Professional Documents
Culture Documents
EANAP With Tagalized - SLFM v1
EANAP With Tagalized - SLFM v1
for
6
Fire Exits
Speaker locations in
function room/ballroom Speakers,
corners or on stage. ALL screens, back
equipment must be at drops obstructing
least 1.2 meters away exits or
from the Fire Exits. hampering
Iset-up ang mga speaker sa mga operations
sulok ng function room o sa
stage. Ito ay dapat may distansya
Tables, chairs
na 1.2 metro mula sa mga Fire obstructing exits
Exit. Other equipment
Drapes opened for exits obstructing fire
to be visible and exits, including
accessible hallways
Hindi tinatakpan ng kurtina ang
mga fire exit.
Empty boxes stored
properly at Basement 1
Ilagay nang maayos ang mga
equipment box na walang laman
sa Basement 1.
Working at Heights (6ft and above)
Paggawa sa Taas na Higit sa 6 na talampakan
Full body harness, carabiner, & lifeline No safety harness, safety belt, & rope
To install outrigger if more than 2 layer of No outrigger (advice to stop immediately)
scaffold frame
Maglagay ng outrigger kapag higit sa 2 patong No Handrail (advice to stop immediately)
ang scaffolding. Agarang pahihintuin ang trabaho kapag walang outrigger
With handrail at the top of the scaffold at handrail ang scaffolding.
Lagyan ng hawakanang itaas ng scaffolding.
Don’t ride the scaffold while it is being
moved
Huwag sumakay sa scaffold ing habang inuurongito.
6.0 Audio/Visual, Lighting & Electrical Safety
Exposed wires
due to open
Splice/connector box splicing and
locked broken insulation,
unlocked splice
box
Wires neatly
arranged and away Wires mixed up/
from other
peeled wires
combustible
materials Sala-salabat na mga
kable
Ilatag nang maayos at
malinis and mga kable,
malayo sa mga
combustible materials 9
Audio/Visual, Lighting & Electrical Safety
14
Note:
• Contractors should present the payment receipt of
the cash bond before they can start with any massive
carpentry works (this is incase they do not pay in
advance)
• Cash bond will be release at least 3 days after the
egress depending on the damage
15
7.1 General Set-up
FIREWORKS
CRYOGENICS
(more than 10 lbs
stored in pressurized containers)
7.2 General Set-up
BATTENS
19
7.4 General Set-up
BATTENS
20
7.5 General Set-up
Grand Ballroom A
20 kVA, 400 V, 3phase
4-15A, 230V,
single phase
7.9 Uninterruptable Power Supply (UPS)
Grand Ballroom B
80 kVA, 400 V, 3phase
Total current
(max): 270A, 230V,
single phase
3-60A, 230V,
single phase
8.0 Meals/ Smoking
No. Elevator Units Car Size (mm) Car Size (mm) Load
Inner Outer Capacity
Note:
For Grand Ballroom – use BS1 & BS2
For Bonifacio Hall, Meeting Rooms and Aventure Zone – use HS 1-6
30
Proper Positioning of Materials During Hauling at BS2 (Cargo Lift)
Tamang Pagpuwesto ng mga Gamit sa BS2 (Cargo Lift) Habang Naghahakot
NOTE: A violation ticket shall be issued to the involved party, as a form of acknowledgement on the
said offense.
For gross violations such as flooding, fire, fighting of workers, setup will be stopped
and the Cash Bond shall be forfeited even at first offense. Setup can only be
resumed after the contractor posts another bond and the person in-charge of the
setup is relieved.
MGA PAGLABAG:
1. First offense: Php1,000.00 bawat paglabag kada tao. Ang taong ito ay hindi
na maaaring pumasok sa SLFM.
2. Second offense: Php2,000.00 bawat paglabag kada tao. Ang taong ito ay
hindi na maaaring pumasok sa SLFM.
3. Third offense: Php4,000.00 bawat paglabag kada tao. Ang taong ito ay
hindi na maaaring pumasok sa SLFM. Kailangang palitan na ang foreman o
person-in-charge.
4. Fourth offense: Madaliang pahihintuin ang Contractor sa anumang trabaho
at ang Cash Bond na Php 50,000 ay hindi na makukuka ng Contractor.
Kinakailangang magbayad ng karagdagang Cash Bondo bago
pahintulutang ituloy ang trabaho o set-up ng Contractor.
NOTE: Bibigyan ng violation ticket ang Contractor bilang pagtanggap ng nasabing paglabag.
Para sa matinding paglabag kagaya ng pagkakaroon ng pagbaha, sunog o kaya ay pag-
aaway ng mga staff, agarang pahihintuin ang anumang trabaho o set-up at ang Cash
Bond na Php 50,000 ay hindi na makukuka ng Contractor kahit first offense pa lamang,
Kinakailangang magbayad ng karagdagang Cash Bond bago pahintulutang ituloy ang
trabaho o set-up ng Contractor.