RENCANA ANGGARAN BIAYA

NO ITEM SATUAN VOLUME

1 Pengadaan Tanah m2 3,500.00


2 Land Clearing ls 1.00
3 Pembangunan Fasilitas Usaha ls 1.00
4 Pengadaan Mesin Press unit 1.00
5 Pengadaan Mesin Mixer Kapasitas 1kw/jam unit 1.00
6 Pengadaan Mesin Extruder Kapasitas 30kg/jam unit 1.00
7 Pengadaan Mesin Chopper multifungsi unit 1.00
8 Oven Listrik unit 1.00
9 Lain-lain ls 1.00
TOTAL
GARAN BIAYA
HARGA SATUAN JUMLAH
(Rp.) (Rp.)
100,000.00 350,000,000.00
1,000,000.00 1,000,000.00
200,000,000.00 200,000,000.00
50,000,000.00 50,000,000.00
15,000,000.00 15,000,000.00
72,500,000.00 72,500,000.00
6,500,000.00 6,500,000.00
25,000,000.00 25,000,000.00
25,000,000.00 25,000,000.00
745,000,000.00