LIGHTING

OB LIGHT

12000

10000

10000

12000
ACPDB
4 - Ø26/32mm HDPE PIPE
PROPOSED
5 m 1*Ø110 PVC PIPE
5 m FOC
PROPOSED POWER
PD
B
SUPPLY CABINET
AC

AT EQUIPMENT PLATFORM

MTS
MCB
PROPOSED
RESREVED 20 m FOC DISTANCE SHALL NOT
OUTSIDE THE CABINET PROPOSED LESS THAN 700mm
CABLE TIE OR CLAMP FIXING 5 m 1*Ø26 / 32 HDPE PIPE
5 m FOC PROPOSED HANDHOLE
600*600*850 HH

RESERVED 3 Ø110 STEEL


PIPE, w/ 3mm THICKNESS
THE LENGTH OF THE MATERIAL CAN BE
S
MT

PROPOSED ADJUSTED ACCORDING TO THE ACTUAL SCENE


B

SITE LAYOUT
MC

5 m 1*Ø110 PVC PIPE


5 m FOC
THE LENGTH OF THE MATERIAL CAN BE
PROPOSED ADJUSTED ACCORDING TO THE ACTUAL SCENE

5 m 4*Ø26 / 32 HDPE PIPE


5 m FOC
HH
PROPOSED HANDHOLE PROPOSED GATEWAY
THE LENGTH OF THE MATERIAL CAN BE
600*600*850 ADJUSTED ACCORDING TO THE ACTUAL SCENE

PERSPECTIVE VIEW
PROPOSED POWER
SUPPLY CABINET

PROPOSED ACPDB
EQUIPMENT PLATFORM TO HANDHOLE
PROPOSED BUSBAR

PROPOSED
EQUIPMENT PLATFORM

PROPOSED
CABLE LADDER

750
Ø110 STEEL PIPE

NOTE:
1700

2000
WHERE THE PVC PIPE TURNS, IT NEEDS TO BE
ENCAPSULATED WITH THE MINIMUM 3000psi CONCRETE OF 100 100
OUTSIDE
INSIDE
AT LEAST 100mm THICK 200mm LONG AT BOTH ENDS IN THE
500
HORIZONTAL OR VERTICAL DIRECTION.
3
150

FGL +0.300 (MIN.)

200 100
700

300
550
400

NGL ±0.000
TOP OF ROADWAY

300

300
550
CONCRETE ENCASEMENT

250

700
110
500*500*550mm

850
Ø110 PVC PIPE

440
CONCRETE
ENCASEMENT 4 - Ø 26/32mm
HPDE PIPE CONCRETE
ENCASEMENT
800
600
550
OPENING
4MMTHHK
100 600 100
25

100
800
600
550
RISING SLOT
800

HANDHOLE COVER DETAIL


4-Ø25mm REINFORCING RIBS

3-Ø110mm STEEL PIPE


3mm THICKNESS
HANDHOLE TOP DETAIL PLAN

800 800
600
100 100 150 500 150
TOP OF ROADWAY
100

75

75
300

4-HPDE CONDUIT
195 195
Ø26/32mm
700
110

16Ø@200
850

850
150

Ø110mm PVC/STEEL PIPE


150

75
150 150 200 150 150 IRON SUMP FRAME
50

500
LEAN CONCRETE(75mm THK.)
16Ø@200

HANDHOLE DETAIL PLAN SECTION HANDHOLE DETAIL