You are on page 1of 56

Owner: DOCUMENT NO.

:
PIT-TNK-LGC-CS-CA-001

PROJECT NO:
PITSA-002-TANK-2021

Consultant:
PAGE:
1 OF 35

JASA KONSULTAN PENYUSUNAN DETAIL ENGINEERING DESIGN


(DED) PEMBANGUNAN TANGKI TIMBUN 3X2500KL
DI TBBM DILI PERTAMINA INTERNATIONAL TIMOR, SA

CALCULATION SHEET OF STORAGE TANK 3x2500KL FOUNDATION

REV.NO DATE DESCRIPTION PREP BY CHCK BY REV’D BY APPR BY

A 20.12.21 Issued For Approval FRZ DWI DSR JUN


Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :1/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

REVISION HISTORICAL SHEET


REV. DATE OF PAGE/ ITEM DESCRIPTION OF CHANGE
NO. ISSUE PARAGRAPH
A 20/12/21 Issue For Approval

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :2/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

CONTENT

REVISION HISTORICAL SHEET ................................................................................................. 1

C O N T E N T ............................................................................................................................. 2

1. GENERAL ............................................................................................................................... 4
1.1 OUTLINE OF STRUCTURE ......................................................................................................... 4
1.2 STANDARD UNITS AND PROGRAM USED ................................................................................... 4
1.3 CODE AND STANDARD ............................................................................................................. 4
1.4 USED MATERIAL AND ALLOWABLE STRESS ............................................................................... 5
1.5 OTHER REQUIREMENT DATA ................................................................................................... 5
1.6 REFERENCE LOADING DATA ..................................................................................................... 7

2. PROPERTIES OF FOUNDATION ............................................................................................. 7


2.1 DIMENSION OF FOUNDATION................................................................................................... 7

3. LOADING DATA ..................................................................................................................... 9


3.1 TABLE LOADING DATA TANK .................................................................................................... 9
3.2 TABLE LOADING DATA SELF-WEIGHT FOUNDATION ................................................................ 10

4. LOAD COMBINATION .......................................................................................................... 10

5. PILE DESIGN ANALYSIS ..................................................................................................... 11


5.1 N-SPT REPORT ....................................................................................................................... 11
5.2 PILE CAPACITY & ESTIMATED NUMBER PILE ........................................................................... 13

6. FOUNDATION ANALYSIS .................................................................................................... 18


6.1 3D MODELING & PILE ARRANGEMENT..................................................................................... 18
6.2 SETTING DIMENSION & CONSTANT DATA ............................................................................... 19
6.3 INPUT LOAD DATA & LOAD COMBINATION ............................................................................. 21
6.4 INPUT REINFORCEMENT PILE CAP .......................................................................................... 24
6.5 OUTPUT ANALYSIS PILE CAP & PILE CAPACITY ........................................................................ 25
6.6 RINGWALL ANALYSIS ............................................................................................................. 30

7. REINFORCEMENT BOREPILE .............................................................................................. 32

8. RESUME .............................................................................................................................. 33
8.1 ARRANGEMENT PILE & JOINT CONNECTION TO PILE CAP ........................................................ 33
8.2 REINFORCEMENT PILE CAP & RING WALL ............................................................................... 34

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :3/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

8.3 BOREPILE REINFORCMENT ..................................................................................................... 34


8.4 PILE CAPACITY....................................................................................................................... 35
8.5 YIELD STRENGTH REBAR & COMPRESSIVE STRENGTH CONCRETE ........................................... 35
8.6 SOIL IMPROVEMENT .............................................................................................................. 35

ATTACHMENT-1 MECHANICAL TANK DRAWING


ATTACHMENT-2 LOAD DATA
ATTACHMENT-3 PILE CAPACITY SOIL INVESTIGATION REPORT

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :4/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

1. GENERAL
1.1 OUTLINE OF STRUCTURE
Project : STORAGE TANK 3 x 2500 KL
Client : PT. PERTAMINA INTERNATIONAL TIMOR
Location : Timor Leste
Equipment : Storage Tank
Foundation type : PC Spun Pile Foundation

1.2 STANDARD UNITS AND PROGRAM USED


1.2.1 Unit of Measurement
Unit of measurement in design shall in metric system
1.2.2 Used of Computer Software used in design analysis, as follow :
Ms.Excel
SAP200 V.15.1,
AFES 3.0
1.3 CODE AND STANDARD
1.3.1 General Codes and Standard
 SNI 03-2847-2002 -Tata Cara Perencanaan Struktur Beton untuk Bangunan Gedung
 American Concrete Institute ACI 318.
 Principles of Foundation Engineering.
 SNI 03-1727-2013 Beban Minimum untuk Perancangan Bangunan Gedung dan
Struktur Lain.
 Aboveground Storage Tanks by Philip E.Myers
1.3.2 Spesific Codes and Standard
- Civil General Specification- Pertamina International Timor.

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :5/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

1.4 USED MATERIAL AND ALLOWABLE STRESS


No. Description Size Units
1 Compres s i ve s trength concrete founda tion
K: 420 kg/cm2
fc' 34.86 MPa
2 Yi el d Strength Reba r BJTD-420
fys: 4,200 kg/cm2
420 MPa
3 Gra vi ty of concrete Ýc: 2,400 kg/cm2
240 MPa
4 Gra vi ty of s a nd Ýs: 1,700 kg/cm2
170 MPa
5 Gra vi ty of ba s ecours e Ýs: 2,000 kg/cm2
200 MPa
6 Gra vi ty of wa ter Ýw: 1,000 kg/cm2
100 MPa
7 Gra vi ty of a s pha l t s a nds heet Ýas: 2,000 kg/cm2
200 MPa

1.5 OTHER REQUIREMENT DATA


A. TANK DATA

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :6/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

B. FOUNDATION DATA

Where :
do = diameter outside foundation
dt = diameter tank

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :7/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

1.6 REFERENCE MECHANICAL LOADING DATA


- Equipment data sheet storage tank 2500 KL
- Reference drawing storage tank 2500 KL

2. PROPERTIES OF FOUNDATION
2.1 DIMENSION OF FOUNDATION
Properties Foundation
No. Description Size Units
1 Dia. Tank (dt) 18.5 m
2 Dia. Baseplate (dbp )
Outside basseplate from outside tank (sbp) 18.62 m
3 Dia. oustide foundation (do)
do 20 m
Inside diameter foundation (di) 17 m
diameter baseplate (dbp) 18.674 m
Width slab foundation (Bs) (do-di)*0.5 1.50 m
Space outside baseplate to outside foundation (se) 0.663 m
4 Dimension Ringwall (rw)
Outside diameter ringwall (drw) 19.20 m
Inside diameter ringwall (drwi) 17.80 m
Height of ringwall (hrw) 1.00 m
Width of ringwall (wrw) 0.70 m
Edge space from slab foundation to ringwall beam (srb) (Bs-srb)*0.5 0.40 m
4 Total Height Of Foundation (Hf) hf = ha+hb+hs 1.00 m
Height of foundation above surface (ha) 0.60 m
Height of foundation below surface (hb) 0.40 m
Height of Slab (hs) 0.70 m
5 Height Of Filler Layer (hfi) hfi = hsf+has 1.10 m
Height Of Sandfill (hsf) 0.10 m
Height Of Basecourse (hbs) 0.95 m
Height of Asphalt Sandsheet (has) 0.05 m

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :8/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :9/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

3. LOADING DATA
3.1 TABLE LOADING DATA TANK
Based on reference loading data :
Load Data Tanki Gasoline 2500 KL Load Data Tanki HSD 2500 KL
No. Description Capacity Units No. Description Capacity Units
1 Capacity 2500 m3 1 Capacity 2500 m3
2 2 Erection Weight (EE) : 79,974.00 Kg
Erection Weight (EE) : 74,735.00 Kg
Shell Plate: 41,488.00 Kg Shell Plate: 37,721.00 Kg

Bottom + Annular Plate: 16,072.00 Kg Bottom + Annular Plate: 17,083.00 Kg

Roof Plate: 12,085.00 Kg Roof Plate: 12,764.00 Kg


Stiffener 711.00 Kg
Stiffener 692.00 Kg
Wind Girders 5,374.00 Kg
Rafter 4,078 Kg
Rafter 5,961 Kg
Anchor Chairs 320 Kg
3 Anchor Chairs 360 Kg
Operational Weight (EO): 2,231,868.26 Kg
3 Operational Weight (EO): 2,234,573.29 Kg
Erection Weight : 74,735.00 Kg
Erection Weight : 79,974.00 Kg
Liquid Weight: 2,157,133.26 Kg
Liquid Weight: 2,154,599.29 Kg

4 Test Weight (ET): 2,771,158.49 Kg 4 Test Weight (ET): 2,773,230.96 Kg


Hydrotest Weight: 2,696,423.49 Kg
Hydrotest Weight: 2,693,256.96 Kg
Erection Weight: 74,735.00 Kg Erection Weight: 79,974.00 Kg
5 Wind Load 5 Wind Load
Wind Moment (Mw) 4,760,532.12 N.m Wind Moment (Mw) 4,822,837.38 N.m
485,273.41 Kg.m 491,624.61 Kg.m
6 Seismic Load 6 Seismic Load
Seismic Base Shear Force (Ve) 60,549.72 Kg Seismic Base Shear Force (Ve) 59,231.02 Kg
Seismic Moment (Me) 4,383,496.14 N.m Seismic Moment (Me) 4,281,837.38 N.m
446,839.57 Kg.m 436,476.80 Kg.m

Load Data Tanki Multi Product 2500 KL


No. Description Capacity Units
1 Capacity 2500 m3
2 Erection Weight (EE) : 79,974.00 Kg
Shell Plate: 37,721.00 Kg
Bottom + Annular Plate: 17,083.00 Kg
Roof Plate: 12,764.00 Kg
Stiffener 711.00 Kg
Wind Girders 5,374.00 Kg
Rafter 5,961 Kg
Anchor Chairs 360 Kg
3 Operational Weight (EO): 2,234,573.29 Kg
Erection Weight : 79,974.00 Kg
Liquid Weight: 2,154,599.29 Kg

4 Test Weight (ET): 2,773,230.96 Kg


Hydrotest Weight: 2,693,256.96 Kg
Erection Weight: 79,974.00 Kg
5 Wind Load
Wind Moment (Mw) 4,822,837.38 N.m
491,624.61 Kg.m
6 Seismic Load
Seismic Base Shear Force (Ve) 59,231.02 Kg
Seismic Moment (Me) 4,281,837.38 N.m
436,476.80 Kg.m

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :10/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

From above reference loading data, we will take maximum loading data at HSD Tank 2500 KL
and Multi Product Tank 2500 KL

3.2 TABLE LOADING DATA SELFWEIGHT FOUNDATION


No. Description Size Units
6 Total Weight Of Foundation (Wt) Wt = Ws+Wrw+Wsf+Was 417,854 Kg
Weight Of Slab (Ws) (0.25*3.14*(do^2-di^2)*(hs)* Ýc) 146,387 Kg
Weight Of Ringwall (Wrw) (0.25*3.14*(drw^2-drwi^2)*hrw*Ýc 97,591 Kg
Weight of Sandfill (Wsf) ((0.25*3.14*(do^2-(do-
66,680 Kg
2*srb)^2)*hb)+(0.25*3.14*(do^2-(do-2*(wrw+srb))^2)*(hsf)))*Ýs
Weight of Basecourse (0.25*3.14*(do^2-(do-2*(wrw+srb))^2)*(hbs)*Ýs 78,337 Kg
Weight of asphalt sandsheet (Was) (0.25*3.14*(dbp+0.5)^2*has*Ýas 28,860 Kg

4. LOAD COMBINATION
Based on SNI-1727-2013, nominal combination load use allowable strength design (page 13 from
195) and for reinforcement use factored combination load. The nominal combination load &
factored combination load can be shown below:

Nominal combination load


 Comb.4 : SWL+DL+ET  Permanent Load
 Comb.5 : SWL + DL +ET+0.7Ex  Temporary Load 1
 Comb.6 : SWL + DL + ET + 0.6Wx  Temporary Load 2

Factored Load
 Comb.1 : 1.4SWL+1.4DL+1.4ET  Permanent Load
 Comb.2 : 1.2SWL + 1.2DL + 1.2ET + 1Ex  Temporary Load 1
 Comb.3 : 1.2SWL + 1.2DL + 1.2ET+ 1.3Wx  Temporary Load 2

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :11/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

5. PILE DESIGN ANALYSIS


For determine pile capacity depend on soil investigation, so we will use latest soil investigation
below:

5.1 N-SPT REPORT

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :12/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

”From above data, we will take assumption depth of used foundation is approx. 50-55m”

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :13/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

5.2 PILE CAPACITY & ESTIMATE NUMBER PILE


A. Axial Pile Capacity

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :14/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

From above data, we will take cast in situ concrete pile type with strength concrete 35 MPa
because tensile strength for precast concrete pile is zero (0).

Refer to soil investigation report (report no. GET-21-8023) page 72 by Geotechnical LDA, we
will use foundation type with slab foundation (with pile concrete below) and ring beam above
slab foundation for support storage tank plate (shell plate, baseplate, edge of cone roof, and
windgirders). For annular plate, bottom plate, cone roof, and liquid will be supported by soil
improved with boulder & base course below with specified allowable soil bearing capacity.
 RESULTS
From above table, we can take ultimate axial pile capacity and ultimate pull out pile
capacity.
 Ultimate Axial Pile Capacity
Qu = 2050 kN
 Ultimate Pull-out Pile Capacity
QPu =1550 kN

B. Unconsolidated Undrained Tri-Axial Compression Results Data

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :15/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

C. Horizontal Pile Capacity


No. Description Size Units
1 Diameter Pile (dpile) dpile : 0.4 m
2 Ultimate Horizontal Pile Capacity (Hult)
Compressive strength borepile (K) 420.00 kg/m2
fc' (Mpa) 34.86 Mpa
Poison ratio of soil (us) 0.30
Young modulus of soil (Es) 10,350 kN/m2
Moment inertia of the pile (Ip) 1/64*3.14*(dpile)^4 125,600 cm4
0.00126 m4
Young modulus of the pile (Ep) 27,749.91 MPa
27,749,908 kN/m2
Constant of modulus horizontal subgrade reaction (nh) 9,000 kN/m3
Allowable displacement at the top of pile (xz) 20 mm
Characteristic length of soil-pile system (T'') 1 m
Lp/T'' 38
(If Lp/T'' > 5, so this is long pile) LONGPILE
"For long pile, refer Brom Method lateral pile resistance in and use below graphic"
Modulus section (Sxy) =Ip / (0.5*Dpile) 0.006 m3
Resistance Pile Moment (Mypile) = Sxy*fc' 219 kN.m
Internal friction of soil (ɸ) 30 Deg
Rankine Passive Pressure (Kp2) =tan(45deg+(ɸ/2)deg)^2 2
Yield Moment (axis line) 243.83 kN.m
Ultimate Lateral Resistance Vu (ordinat line), based on interpolation
graphic (Hult) 80 kN

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :16/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

Interpolation Graphic Yield Moment & Ultimate Lateral Resistance in Sand , Brom Method,
Braja M.Das

D. Allowable Pile Capacity

No. Description Size Units


3 Length Pile (Lpile) Lpile : 55.00 m
4 Ultimate Axial Pile Capacity (Qult) Qult : 2,050 kN
5 Allowable Axial Pile Capacity (Qall) Qall : 820 kN

82 Ton
Safety Factor (SF) 2.5
6 Allowable Horizontal Pile Capacity Hall: 32.00 kN
3.20 Ton
Safety Factor (SF) 2.50
7 Used allowable axial & horizontal pile capacity
Reduction Factor (Ø) 0.90
Pile Group efficiency (ef) 0.90
Used allowable axial pile capacity (Qallused) 66.42 Ton
Used allowable horizontal pile capacity (Hallused) 2.6 Ton
8 Load Foundation (V) 3,189 Ton
Maximum load tank : [MAX(EE,EO,ET)] 2,771 Ton
Weight Foundation (Wt) 418 Ton

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :17/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

E. Estimated Number Pile


No. Description Size Units
9 Estimate Number Of Pile
Minimum distance to edge of foundation : (1.5.dpile) 0.6 m
Taken 0.75 m
Minimum space between pile : (3 dpile) 1.2 m
Diameter circle of pile group : [docircle = do - (2x1.5 dpile)] 18.8 m
Dimension of square area : (bs = 0.25*3.14*docircle^2)^0.5 16.66 m
Estimate Number Of Pile : [Ʃn = (V/Qallused)] 53.20 Pcs
Number of pile for each side square area : [N= (Ʃn)^0.5] 7.3 Pcs
Estimated distance between pile : [Ss = bs/(N-1)] 2.646 m
Used distance between pile practice (trial & error)
Ssused(min): 2.325 m
nused: 61 pcs
ARRANGEMENT PILE

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :18/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

6. FOUNDATION ANALYSIS
6.1 3D Modelling & Pile Arrangement

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :19/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

6.2 Setting Dimension & Constant Data

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :20/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :21/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

6.3 Input Load Data & Load Combination

Self-weight foundation is calculated


automatically by program

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :22/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

Weight of filler and asphalt sand-sheet

Operation Load

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :23/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

Test Load

Wind Load

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :24/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

Earthquake Load

6.4 Input Reinforcement Pile Cap

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :25/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

6.5 Output Analysis Pile Cap & Pile Capacity


A. Output Load Combination

 Load Combination In Pier Top (Without SW)

 Load Combination In Footing Bottom (With Pier SW)

 Load Combination In Footing Bottom (With Pier & Footing SW)

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :26/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

B. Check Pile Capacity


 Formula

 Vertical & Up Reaction

 Horizontal Reaction

C. Check Footing/Pile Cap Reinforcement


 Formula

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :27/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

 Check Footing Reinforcement X Direction

 Check Footing Reinforcement Y Direction

D. Check One Way Shear Force


 Formula

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :28/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

 One Way Shear Force

E. Check Two Way Shear Force


 Formula

 Two Way Shear Force

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :29/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

F. Check Pile Punching Shear


 Formula

 Pile Punching Shear

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :30/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

6.6 Ring wall Analysis


A. Internal Force

B. Parameter Design

No. Description Size Units


1 Fi l l i ng Ma teri a l : s a nds tone
Internal friction of soil (ɸ) 30 Deg
Coefficient for rest condition of soil (Ko=1-sinɸ) 0.5
Coeffi ci ent for a ctive pres s ure of s oi l (Ka =ta n^2(45-ɸ/2)) 0.33
Coeffi ci ent for pa s s i ve pres s ure of s oi l (Ka =ta n^2(45+ɸ/2)) 3.00
2 Loa di ng da ta ri ng bea m (qrb)
Weight of tank & fluida (above ring beam, approx 20%) 51.33 Ton
Weight of ringbeam and asphat sandhseet 126.45 Ton
Loading data ring beam (wrb) 177.78 Ton
Area ringbeam (Arb) 248.72 m2
qrb=wrb/Arb 0.71 Ton/m2
H1 = 1.4*(Ko x q) 1.001 Ton/m
3 Loa d from fi l l i ng ma teri a l under tank (H2)
H2=1.2*(Ko*Ýs*hsf) 1.32 Ton/m'
4 Ul tima te Tens i on Ri ng Wa l l (Tu)
Diameter ring beam(drw=do-(2*wrw)) 19.20 m
T=(0.5*drw)*(H1*hrw)*(0.5*H2*hrw) 6.34 Ton
5 Moment & Shea r force ri ngwa l l due to wei ght, s hel l pl a te & l i qui d (Mrw)
Weight empty tank at ringwall (Eerw): 51.33 Ton
Roundness ringbeam(roundrw): 60.29 m
Weight liquid between ringwall at ID Tank (W1): 538.65 Ton
Ultimate weight liquid+empty tank ring wall (qrw=1.2*(Eerw+W1)/roundrw): 12.94 Ton/m
Space pile at ring wall position (Ssrw): 2.395 m
Moment force ringwall (Mrw=1/12*qrw*Ssrw^2): 6.19 Ton.m
Shear force ring wall (Srw= 1/2*qrw*Ssrw): 15 Ton

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :31/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

C. Reinforcement Ringwall
Longitudinal Reinforcement
Moment Ultimate Mu = 61.9 KNm
Compressive Strength of Concrete fc' = 35.00 Mpa
Yield Strength of Reinforcing Steel fy = 420 Mpa
Diameter of Reinforcement Used D= 16 mm
Area of Reinforcement As = 0.25 * π * D2 As = 201.062 mm2
Thickness of Ringbeam h = 1000 mm
Distance Center of Reinforcement to the Edge of Concrete d' = 75 mm
Effective Thickness of ring beam dy = h - d' - 0.5D - D dy = 901.0 mm
Reduction Factor of Flexural Strength (SNI 03-2847-2013 ps 9.3.2.7) f = 0.8
Distribution Factor of Concrete Pressure (SNI 03-2847-2013 ps 10.2.7.3) b1 = 0.85
Balance Reinforcement Ratio (SNI 03-2847-2013 Lampiran B 8.4.2)
r b = ((b1 * 0.85 * fc’) / fy) * (600 / (600 + fy)) r b = 0.035
Maximum Reinforcement Ratio (SNI 03-2847-2013 ps 21.5.2.1) r max = 0.025
Maximum Reinforcement Ratio (SNI 03-2847-2013 Lampiran B 10.3.3) r max= 0.75 * ρb r max = 0.027
Maximum Reinforcement Ratio Used r max used = 0.025
Minimum Reinforcement Ratio Used (SNI 03-2847-2013 ps 7.12.2.1 (b)) r min used = 0.0018
Coefficient (m) m = fy / (0.85 * fc') m = 14.118
Coefficient of Sectional Capacity (Rn) Rn = Mu / (f * b * dy2) Rn = 0.09531
Reinforcement Ratio Needed 1 2 xmxRn  r = 0.0002
r  1  1  

m fy 
Reinforcement Ratio Used r min < r used < r max r used = 0.0018
Area of Reinforcement Needed As needed = ρ * b * dy As needed = 1135 mm2
b = 700 mm
Number of Reinforcement Used n = As needed/As n= 5.646 Pcs
Taken number rebar nused= nused= 8.000 Pcs

Shear Reinforcement
CALCULATION DATA
Shear Loads Ultimate Vu = 150000 N
Compressive Strength of Concrete fc' = 350.00 Mpa
Yield Strength of Reinforcing Steel fy = 420 Mpa
Width of Ringwall Bp = 700 mm
Length of Ringwall Lp = 1000 mm
Diameter of Reinforcement D longitudinal = 16 mm
Diameter of Reinforcement D stirrups = 10 mm
Distance Center of Reinforcement to the Edge of Concrete d' = 75 mm
Effective Thickness of Ringwall d = b - d' - D sengkang - 0.5 D utama d= 607.0 mm
Shear Loads Ultimate Vu=Tu+Srw Vu = 223400 N
Column Shear Control Vc = 1/6 * fc'^0.5 * b * d Vc = 2,809,361.09 N
(Use minimum shear reinforcement D10-150) Vc > Tu = OK
Distance of Reinforcement (SNI 03-2847-2013 ps 21.6.4.3) s max = 1/4 * b s max = 250.0
Distance of Shear Reinforcement Used s used = 150 mm

“Ring beam/ring wall use dimension 700mm x 1000mm (Longitudinal rebar 8D16 top &
bottom, Additional bar 3D13, and stirrups bar D10-150)”

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :32/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

7. REINFORCEMENT BOREPILE
LONGITUDINAL REBAR REINFORCEMENT BOREPILE

fc': 422 kg/cm2 (K-500)


fy: 4200 kg/cm2 (Yield Strength Steel Rebar)
Dborepile: 0.4 m (Diameter Borepile)
A borepile 0.1256 m2 (Area Borepile)
drebar borepile: 16 mm (Diameter Rebar Borepile)
As drebar borepile: 0.00020096 m2 (Area Diameter Rebar)
n Rebar 10 Pcs (Number of rebar borepile)
Total Asrebar borepile: 0.0020096 m2 (Total area rebar borepile)
Ru: 59.94 Ton (Axial Load Single Borepile)
Ru used: 83.92 Ton (1.4*Ru)
Fx: 2.6 Ton (Horizontal Load Single Borepile)
Fx used: 3.64 Ton (1.4*Fx)
Fy 2.6 Ton (Hprizotal Load Single Borepile)
Fy used: 3.64 Ton (1.4*Fy)
cc: 75 mm (Concrete Cover)
Deff: 0.218 m (Effective Diameter Borepile)
Ø: 0.7
Pnm used 313798.768 Kg
313.798768 Ton
Ru used < Pnm used : OK Pnmused (Axial allowable concrete borepile)

STIRRUPS BAR BOREPILE

Vused: 3.64 Ton


Ø2 : 0.6 (Shear Reduction Factor)
Length borepile 9m
fy: 4000 kg/cm2 (Yield Strength Steel Rebar)
Dborepile: 0.45 m (Diameter Borepile)
A borepile 0.1589625 m2 (Area Borepile)
drebar borepile: 10 mm (Diameter Stirrups Rebar Borepile)
As drebar borepile: 0.0000785 m2 (Area Diameter Rebar)
cc: 75 mm (Concrete Cover)
Deff2 : 0.250 m (Effective core diameter borepile)
Vcmax 9.48795181 Ton (Shear allowable concrete borepile)
V used < Vcmax OK!! (Vcmax = 0.2*fc'*Deff2*Dborepile)
Use minimum stirrups reinforcement (D10-150)

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :33/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

8. RESUME
8.1 Arrangement Pile & Join Connection To Pile Cap
 Arrangement Pile

 Joint connection to pile cap

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :34/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

8.2 Reinforcement Pile Cap & Ring Wall

8.3 Borepile Reinforcement

PIT-TNK-LGC-CS-CA-001
Document Number:
JASA KONSULTAN PENYUSUNAN DETAIL PIT-TNK-LGC-CS-CA-001
ENGINEERING DESIGN (DED)
PEMBANGUNAN TANGKI TIMBUN 3x2500 KL
PERTAMINA INTERNATIONAL TIMOR, SA Rev.Number :A

Page :35/35
CALCULATION SHEET FOR STORAGE
TANK 3X2500 KL FOUNDATION Date :20/12/21

8.4 Maximal Pile Capacity


 Axial Capacity
Allowable used axial pile capacity is 66.42 Ton
Maximum load axial pile is 65.678 Ton
 Horizontal Capacity
Allowable used horizontal pile capacity is 2.6 Ton
Maximum load horizontal pile is 0.9 Ton
 Depth Drill Borepile
Pile must be injected into soil until reach hard soil. Based in final investigation report results
depth hard soil in 55 m. Pile capacity must be tested with PDA test at site.

8.5 Yield strength rebar and compressive strength concrete


 Deform Rebar
Used rebar is deform rebar BJTS-420B
 Compressive strength concrete
Concrete foundation use K-420 (fc 35 MPa)
Lean concrete use K-175 (fc’ 14.5 MPa)

8.6 Soil Improvement


 Area below lean concrete must be replaced with compacted soil fill if there is soft clay in this
elevation (CBR 8-10%)
 For area embankment will be filled with sandfill, basecourse A, and boulder& gravel. Top will
be covered with concrete floor 150mm

PIT-TNK-LGC-CS-CA-001
ATTACHMENT -1 MECHANICAL TANK DRAWING
ATTACHMENT-2 LOAD DATA TANK
Strength Calculation Doc. No.
Storage Tank 2500KL (GASOLINE TANK) PIT-TNK-LGC-ME-CA-001

DETAIL ENGINEERING DESIGN (DED) REV. C1 Page 47 of 48


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

CAPACITIES and WEIGHTS Back

Maximum Capacity (to Max Liq Level) : 2,697 M^3


Capacity to Top of Shell (to Tank Height) : 3,206 M^3
Working Capacity (to Normal Working Level) : 2,497 M^3
Net working Capacity (Working Capacity - Min Capacity) : 2,312 M^3
Minimum Capacity (to Min Liq Level) : 184 M^3

Component New Condition (N) New Condition (Kg) Corroded (N) Corroded (Kg)
SHELL 406,857 41,488 242,586 24,737
ROOF 118,508 12,085 98,756 10,071
RAFTERS 39,992 4,078 58,358 5,951
GIRDERS 0 0 0 0
FRAMING 0 0 0 0
COLUMNS 0 0 0 0
BOTTOM 157,610 16,072 110,327 11,251
STAIRWAYS 0 0 0 0
STIFFENERS 6,781 692 6,781 692
WIND GIRDERS 0 0 0 0
ANCHOR CHAIRS 3,139 320 3,139 320
INSULATION 0 0 0 0
TOTAL 732,887 74,735 519,947 53,022

Weight of Tank, Empty : 732,887 N


Weight of Tank, Full of Product (SG = 0.8) : 21,894,627.615 N
Weight of Tank, Full of Water : 27,185,064.7534 N
Net Working Weight, Full of Product : 20,443,253.1101 N
Net Working Weight Full of Water : 25,370,844.6376 N

Foundation Area Req'd : 156.3665 m^2


Foundation Loading, Empty : 4,686.98 N/m^2
Foundation Loading, Full of Product : 135,334.1744 N/m^2
Foundation Loading, Full of Water : 169,167.7307 N/m^2

SURFACE AREAS
Roof : 256.8387 m^2
Shell : 712.5132 m^2
Bottom : 156.3665 m^2

Wind Moment : 4,760,532.1219 N-m


Seismic Moment : 4,383,496.1407 N-m

MISCELLANEOUS ATTACHED ROOF ITEMS


MISCELLANEOUS ATTACHED SHELL ITEMS
Strength Calculation Doc. No.
Storage Tank 2500KL (GASOLINE TANK) PIT-TNK-LGC-ME-CA-001

DETAIL ENGINEERING DESIGN (DED) REV. C1 Page 48 of 48


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

MAWP & MAWV SUMMARY Back

MAWP = Maximum calculated internal pressure


MAWV = Maximum calculated external pressure

MAXIMUM CALCULATED INTERNAL PRESSURE

MAWP = 18 kPa or 1,835.658 mmh2o (per API-650 App. F.1.3 & F.7)
MAWP = 25.8166 kPa or 2,632.8027 mmh2o (due to shell)
MAWP = 1.2364 kPa or 126.0893 mmh2o (due to roof)
TANK MAWP = 1.2364 kPa or 126.0846 mmh2o

MAXIMUM CALCULATED EXTERNAL PRESSURE

MAWV = -6.9 kPa or -703.6689 mmh2o (per API-650 V.1)


MAWV = N/A (due to shell) (API-650 App.V not applicable)
MAWV = -1.0191 kPa or -103.9288 mmh2o (due to roof)
TANK MAWV = -1.0191 kPa or -103.9246 mmh2o
Strength Calculation Doc. No.
HSD Tank 2500KL PIT-TNK-LGC-ME-CA-002

DETAIL ENGINEERING DESIGN (DED) REV. C2 Page 44 of 45


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

CAPACITIES and WEIGHTS Back

Maximum Capacity (to Max Liq Level) : 2,694 M^3


Capacity to Top of Shell (to Tank Height) : 2,903 M^3
Working Capacity (to Normal Working Level) : 2,494 M^3
Net working Capacity (Working Capacity - Min Capacity) : 2,299 M^3
Minimum Capacity (to Min Liq Level) : 195 M^3

Component New Condition (N) New Condition (Kg) Corroded (N) Corroded (Kg)
SHELL 369,909 37,721 225,196 22,964
ROOF 125,169 12,764 104,307 10,637
RAFTERS 58,453 5,961 58,453 5,961
GIRDERS 0 0 0 0
FRAMING 0 0 0 0
COLUMNS 0 0 0 0
BOTTOM 167,518 17,083 117,263 11,958
STAIRWAYS 0 0 0 0
STIFFENERS 6,968 711 6,968 711
WIND GIRDERS 52,696 5,374 52,696 5,374
ANCHOR CHAIRS 3,531 360 3,531 360
INSULATION 0 0 0 0
TOTAL 784,244 79,974 568,414 57,965

Weight of Tank, Empty : 784,244 N


Weight of Tank, Full of Product (SG = 0.8) : 21,921,163.9839 N
Weight of Tank, Full of Water : 27,205,395.6687 N
Net Working Weight, Full of Product : 20,388,037.3483 N
Net Working Weight Full of Water : 25,288,985.6854 N

Foundation Area Req'd : 167.6448 m^2


Foundation Loading, Empty : 4,678.0072 N/m^2
Foundation Loading, Full of Product : 126,081.5067 N/m^2
Foundation Loading, Full of Water : 157,601.8934 N/m^2

SURFACE AREAS
Roof : 271.2755 m^2
Shell : 627.6902 m^2
Bottom : 167.6448 m^2

Wind Moment : 4,822,837.3808 N-m


Seismic Moment : 4,281,901.4209 N-m

MISCELLANEOUS ATTACHED ROOF ITEMS


MISCELLANEOUS ATTACHED SHELL ITEMS
Strength Calculation Doc. No.
HSD Tank 2500KL PIT-TNK-LGC-ME-CA-002

DETAIL ENGINEERING DESIGN (DED) REV. C2 Page 45 of 45


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

MAWP & MAWV SUMMARY Back

MAWP = Maximum calculated internal pressure


MAWV = Maximum calculated external pressure

MAXIMUM CALCULATED INTERNAL PRESSURE

MAWP = 18 kPa or 1,835.658 mmh2o (per API-650 App. F.1.3 & F.7)
MAWP = 27.4611 kPa or 2,800.5104 mmh2o (due to shell)
MAWP = 1.2638 kPa or 128.8836 mmh2o (due to roof)
TANK MAWP = 1.2638 kPa or 128.8806 mmh2o

MAXIMUM CALCULATED EXTERNAL PRESSURE

MAWV = -6.9 kPa or -703.6689 mmh2o (per API-650 V.1)


MAWV = N/A (due to shell) (API-650 App.V not applicable)
MAWV = -0.9186 kPa or -93.6797 mmh2o (due to roof)
TANK MAWV = -0.9186 kPa or -93.6805 mmh2o
Strength Calculation Doc. No.
HSD Tank 2500KL PIT-TNK-LGC-ME-CA-002

DETAIL ENGINEERING DESIGN (DED) REV. C Page 44 of 45


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

CAPACITIES and WEIGHTS Back

Maximum Capacity (to Max Liq Level) : 2,694 M^3


Capacity to Top of Shell (to Tank Height) : 2,903 M^3
Working Capacity (to Normal Working Level) : 2,494 M^3
Net working Capacity (Working Capacity - Min Capacity) : 2,299 M^3
Minimum Capacity (to Min Liq Level) : 195 M^3

Component New Condition (N) New Condition (Kg) Corroded (N) Corroded (Kg)
SHELL 369,909 37,721 225,196 22,964
ROOF 125,169 12,764 104,307 10,637
RAFTERS 58,453 5,961 58,453 5,961
GIRDERS 0 0 0 0
FRAMING 0 0 0 0
COLUMNS 0 0 0 0
BOTTOM 167,518 17,083 117,263 11,958
STAIRWAYS 0 0 0 0
STIFFENERS 6,968 711 6,968 711
WIND GIRDERS 52,696 5,374 52,696 5,374
ANCHOR CHAIRS 3,531 360 3,531 360
INSULATION 0 0 0 0
TOTAL 784,244 79,974 568,414 57,965

Weight of Tank, Empty : 784,244 N


Weight of Tank, Full of Product (SG = 0.8) : 21,921,163.9839 N
Weight of Tank, Full of Water : 27,205,395.6687 N
Net Working Weight, Full of Product : 20,388,037.3483 N
Net Working Weight Full of Water : 25,288,985.6854 N

Foundation Area Req'd : 167.6448 m^2


Foundation Loading, Empty : 4,678.0072 N/m^2
Foundation Loading, Full of Product : 126,081.5067 N/m^2
Foundation Loading, Full of Water : 157,601.8934 N/m^2

SURFACE AREAS
Roof : 271.2755 m^2
Shell : 627.6902 m^2
Bottom : 167.6448 m^2

Wind Moment : 4,822,837.3808 N-m


Seismic Moment : 4,281,901.4209 N-m

MISCELLANEOUS ATTACHED ROOF ITEMS


MISCELLANEOUS ATTACHED SHELL ITEMS
Strength Calculation Doc. No.
HSD Tank 2500KL PIT-TNK-LGC-ME-CA-002

DETAIL ENGINEERING DESIGN (DED) REV. C Page 45 of 45


PEMBANGUNAN TANGKI TIMBUN 3X2500KL Date : 14 Nov 2021

MAWP & MAWV SUMMARY Back

MAWP = Maximum calculated internal pressure


MAWV = Maximum calculated external pressure

MAXIMUM CALCULATED INTERNAL PRESSURE

MAWP = 18 kPa or 1,835.658 mmh2o (per API-650 App. F.1.3 & F.7)
MAWP = 27.4611 kPa or 2,800.5104 mmh2o (due to shell)
MAWP = 1.2638 kPa or 128.8836 mmh2o (due to roof)
TANK MAWP = 1.2638 kPa or 128.8806 mmh2o

MAXIMUM CALCULATED EXTERNAL PRESSURE

MAWV = -6.9 kPa or -703.6689 mmh2o (per API-650 V.1)


MAWV = N/A (due to shell) (API-650 App.V not applicable)
MAWV = -0.9186 kPa or -93.6797 mmh2o (due to roof)
TANK MAWV = -0.9186 kPa or -93.6805 mmh2o
ATTACHMENT-3

PILE CAPACITY SOIL INVESTIGATION REPORT


35 Mpa
35 Mpa
Ultimate Pile Capacity Vs Depth
Pre-Cast Square Concrete 35 Mpa/ H-Steel Pile (0.4 m diameter)
imate Pile Capacity Vs Depth
Pre-Cast Square Concrete 35 Mpa / H-Steel Pile (1.0 m Diameter
DETAILS OF FUEL TANK FOUNDATION

Pedestal Foundation (35 Mpa)

Pile Cap (35 Mpa)

Pile Foundation (35 Mpa)

Depth please see recomendation Pile Analys by API Method


DETAILS OF FUEL TANK FOUNDATION