title: Prepare summary of the technical details of any existing water
resource project in the vicinity of your area.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 15
Title: Draw a labelled sketch of the given diversion head works and
CD works.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

Practical No. 16
Title: Design a canal section for the given conditions with estimation
of the quantity of material required for lining of the given
canal.

Marks Obtained Dated Sign of Teacher

Process related (15) Product related (10) Total (25)

You might also like