You are on page 1of 16

To repair the leaks

4-
and refurbish the ZWL US$ Maintenance
Feb-
toilet for proper - - Manager
22
hyigiene.
 
To ensure that
materials are
stored according
17-
to the 5S ZWL US$ Maintenance
Feb-
requirements and - - Manager
22
to cleanup the oils
on the floor
periodically.

17- To remove the


ZWL US$ Maintenance
Feb- paints in this
- - Manager
22 room.

To properly label
17-
the food boxes ZWL US$ Maintenance
Feb-
and ensure they're - - Manager
22
always locked.
17-
To repaint the oil ZWL US$ Maintenance
Feb-
diptray - - Manager
22

Implement proper
17-
5S and ZWL US$ Maintenance
Feb-
Housekeeping in - - Manager
22
the machine shop.

17-
To repaint the ZWL US$ Maintenance
Feb-
walls - - Manager
22

17- To repaint the


ZWL US$ Maintenance
Feb- demarcations in
- - Manager
22 the machine shop
17- To repaint the
ZWL US$ Maintenance
Feb- walls in the
- - Manager
22 machine shop.

To remove the
dirty notices and
replace with
17-
current clean ZWL US$ Maintenance
Feb-
notices. To ensure - - Manager
22
continued updates
on the notice
boards.

17-
To paint the walls ZWL US$ Maintenance
Feb-
with whitewash. - - Manager
22

17-
To repaint the ZWL US$ Maintenance
Feb-
walls - - Manager
22
17- To reapply vanish
ZWL US$ Maintenance
Feb- on the reception
- - Manager
22 area doors.

17- To replace the


ZWL US$ Maintenance
Feb- wooden tiles with
- - Manager
22 ceramic tiles

To replace the
17-
damaged section ZWL US$ Maintenance
Feb-
of the reception - - Manager
22
area ceiling

To replace the
bond paper box
with a proper
17- Manpower
locable box ZWL US$
Feb- Services
similar to SHE - -
22 Manager
suggestion boxes
for reporting tip-
offs
To repaint pipe
17-
colour codes ZWL US$ Maintenance
Feb-
around the central - - Manager
22
stores area

To organize for
17- the removal of the
ZWL US$ Maintenance
Feb- waste metal from
- - Manager
22 the truck busting
area.

To remove the
17- affected top soil
ZWL US$ Maintenance
Feb- and dispose off as
- - Manager
22 hazardous waste
at the oil farm.
To have a
maintenance
schedule for the
gas cylinder
17- emergency
ZWL US$ Maintenance
Feb- sprinklers and
- - Manager
22 inspection
schedules
periodically. To
unblock the
blocked sections.
To corrently park
the generator
17-
trailer and remove ZWL US$ Maintenance
Feb-
all the metal - - Manager
22
meterials in the
trailer.

17-
Repaint the fence ZWL US$ Maintenance
Feb-
usig silver paint - - Manager
22
To remove the
benches and put
them in the
17-
salvage yard. To ZWL US$ Maintenance
Feb-
replace the - - Manager
22
benches with
proper benches
from the hall.

To remove the
17-
curbstones and put ZWL US$ Maintenance
Feb-
them in the - - Manager
22
scrapyard

17-
To label the food ZWL US$ Maintenance
Feb-
boxes. - - Manager
22

To identify the
usable food
17-
lockers and issue ZWL US$ Maintenance
Feb-
them to the - - Manager
22
departments in
need
17- Relocate the flux
ZWL US$ Maintenance
Feb- to a proper
- - Manager
22 holding area.

To remove the
17-
wheels and store ZWL US$ Maintenance
Feb-
them in the - - Manager
22
salvage yard

To construct a
17-
compliant ZWL US$ Maintenance
Feb-
bundwall for the - - Manager
22
oil decanting area.

To remove the
bolts under the
17-
food locker and ZWL US$ Maintenance
Feb-
ensure the area is - - Manager
22
kept clean all the
time.
To properly lock
17-
access to the ZWL US$ Maintenance
Feb-
compressed air - - Manager
22
valve

To remove the
notices and
17- replace with
ZWL US$ Maintenance
Feb- current notices.
- - Manager
22 Ensure the notice
board is always
updated.

17- To discard the


ZWL US$ Maintenance
Feb- worn out pressure
- - Manager
22 hose.

To come up with a
17- floor cleaning
ZWL US$ Maintenance
Feb- schedule and
- - Manager
22 clean the floors
periodically
To replace the
17-
worn out and ZWL US$ Maintenance
Feb-
damaged - - Manager
22
translucent sheets

To identify all
areas with
17- insecuure cables
ZWL US$ Maintenance
Feb- and insecure all
- - Manager
22 loose cabling in
the central offices
buildings

17- To identify all


ZWL US$ Maintenance
Feb- areas with cracks
- - Manager
22 and repair

Develop a drain
cleaning schedule
17-
and ensure ZWL US$ Maintenance
Feb-
inspection and - - Manager
22
cleaning is done
periodically.
To remove the
17- wooden tiles from
ZWL US$ Maintenance
Feb- the area and
- - Manager
22 dispose them
correctly.

17- To repaint the


ZWL US$ Maintenance
Feb- walls behind the
- - Manager
22 boardroom

To ensure all
17- electrical panels
ZWL US$ Maintenance
Feb- are properly
- - Manager
22 locked out and
sign posted

17- To repair all


ZWL US$ Maintenance
Feb- nonfunctional
- - Manager
22 lights
To clean the
17- trench and remove
ZWL US$ Maintenance
Feb- the mud to allow
- - Manager
22 for smooth flow of
water.

17- To put some


ZWL US$ Maintenance
Feb- barricade and
- - Manager
22 signage

17- To put a standard


ZWL US$ Maintenance
Feb- material for the
- - Manager
22 footbath

17-
To repain the dirty ZWL US$ Maintenance
Feb-
walls - - Manager
22
To remove the
17-
board and replace ZWL US$ Maintenance
Feb-
with a proper - - Manager
22
table.

To either extent
17- the rails to protect
ZWL US$ Maintenance
Feb- the drains or put
- - Manager
22 the grating to
cover drains

To remove the
17-
construction waste ZWL US$ Maintenance
Feb-
and dispose it - - Manager
22
correctly

To remove the
17- Manpower
paper waste or ZWL US$
Feb- Services
letters and dispose - -
22 Manager
correctly.
17-
To repaint the ZWL US$ Maintenance
Feb-
quarantine center - - Manager
22

17-
To repair the ZWL US$ Maintenance
Feb-
potholes - - Manager
22

17-
To extent the ZWL US$ Maintenance
Feb-
hump - - Manager
22

17-
To fill up the open ZWL US$ Maintenance
Feb-
section - - Manager
22
17-
To reline the fence ZWL US$ Maintenance
Feb-
and paint it. - - Manager
22

To resurface or
17-
repair the uneven ZWL US$ Maintenance
Feb-
surfaces on the - - Manager
22
road

17- To put brick


ZWL US$ Maintenance
Feb- dresser on the
- - Manager
22 maingate walls

To remove the
17- Manpower
lawn top soil from ZWL US$
Feb- Services
a vehicle - -
22 Manager
washbay.
To draw
17- demarcation lines
ZWL US$ Maintenance
Feb- for the proper
- - Manager
22 storage of the ax;e
stands and jacks.

17- To have a Manpower