FUSTEKA GROUP DAILY QUALITY ASSURANCE

REPORT
0Date31/8/2022

ACTION
PLANT/
ISSUE EVIDENCE Corrective
LINE Correction
action

The
production
Low level of
engineer
cleanliness in The
has been operator of
the machines
F-C notified the machine
even though must be
and some
they are held
paragraphs
stopped responsible
have been for complete
closed hygiene,
whether in
the case of
operation or
shutdown

lab Continuous The


fridge drop in cold ammonia
temperatures technician
B was
notified,
and one of
the vans
was
completely
defrost,
and the
stairs were
ascended
FUSTEKA GROUP DAILY QUALITY ASSURANCE
REPORT

Please
urge
maintenan
A malfunction ce to
in the outer address
door of the this issue
lab, and It was
maintenance reported in
B1 was not advance
carried out and there
despite the was a
passage of a notification
period of , and the
time answer
was the
lack of
spare parts