NPM : 18311907 Title : Plaza Oleos Construction Project Special Problem : Monitoring Temperature Changes on Mass Concrete Raft Foundation Level : Strata Satu (S1) Civil Engineering, Gunadarma University Keyword : Raft Foundation, Crack, Temperature, Thermocouple
(xx + 150 + Attachment)
Oleos Plaza construction project is the construction of an office building
consisting of 4 basement floors dan18 office with a building area of 75,000 m2 and a land area of 14008 m2. The project is located on the TB. Simatupang Kav.53A street, South Jakarta. The project work began on 21 February 2013 and is planned to be completed until 22 December 2013. The cost of this project is Rp. 104,445,225,000.00 with PT. Pulau Intan as a contractor. Construction of the Plaza Oleos use raft foundation with a volume of 6057 m3 of concrete and strength of the concrete is f'c 32 MPa, so that the manufacturing process should be kept, because raft foundation is a mass concrete, which is potentially crack caused by high temperature of hydration. Especially when treatment should be done properly concrete, concrete temperature should be measured with a certain period. In the construction of Plaza Oleos thermocouple mounted on 3 points, each point there are 3 heat sensors, to control the temperature of the concrete at the top , middle and bottom. At the reading of thermocouple (TC) is the temperature varies between 32oC to 79oC. Varying temperature changes, which occurred during the monitoring in the field causes a temperature difference between the concrete layers (top, middle, and bottom) also varied. The temperature difference between the top tier, middle and bottom of the mass concrete raft foundation Oleos Plaza project doesn’t exceed 20 °C, so it doesn’t potential for cracking.