You are on page 1of 2
ARE SST FT STS piessunnsai "TRANSMISSION COMMISSIONING DEPARTMENT cobemavostie Twircormavacn2 LVAC SITE ACCEPTANCE TEST REPORT Issve.t/ Revo [Substation Name 132/11kV MRINACMN SUBSTATION. SCADA Name MRINACMN [Contract No. PO-3762200003 Manufacturer SAS [Contractor CENTAUR Equipment ID No. HLDB canst : Examen : Start_| Arrival | testP | Tests | TestF | Test =(TF-TS) LWitness % 100% [Test Date: 06.12.2022 esaeaar— si # yee a (Consuitant o (visit No. 2 [Test No. set sas ata $ —s Hag HLDS GUTGORN CARLETEST Tama —[ IK as Tar a ToS We conta | een aan son] coer retTe ono 29 ‘Samm cca FSU Roweee Y= aenee) S-TeYAeEy Ree sn ee a FER OPT TERMNATON PANEL 20 : on _ >| rome | am ao TaccommwcaTon evoeie es : ono _ >| ome | oe ow cas on ms ‘ow wn a0 v «| rome | om ano | exrrenrwowronmasveren eave | sow oa - en om cera, ors : on me «| mm |e os ‘wow .ce wor oes om oye 2 mm oa oo aaa a = ower — orn RTE [near ren EaESTED EY WATNESSED BY: Taree iH NA t KAMIL enact ad & Signe] Conant ane Sina EWA ane & Signa) {8 Transmission Commissioning Department "TRANSMISSION POWER DIVISION ‘TRANSMISSION COMMISSIONING DEPARTMENT Toreoma ace LVAC SITE ACCEPTANCE TEST REPORT sey Revo [Substation Name 12/1 1KV MRINACMN SUBSTATION [SCADA Name MRINACMN, [contact No PO-3767200003 [Manvfacurer ‘SAS [contractor ‘CENTAUR [Equipment 1D No LDS Iconsuttant ~ [Equipment StNo. = Start | arwvai | Teste | Tests | Test | Test = cr-73) [wniness 100% [Test Date 98.42.2022 (Gontaetor =| 735 2 ie 2 [ATemo*C. zs page Na. z Iconeurant - ° Wvisitno. 2 Test No wort [DEWA [a 2 [Reference {720 HLDS OUTGOING CABLE TEST Tamia 2 ‘Cetera | The Winimon ieuaton resizancs 100 Cable Sie | Kenton Tneciaon Ressance nD simo| — cabieT Fees To eats " Samm) | mccayrsu Ramey Tone Be Revenne) Wee 7 | Peose 4x8 ou ‘a2v ice (oT-3) 40600 00 9700 00 a 2 | ecozrs 208 av [SHUNT REACTOR 10K) 28100 77500 ase 2 | pcan 298 are ‘SHUNT REACTOR 20K) 25600 27500 as [ckebradon Deis [restki Sine TR TESTERNIOT400921 [Babaion doe Bate 28 [cibravon Deals [Testk SiN THERMOMETERIGE7 00652 [emai do Bate ‘2052023 EXECUTED BY WITNESSED BY: WITNESSED BY: MURALIDI NA KAMIL Contractor (Name & Signature) Consultant (Name & Signature) DEWA (Name & Signature) © transmission Commisoning Deparment

You might also like