Project BUILDING A NATIONAL MUSEUM Borehole

Location NATIONAL MUSEUM, STREET 1, BATTAMBANG CITY, BATTAMBANG PROVINCE Sample No.

Description Sandy lean CLAY, brown - grey Depth 1.5 ~ 1.9 m

Beginning of test End of test Date tested 12/2022

Height Ho 2.000 cm H 1.811 cm Liquid limit 35.1 %

Moisture content Wo 26.54 % W * % Plastic limit 18.2 %

Bulk unit weight γm 19.23 kN/m³ γm * kN/m³ Plasticicty index * %

Deg. of saturation Sr 96.0 % Sr * % Liquidity index 0.49

Void ratio eo 0.743 e 0.578 Specific gravity 2.70

Preconsolidation pressure Pc 124.8 kPa Recompression index Cr 0.047 Comp. ratio CR 0.094

Compression index Cc 0.163 Swelling index Cs 0.021 Recomp. ratio RR 0.012

P e t50 Cv mv av kv Eoed Csec

(kPa) (-) (min) (m²/year) (m²/MN) (m²/MN) 10-9 m/s)


((×10 / ) (MPa) (-)

0 0.743

12.5 0.738 #N/A #N/A 0.23 0.40 #N/A 4.3 #N/A

25 0.724 11.3 0.90 0.64 1.12 0.18 1.6 0.0010

50 0.705 2.6 3.86 0.44 0.76 0.53 2.3 0.0005

100 0.676 1.5 6.50 0.34 0.58 0.69 2.9 0.0012

200 0.637 1.1 8.50 0.23 0.39 0.61 4.3 0.0015

400 0.591 1.3 6.83 0.14 0.23 0.30 7.1 0.0008

800 0.542 1.2 6.97 0.08 0.12 0.17 12.5 0.0013

1600 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

3200 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

400 0.543 #N/A

100 0.555 #N/A

25 0.570 #N/A

12.5 0.578 #N/A


LEGEND: Cv Coefficient of consolidation av Coefficient of compressibility Eoed Oedometer modulus

mv Coefficient of volume compressibility kv Coefficient of permeability Csec Coefficient of secondary compression

Employer Consultant Operator Chief of Lab

CONSOLIDATION TEST

(ASTM D2435)
Project BUILDING A NATIONAL MUSEUM Borehole

Location NATIONAL MUSEUM, STREET 1, BATTAMBANG CITY, BATTAMBANG PROVINCE Sample No.

Description Sandy lean CLAY, brown - grey Depth 1.5 ~ 1.9 m

0.770 0.770

0.720 0.720
Void ratio, e

Void ratio, e
0.670 0.670

0.620 0.620

0.570 0.570

0.520 0.520
124.8
10 100 1000 10000 0.1 1 10

Load, P (kPa) kv (×10-9 m/s)

9.00 0.0016

8.00 0.0014

7.00
0.0012

6.00
0.0010
Cv (m²/year)

5.00
0.0008
Csec

4.00

0.0006
3.00

0.0004
2.00

1.00 0.0002

0.00 0.0000
10 100 1000 10000 10 100 1000 10000
Load, P (kPa) Load, P (kPa)

CONSOLIDATION TEST

(ASTM D2435)
Project BUILDING A NATIONAL MUSEUM Borehole

Location NATIONAL MUSEUM, STREET 1, BATTAMBANG CITY, BATTAMBANG PROVINCE Sample No.

Description Sandy lean CLAY, brown - grey Depth 1.5 ~ 1.9 m

LOAD INCREMENT FROM 12.5 kPa TO 25.0 kPa

t ΔH
0.070
(min) (mm)
do
0.1 0.090 0.090

0.25 0.097
0.110
Settlement (mm)

0.5 0.102

1 0.111 0.130

2 0.121 d50
0.150
4 0.131

8 0.140 0.170
t50
15 0.150
0.190
30 0.160
0.210 d100
60 0.170

120 0.180 0.230


240 0.195
t100
0.250
480 0.210
0.1 1 10 100 1000 10000
1440 0.220
Time (min)
2880

do = 0.081 mm d100 = 0.211 mm d50 = 0.146 mm Csec = 0.0010

t100 = 509.70 min t50 = 11.3 min

LOAD INCREMENT FROM 25.0 kPa TO 50.0 kPa

t ΔH
0.240
(min) (mm)
do
0.1 0.270

0.25 0.285 0.290


0.5 0.299
Settlement (mm)

1 0.312
0.340 d50
2 0.330

4 0.348

8 0.364
t50
0.390
15 0.375

30 0.388 d100
75 0.398
0.440
120 0.408

240 0.418 t100

480 0.428 0.490

1440 0.433 0.1 1 10 100 1000 10000


Time (min)
2880

do = 0.254 mm d100 = 0.419 mm d50 = 0.337 mm Csec = 0.0005

t100 = 69 70 min
69.70 i t50 = 2 6 min
2.6 i

CONSOLIDATION TEST Date tested

(ASTM D2435) 12/2022


Project BUILDING A NATIONAL MUSEUM Borehole

Location NATIONAL MUSEUM, STREET 1, BATTAMBANG CITY, BATTAMBANG PROVINCE Sample No.

Description Sandy lean CLAY, brown - grey Depth 1.5 ~ 1.9 m

LOAD INCREMENT FROM 50.0 kPa TO 100.0 kPa

t ΔH
0.480
(min) (mm) do
0.1 0.525
0.530
0.25 0.548

0.5 0.570
Settlement (mm)

0.580
1 0.598
d50
2 0.625 0.630
4 0.651

8 0.675 0.680 t50


15 0.690

30 0.709 0.730 d100


60 0.718

120 0.732 0.780


t100
240 0.745

480 0.760 0.830


0.1 1 10 100 1000 10000
1440 0.771
Time (min)
2880

do = 0.497 mm d100 = 0.732 mm d50 = 0.614 mm Csec = 0.0012

t100 = 29.50 min t50 = 1.5 min

LOAD INCREMENT FROM 100.0 kPa TO 200.0 kPa

t ΔH
0.850
(min) (mm) do
0.1 0.908 0.900
0.25 0.940

0.5 0.975 0.950


Settlement (mm)

1 1.010
1.000
2 1.048 d50
4 1.080 1.050
8 1.108
1.100
t50
15 1.128

30 1.148
1.150
60 1.161 d100
120 1.180 1.200
240 1.192
t100
480 1.208 1.250
0.1 1 10 100 1000 10000
1440 1.222
Time (min)
2880

do = 0.869 mm d100 = 1.166 mm d50 = 1.017 mm Csec = 0.0015

t100 = 17 60 min
17.60 i t50 = 1 1 min
1.1 i

CONSOLIDATION TEST Date tested

(ASTM D2435) 12/2022


Project BUILDING A NATIONAL MUSEUM Borehole

Location NATIONAL MUSEUM, STREET 1, BATTAMBANG CITY, BATTAMBANG PROVINCE Sample No.

Description Sandy lean CLAY, brown - grey Depth 1.5 ~ 1.9 m

LOAD INCREMENT FROM 200.0 kPa TO 400.0 kPa

t ΔH
1.300
(min) (mm) do
0.1 1.380
1.400
0.25 1.420

0.5 1.460
Settlement (mm)

1 1.510 1.500
d50
2 1.550

4 1.591 1.600
8 1.622 t50

15 1.647
1.700
30 1.670 d100

60 1.688
1.800
120 1.700
t100
240 1.718

480 1.740 1.900


0.1 1 10 100 1000 10000
1440 1.748
Time (min)
2880

do = 1.331 mm d100 = 1.718 mm d50 = 1.525 mm Csec = 0.0008

t100 = 23.70 min t50 = 1.3 min

LOAD INCREMENT FROM 400.0 kPa TO 800.0 kPa

t ΔH
1.780
(min) (mm)
do
0.1 1.880
1.880
0.25 1.920
Settlement (mm)

0.5 1.970

1 2.020 1.980

2 2.080 d50
4 2.130 2.080
8 2.169
t50
15 2.191
2.180
30 2.220

60 2.239 d100
2.280
120 2.258

240 2.275
t100
480 2.290 2.380
0.1 1 10 100 1000 10000
1440 2.302
Time (min)
2880

do = 1.821 mm d100 = 2.253 mm d50 = 2.037 mm Csec = 0.0013

t100 = 17 00 min
17.00 i t50 = 1 2 min
1.2 i

CONSOLIDATION TEST Date tested

(ASTM D2435) 12/2022