problem site ID escalation date

1068
/1155/1881/1647/4794/4627
kfs site rectification (need gravil ) from 27/5/2022
/4091/4342/4642/4641/4189
/4895/1667/4600/4696

Summer preparation problem. Need washing machine All from 25/3/2022

DEL4883 acces site problem 4883 from 27/5/2022

DEL 1647 cabin lock prob. 1647 from 26/5/2022

DEL 4625 T.R 4625 from 27/12/2022

DEL 2836 T.R 2836 from 30/5/2023

DEL 4690 T.R 4690 from 16/2/2022

new dg problem 4696 from 5/3/2022

new dg problem 4641 from 16/3/2022

DEL 1647 T.R 1647 from 26/2/2022

2836 fuel pump problem 2836 from 16/4/2022

compensated fuel 4164 from 17/3/2022

compensated fuel 1647 from 6/4/2022

compensated fuel 4883 from 15/12/2021

compensated fuel 4641 from 11/4/2022

compensated fuel 4600 from 21/3/2022

compensated fuel 4690 from 16/2/2022

warranty power tech problem 4600 from 2/5/2022


warranty power tech problem 4794 from 16/4/2022

warranty power tech problem 4342 from 26/5/2022


prob. Implications periority

bad site statues normal

ineffecient DG radiators high

difficulty entering site normal

illegal intervention high

Dg under risk normal

Dg under risk normal

Dg under risk normal

Dg under risk high

Dg under risk high

dowen due to S.Part high

dowen due to S.Part high

dowen due to Stolen fuel high

dowen due to Stolen fuel normal

dowen due to Stolen fuel high

dowen due to illegal connection high

dowen due to Stolen fuel high

dowen due to Stolen fuel high

dowen due to warranty prob. high


Dg under risk high

Dg under risk high