Part Number: 135835-91100700 Engineering Manager/Manufacturing Engineer: Antonio Prepared by: A. Santoyo
Calderon/ Erik Gomez; Quality Manager/Quality Engineers:
Work Francisco Escoto/Jahir Zanella/Julio Ortiz/Sarahi Garcia;
Part Name: SHIELD Date (Oirginal) 19-Apr-22
Team: Production Supervisor/ Production Leader: Eduardo
Trigueros/Regina Flores; Storage Supervisor: Fabian Herrera;
Customer: DENSO TEN Limited Production Control Engineer: Adan Velazquez. Date (Rev) A. Calderon E. Gomez A. Santoyo
C
S L O D N S O D N
Responsible and Final Actions Done and Due
Process Step Failure Mode Effects E A Causes Actual Control - Prevention C Actual Control - Detection E P Recomended Action E C E P
Completion Dates Dates
V S U T R V U T R
E
"Visual
Bad appearance of raw Inspection receipt
Product out of specification for
material. (Bumps, rust, stains, 4 Poor supplier quality Supplier packaging standard 3 SM-QC-I-001 7 84 N/A
the customer.
scratches) Visual aid
SM-QC-A-006 "
Visual
Unlabeled supplier Suspected product 2 Poor supplier quality "Supplier Audits " 2 Raw Material Inspection label 7 28 N/A
SM-QC-F-023
"Identify the coil with bad Confusion when feeding the coil
"Inspection receipt
information on the label" in the press. 2 Lack of operator concentration 2 Visual 7 28 N/A
SM-QC-I-001 "
Inspection receipt
Wrong raw material label Delay in process 2 Lack of operator concentration 2 Visual 8 32 N/A
SM-QC-I-001
Visual
3.0
SM-MT-F-008
Raw material production Falling material Loss of raw material 4 Sling in poor condition Sling in poor condition 3 7 84 N/A
Check List of crane and tool
stock area
Inventory Controls
Material stored for more than Visual
Oxidation in the parts. 4 Poor inventory control STOCK TABLE 4 7 112 N/A
six months FIFO
SM-PD-F-012
4.0 Burr caused by damage to the Product with burrs outside Preventive maintenance program Preventive maintenance program
7 Lack of preventive maintenance 1 6 42 N/A
Stamping Process die specification SM-MT-F-007 SM-MT-F-007
1 / 15
C
S L O D N S O D N
Responsible and Final Actions Done and Due
Process Step Failure Mode Effects E A Causes Actual Control - Prevention C Actual Control - Detection E P Recomended Action E C E P
Completion Dates Dates
V S U T R V U T R
E
Insufficient visual inspection on Unsatisfactory appearance due Maintenance program. Die Register
5 Lack of maintenance of the die 4 6 120 N/A
appearance to marks or burrs SM-MT-F-001 SM-MT-F-007
6.0
Insufficient visual inspection on Unsatisfactory appearance due Maintenance program. Die Register
Production inspection 5 Lack of maintenance of the die 3 6 90 N/A
appearance to marks or burrs SM-MT-F-001 SM-MT-F-007
report
Insufficient visual inspection on Unsatisfactory appearance due Maintenance program. Die Register
5 Lack of maintenance of the die 3 6 90 N/A
appearance to marks or burrs SM-MT-F-001 SM-MT-F-007
2 / 15
C
S L O D N S O D N
Responsible and Final Actions Done and Due
Process Step Failure Mode Effects E A Causes Actual Control - Prevention C Actual Control - Detection E P Recomended Action E C E P
Completion Dates Dates
V S U T R V U T R
E
Packaging instruction
Product management deficiencies, Checklist of Checks
Incorrect packaging label Inventory problem 2 SM-QC-F-006 3 7 42 N/A
Operator error SM-PD-F-013
Training
Packaging instruction
Lack of label No material is received 3 Do not label material 3 Visual 8 72 N/A
SM-QC-F-006
3 / 15
C
S L O D N S O D N
Responsible and Final Actions Done and Due
Process Step Failure Mode Effects E A Causes Actual Control - Prevention C Actual Control - Detection E P Recomended Action E C E P
Completion Dates Dates
V S U T R V U T R
E
Visual Verification
11.0 Packaging instruction
Poor appearance of the box Damage to the product 3 wrong decision on box selection 3 Production Ispection 7 63 N/A
Stock Area SM-QC-F-006
SM-PD-F-009
Make decision of produce with 1. Use wrong measuring instrument. Work instruction Measurement Method.
Cotas outside dimension 5 2 6 60 N/A
unreliable data 2. Use incorrect measurement method SM-QC-I-060 "Exit Inspection Report
SM-QC-F-002"
The shipment inspection is not Deficiency of the release method, which causes confusion to Checklist of Checks
Sending of parts not inspected 5 Shipping release work instruction 2 6 60 N/A
carried out the operator SM-PD-F-013
12.0
Shipping &
Outgoing Quality Control
Visual Verification
Packaging instruction
Poor appearance of the box Damage to the product 3 wrong decision on box selection 3 Production Inspection 7 63 N/A
SM-QC-F-006
SM-PD-F-009
4 / 15
Detección Severidad Ocurrencia
Sistema Diseño Proceso Servicio
Máquinas Recursos
Humanos
Herramientas Tareas
Estaciones de Estaciones de
Trabajo trabajo.
Líneas de Líneas de
producción servicio
Procesos Servicios
E. Medición Desempeño
Capacitación Capacitación
Salidas
Personal /
Recursos Beneficios
Humanos
Máquina
Método
Material
Mediciones
Ambiente 2. AMEF de
Diseño
Salidas
Recursos
Humanos
Beneficios
Tareas
Estaciones de
trabajo.
Líneas de
servicio
Servicios 3. AMEF
Desempeño deProceso
Capacitación Salidas
Enfoque:
Minimizar las Beneficios
fallas de servicio
en la
organización
total.
Objetivo/Meta:
Maximizar la 4. AMEF de
satisfacción del Servicio
cliente a través
de calidad, Salidas
confiabilidad y
servicio
satisfacción del
cliente a través
de calidad,
confiabilidad y
servicio
Beneficios
Se usa para analizar sistemas y subsistemas en la etapa de concepto y diseño inicial. Un AMEF de
Sistema se enfoca en los modos potenciales de falla entre las funciones del sistema causadas por
deficiencias del sistema. Incluye las interacciones entre los sistemas y los elementos del sistema.
Una lista potencial para eliminar las causas de los modos de falla, reducir su ocurrencia, y mejorar la
detección de defectos si la capacidad (Cpk, Zbench) no puede ser mejorada
Identifica las deficiencias del proceso y ofrece un plan de acciones correctivas
Identifica las características críticas o significativas y ayuda a desarrollar los planes de control
Establece una prioridad de las acciones correctivas
Asiste en el análisis del proceso de manufactura o ensamble
Documenta las razones para los cambios
Se usa para analizar los servicios antes de que alcancen al cliente. Un AMEF de servicio se enfoca en
modos de falla (retrabajos, errores, equivocaciones) causadas por las deficiencias del sistema o
proceso
Una lista potencial de modos de falla ordenados por el NPR
Una lista potencial de tareas o procesos críticos o significativos
Una lista de procesos o tareas cuellos de botella
Una lista potencial para la eliminación de errores
Una lista potencial de funciones de monitoreo de sistema o proceso
Asiste en el análisis del flujo de trabajo
Asiste en el análisis del sistema o proceso
Identifica deficiencias en las tareas
Identifica tareas críticas o significativas y ayuda en el desarrollo de planes de control
Establece una prioridad para las acciones de mejora del diseño
Documenta las razones para los cambios
Guía de Severidad para AMEF de
Efecto Rango
No 1
Muy Ligero 2
Ligero 3
Menor 4
Moderado 5
Significativo 6
Mayor 7
Extremo 8
Serio 9
Peligroso 10
Muy Alta 2
Alta 3
Moderadamente 4
Alta
Media 5
Baja 6
Ligera 7
Muy Ligera 8
Remota 9
Casi imposible 10
veridad para AMEF de Proceso (escala cualitativa 1 - 10)
Criterios
Sin efecto en el producto o procesos subsecuentes
El Cliente muy probablemente no notará la falla. Efecto muy ligero en el desempeño
del producto / proceso. Falla no vital notada a veces
Cliente ligeramente molesto. Efecto ligero en el desempeño del producto o
proceso .Alguna falla no vital notada muchas veces
El Cliente experimenta una incomodidad menor. Efecto menor en el desempeño del
producto o proceso. La falla no requiere reparación. Falla no vital siempre notada