Professional Documents
Culture Documents
Lesson Learnt
Lesson Learnt
Immediate Actions
• Job stopped immediately, Proper earthing was provided to ground and job resumed.
Lesson learned.
➢ Equipment shall be earthed in proper manner
➢ Appropriate earthing rod (Good Conductor) to be used
➢ Air compressor to be inspected daily and checklist to be attached along with permit