DELIVERY LIST

Project Name : TDJV-NSCR DEPOT (WORKSHOP) Date Prepared: May 2, 2022


JO No. / WBS No.: 2088-02

Drawing / Revision LOCATION / DIMENSION DELIVERY SCHED


No. GRIDLINE SHOPMARK QTY DESCRIPTION UNIT WEIGHT TOTAL WEIGHT CLIENT ACCEPTANCE REMARKS
WIDTH HEIGHT LENGTH PLAN ACTUAL DR. NO.

MEZZANINER GIRDER (CEILING)


NSCR-CP01-88-SS23-SD-D01-
8356
REV. 5 (08.04.2022)
GL 19 / A-B MG9-211 1 MEZZANINE BEAM 471.23 kg 471.23 kg 0.171m 0.351m 9.635m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-220106-1266

NSCR-CP01-88-SS23-SD-D01-
8356
REV. 5 (08.04.2022)
GL 19 / A-B MG10-211 1 MEZZANINE BEAM 477.00 kg 477.00 kg 0.171m 0.351m 9.638m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-220106-1266

NSCR-CP01-88-SS23-SD-D01-
8357
REV. 4 (03.02.2022)
GL 18 / A-B MG11-212 1 MEZZANINE BEAM 473.13 kg 473.13 kg 0.171m 0.351m 0.096m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8357
REV. 4 (03.02.2022)
GL 18 / A-B MG12-212 1 MEZZANINE BEAM 476.79 kg 476.79 kg 0.171m 0.351m 9.638m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

MEZZANINER BEAM (CEILING)


NSCR-CP01-88-SS23-SD-D01-
8404
REV. 3 (21.03.2022)
GL 18-19 / A MB31-347 1 MEZZANINE BEAM 322.86 kg 322.86 kg 0.102m 0.312m 9.625m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8404
REV. 3 (21.03.2022)
GL 18-19 / A-B MB32-347 1 MEZZANINE BEAM 463.71 kg 463.71 kg 0.171m 0.351m 9.809m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8402
REV. 5 (21.03.2022)
GL 18-19 / A-B MB28-345 #1 1 MEZZANINE BEAM 458.29 kg 458.29 kg 0.171m 0.351m 9.809m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8402
REV. 5 (21.03.2022)
GL 18-19 / A-B MB28-345 #2 1 MEZZANINE BEAM 458.29 kg 458.29 kg 0.171m 0.351m 9.809m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8405
REV. 4 (21.03.2022)
GL 18-19 / A-B MB33-348 1 MEZZANINE BEAM 456.07 kg 456.07 kg 0.171m 0.351m 9.809m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8405
REV. 4 (21.03.2022)
GL 18-19 / A-B MB42-350 1 MEZZANINE BEAM 66.54 kg 66.54 kg 0.102m 0.206m 2.935m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8411
REV. 4 (21.03.2022)
GL 18-19 / A-B MB52-354 1 MEZZANINE BEAM 102.48 kg 102.48 kg 0.102m 0.206m 4.355m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8410
REV. 4 (03.03.2022)
GL 18-19 / A-B MB51-353 1 MEZZANINE BEAM 102.48 kg 102.48 kg 0.102m 0.206m 4.355m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8411
REV. 4 (21.03.2022)
GL 18-19 / A-B MB53-354 #1 1 MEZZANINE BEAM 90.29 kg 90.29 kg 0.102m 0.206m 4.355m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8411
REV. 4 (21.03.2022)
GL 18-19 / A-B MB53-354 #2 1 MEZZANINE BEAM 90.29 kg 90.29 kg 0.102m 0.206m 3.935m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8408
REV. 5 (03.03.2022)
GL 18-19 / A-B MB45-351 #1 1 MEZZANINE BEAM 51.84 kg 51.84 kg 0.102m 0.206m 2.309m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8408
REV. 5 (03.03.2022)
GL 18-19 / A-B MB45-351 #2 1 MEZZANINE BEAM 51.84 kg 51.84 kg 0.102m 0.206m 2.309m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8149
REV. 5 (21.03.2022)
GL 18-19 / A-B MB112-309-A #1 1 MEZZANINE BEAM 95.88 kg 95.88 kg 0.102m 0.206m 4.184m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8149
REV. 5 (21.03.2022)
GL 18-19 / A-B MB112-309-A #2 1 MEZZANINE BEAM 95.88 kg 95.88 kg 0.102m 0.206m 4.184m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8149
REV. 5 (21.03.2022)
GL 18-19 / A-B MB113-309 #1 1 MEZZANINE BEAM 99.59 kg 99.59 kg 0.102m 0.206m 4.350m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8150
REV. 4 (21.03.2022)
GL 18-19 / A-B MB116-309-A 1 MEZZANINE BEAM 100.96 kg 100.96 kg 0.102m 0.206m 4.350m CP01-88-BL-IR-DPO-0298 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

MAIN COLUMN
NSCR-CP01-88-SS23-SD-D01-
8025
REV. 6 (08.04.2022)
GL 20-A C2_C6-06 1 MAIN COLUMN 3,605.36 kg 3,605.36 kg 0.356m 2.284m 12.438m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-220106-1266

MAIN RAFTER
NSCR-CP01-88-SS23-SD-D01-
8052
REV. 6 (08.04.2022)
GL 19 / D-E R12-112 1 MAIN RAFTER 1,305.66 kg 1,305.66 kg 0.325m 0.612m 8.011m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-220106-1266

ELEVATION AT GRIDLINE A (MEZZANINE INTERMEDIATE COLUMNS)


NSCR-CP01-88-SS23-SD-D01-
8319
REV. 6 (18.04.2022)
GL 18-19 / A CS1_C12-63 1 INTERMEDIATE COLUMN 377.41 kg 377.41 kg 0.133m 0.207m 6.619m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8321
REV. 6 (18.04.2022)
GL 18-19 / A CS1_C14-65 1 INTERMEDIATE COLUMN 375.92 kg 375.92 kg 0.133m 0.207m 6.619m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

ELEVATION AT GRIDLINE D (INTERMEDIATE COLUMNS)


NSCR-CP01-88-SS23-SD-D01-
8329
REV. 8 (18.04.2022)
GL 18-19 / D C1-73 #1 1 INTERMEDIATE COLUMN 130.00 kg 130.00 kg 0.133m 0.207m 3.366m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

GIRDER
NSCR-CP01-88-SS23-SD-D01-
8861
REV. 1 (18.04.2022)
GL 18-19 / A G29-230 1 GIRDER 982.98 kg 982.98 kg 0.193m 0.467m 9.625m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

BEAM
NSCR-CP01-88-SS23-SD-D01-
8862
REV. 1 (18.04.2022)
GL 18-19 / A-B B207-339-A 1 BEAM 156.11 kg 156.11 kg 0.146m 0.259m 4.662m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

NSCR-CP01-88-SS23-SD-D01-
8862
REV. 1 (18.04.2022)
GL 18-19 / A-B B208-339-A 1 BEAM 156.11 kg 156.11 kg 0.146m 0.259m 4.662m CP01-88-BL-IR-DPO-0295 2-May-22 For Delivery
REVISED AS PER N1-1100-CI-
ERS-210615-0666

28 GRAND TOTAL 12,094.99 kg

Prepared By: Checked By : Noted By:

G. B. Tonatos / R. E. Hidalgo R. M. Dimaala Glenda D. Encila-Gomez


PPC Engineer Sr. PPC PPC Head

FR-SFP-PP-03
DELIVERY LIST

Project Name : TDJV-NSCR DEPOT (WORKSHOP) Date Prepared: May 2, 2022


JO No. / WBS No.: 2088-02

Drawing / Revision LOCATION / DIMENSION DELIVERY SCHED


SHOPMARK QTY DESCRIPTION UNIT WEIGHT TOTAL WEIGHT CLIENT ACCEPTANCE REMARKS
No. GRIDLINE WIDTH HEIGHT LENGTH PLAN ACTUAL DR. NO.

STEEL MATTING @ SITE

STEEL PLATE 1 STEEL MATTING 1,025.71 kg 1,025.71 kg 1.829m 0.016m 4.465m 2-May-22 For Delivery

STEEL PLATE 1 STEEL MATTING 742.00 kg 742.00 kg 1.829m 0.016m 3.230m 2-May-22 For Delivery

STEEL PLATE 1 STEEL MATTING 738.56 kg 738.56 kg 1.829m 0.016m 3.215m 2-May-22 For Delivery

STEEL PLATE 1 STEEL MATTING 739.71 kg 739.71 kg 1.829m 0.016m 3.220m 2-May-22 For Delivery

4 GRAND TOTAL 3,245.98 kg

Prepared By: Checked By : Noted By:

G. B. Tonatos / R. E. Hidalgo R. M. Dimaala Glenda D. Encila-Gomez


PPC Engineer Sr. PPC PPC Head

FR-SFP-PP-03