You are on page 1of 9

N A T I O N A L C O L L E G E O F S C I E N C E A N D T E C H N O L O G Y

AMAFEL BUILDING, AGUINALDO HIGHWAY, DASMARIÑAS CITY, CAVITE

A R C H I T E C T U R A L D E S I G N 8

BINHI: THE REHABILITATION OF AGRI-ECO TOURISM CENTER IN BIÑAN CITY,


LAGUNA

FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
SECTION: SUBJECT: INSTRUCTOR GROUP NO.

BS-ARCH42E1 ARCHITECTURAL DESIGN 08 AR. CARLO J. MADRONA UAP, RMP GROUP 11

BERMUDEZ, LADY GRACE S. CONDAT, CHRISTOPHER D. RAMOS, JOHN PAUL C.


FINAL REQUIREMENT
FLOORPLAN REVISION, MULTIPLE TIMES FOR US TO SEE THE BEST ORIENTATION FOR
EACH ROOM. ESPECIALLY IN THE MAIN BUILDING WE WANT TO BE THIS IS THE

NARRATIVE REPORT OF MOCK THESIS CENTER OF KNOWLEDGE FOR AGRI AND ECO TOURISM. SO WE COME UP TO THE DESIGN
THAT ALL NECESSARRY FACILITIES IS WITHIN THE BUILDING LIKE LABORATORY AND

BEFORE THE DEFENSE


ETC. FROM SOME AREAS, WE HAVE MULTIPLE TIMES OF RELAYOUT FOR TOILETS THAT
SEPERATING PWD. THE DURATION OF OUR WORK STARTED APRIL 12-JUNE 20, 2022.
THE PICTURES ALSO SHOWING THE BRAINSTORMING AND SHARING SOME IDEAS IN
OUR PROJECT. THE TEAMWORK IS THE KEY TO HAVE A SUCCESSFUL OUTPUT EVEN
THOUGH THERE'S A TIME THAT WE CANNOT UNDERSTAND EACH OTHER.
FINAL REQUIREMENT AFTER THE DEFENSE WE REALIZE THAT BEING PREPARED STILL NOT ENOUGH BECAUSE
EVEN THE SMALLEST DETAIL CAN TURN THE DEFENSE INTO DISASTERS THAT CAN
NARRATIVE REPORT OF MOCK THESIS DISAPPOINT THE PANELIST. ASIDE FROM THAT WE ARE REALLY GRATEFUL TO OUR
PANELIST BECAUSE THERE'S A LOT OF SUGGESTION AND RECOMMEDATION FOR US TO
IMPROVE MORE AND ALSO IT IS OUR BASIS OR GUIDELINES IN THE THESIS. OUR

AFTER THE DEFENSE MISTAKES IS STEPPING STONE FOR US TO DO BETTER IN TERMS OF PLANNING AND
EXAMINED THOROUGHLY FROM SMALL DETAIL TO BIG DETAIL. EVERY DETAILS SHOULD
HAVE A PROOF AND BASIS IN ORDER TO DEFEND OUR WORK.
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
BEFORE

M M

O O

D D

E E

L L
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
BEFORE

M M

O O

D D

E E

L L
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
BEFORE

M M

O O

D THE SEVERAL PICTURES SHOWING THE STEP BY STEP OF MAKING THE SCALED MODEL. THE DURATION OF
D
PREPARATION OF THE SCALED MODEL WAS STARTED ON MAY 28-JUNE 20, 2022. THERE'S A LOT OF
REVISION IN ESPECIALLY IN THE FISHING DECK AND ALSO TO THE ORIENTATION OF THE STRUCTURES

E WITHIN THE SITE AND AND ALSO HAVE A REVISION IN LANDSCAPINGD DESIGN IN ORDER TO HAVE A
GOOD ACCESSIBLE AND GOOD CIRCULATION OF THE ELEMENTS. HONESTLY OUR SCALED MODEL IS SO E
HUGE SO THAT WE EXPERIENCE STRUGGLING WITH THE DETAILS BUT WE TRYING TO FULLFILL AND
FINISH NO MATTER WHAT HAPPEN. WE HAVE TRIAL AND ERROR IN CHOOSING LANDSCAPING MATERIALS

L FOR OUR TREES AND GRASS. PREPARATION OF CUTOUTS OF STRUCTURES AND MIXTURE OF COLORS THAT
WE NEED TO ADD FOR LANDSCAPING. L
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
AFTER

M M

O O

D D

E E

L L
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS
AFTER

M M

O O

D THE SEVERAL PICTURES SHOWING THE FINAL OUTPUT OF OUR SCALED MODEL. HONESTLY
D
WE ARE SATISFIED FOR THE RESULT OF OUR SCALED MODEL. AND ALSO WE ARE NOT

E E
EXPECTING TO DETAILS OUR SCALED MODEL. WITH THE SIZE OF OUR SITE, WE USED THE
SCALE MODEL TO PRESENT TO THE PANEL PROPERLY WHAT IT IS, WHERE IT IS USED AND
HOW BIG IT ACTUAL. IN THE COMMENTS OF THE PANELS ON OUR MODEL, THAT WE
REALIZED THAT EVEN THOUGH WE HAD GROUNDED LAWS TO DESIGN IT, WE HAD AND STILL

L HAVE A NEGLECTED AREA, WHICH THE PANELS SAW.


L
FINAL REQUIREMENT
NARRATIVE REPORT OF MOCK THESIS

FEEDBACK FROM THE PANELIST


YOU ALREADY WASTE THE BEAUTIFUL VIEW IN THE BACK BECAUSE
YOU WERE SURROUNDED BY OFFICES, THEN THERE WAS NO ACCESS TO
THE PAVILION FROM THE MAIN BUILDING, I NEED TO TURN AROUND
FROM THE FRONT ENTRANCE BEFORE I COULD GET THERE.
TOO MUCH OFFICES FOR MAIN BUILDING, YOU SHOULD HAVE DONE IT
AS A SECOND FLOOR JUST FOR THE OFFICES ONLY.
DELIVERY TRUCK LOADING AND UNLOADING FAR FROM THE GREEN
HOUSE OR HARVEST PLACE.
THE PANELIST SUGGESTED THAT WE NEED TO SWITCH THE LOCATION
OF RESTAURANT AND MAIN BUILDING.
IF I'M FROM URBAN CITIES THEN I'LL GO TO THIS PLACE, AREN'T
THERE TOO MANY BUILDINGS HERE TO BE A TOURIST SPOT FOR URBAN
COMMUNITIES.
DROPOFF AND MAINROAD CONFLICT.
ROAD NETWORK, NO EASY ACCESS TO EVERY STRUCTURE.
TOO MANY WALLS FOR THE MAIN BUILDING.
THE PAVILLION IS SURROUNDED BY OFFICE BUILDING.
LACK OF STP (SEWAGE TREATMENT PLAN) AND FAR PLACEMENT OF
GARBAGE COLLECTION FACILITIES.