You are on page 1of 7

Republic of Yemen ‫الجمهورية اليمنية‬

University of ‫جامعة العلوم والتكنولوجيا‬


Science & technology }‫كلية الحاسبات وتكنولوجيا المعلومات‬
Faculty of computing and information Final Exam
system System Analysis and Design
: ‫القسم‬
: ‫االسم‬
No Marks

1 1. Choose the correct answers: 20


1. …………… short, incremental development cycles, automated tests with Two-person
programming teams.
.‫ من المبرمجين‬2 ‫ فريقها يتكون من‬,‫ هي دورة تطوير تزايدية‬.1
a) Agile Methodologies.
b) Rapid Application Development.
c) SDLC.
d) eXtreme Programming.

2. ……………is a major outcome and deliverable from the PIP phase contains the best
estimate of a project’s scope, benefits, costs, risks, and resource requirements.
,‫ و مخاطره‬,‫ وتكاليفه‬,‫ ومنافعه‬,‫ هي اهم مخرجات مرحلة التخطيط واالنشاء وتحتوي افضل تقدير الطار المشروع‬.3
.‫وكذلك المصادر المطلوبة‬
a) BPP
b) SSR
c) Project charter
d) Work breakdown structure

4. …………… is a standard form for requesting or proposing systems development work


within an organization
.‫ هو نموذج معياري لطلب او اقتراح عمل تطويري في نظام ما داخل المؤسسة‬.4
a) BPP
b) SSR
c) Project charter
d) Work breakdown structure

5. …………… horizontal bars represent task durations, and time overlap.


.‫ وكذلك التداخل في االزمنة بين المهام‬,‫ اعمدة افقية تمثل مدة كل مهمة‬.5
a) ERD
b) Network diagram
c) PERT
d) Gantt chart

6. Projects identified by ……………. are cross functional, greater organizational change

1
and larger and riskier.
‫ كما انها تحدث‬,‫ مشاريع تخترق الحدود الوظيفية بين االقسام المختلفة‬.…………… ‫ المشاريع التي تعرفها‬.6
.‫تغييرا تنظيميا كبيرا ومخاطرها كبيرة‬
a) Top management.
b) Functional area.
c) Steering committee.
d) Development group.

7. …………….. is concerned with study of key stakeholders’ views of the proposed


system.
.‫هي دراسة وجهة نظر اصحاب المصلحة في النظام المقترح‬ ..…………… .7
a) Political feasibility.
b) Scheduling feasibility.
c) Legal and Contractual feasibility.
d) Operational feasibility.

8. …………….. Used to complement group meetings or as part of JAD effort


JAD ‫ تستخدم إلتمام المقابالت الجماعية او تستخدم كجزء من انشطة الـ‬..…………… .8
a) Prototyping .
b) Nominal Group Technique.
c) Observation.
d) Planning Game.

9. …………….. is the lowest logical level of DFD decomposition .


DFD‫ هو المستوى المنطقي االخير من تفكيك الـ‬.9
a) Level-0 diagram of DFD.
b) Primitive DFDs
c) Level-1 diagram
d) Context diagram

10. ERD is drawn in …………….. phase.


..…………… ‫ يتم انشاؤه في مرحلة‬ERD‫ نموذج الـ‬.10
a) planning.
b) analysis
c) design
d) implementation

10. Is a cost that associated with project start-up, initiation and development
‫ هي تكلفة تقترن بإنشاء المشروع والبدء والتطوير‬.8
a) One-Time Costs.
b) Schedule feasibility.
d) Time value of money (TVM).
c) Recurring costs.

11. …………….. is a passive document used solely for reading or viewing data.

2
.‫ هي وثيقة غير تفاعلية تستخدم حصريا لقراءة او استعراض البيانات فقط‬.11
a) Dialog.
b) Form.
c) Report.
d) Command line

12. One of the following is considered as a Modern Method for Determining


Requirements.
‫ احدى الطرق التالية تعتبر وسيلة حديثة لتحديد المتطلبات‬.12
a) Questionnaire
b) Observation
d) Prototyping
c) Interview

13. ……………… Division of project into manageable and logically ordered tasks and
subtasks.
‫ ……………… تقسيم المشروع إلى مهام ومهام فرعية يمكن إدارتها ومنطقية‬.13
a) Documentation
b) Scheduling Diagrams
d) Baseline Project Plan
c) Work Breakdown Structure (WBS)

14. …………….. is the longest phase in the SDLC.


a) Analysis.
b) Design.
c) Implementation.
d) Maintenance.

15. ………….. Is a planned undertaking of related activities to reach an objective that has a
beginning and an end.
.‫ هو مخطط لمجموعة من األنشطة المترابطة للوصول إلى هدف محدد و له بداية ونهاية‬.15
a) Planning
b) Analysis
d) Project
c) System

16. Practice of turning over some or all responsibility for information systems applications
and operations to another firm.
.‫ نقل بعض أو كل المسؤولية عن تطبيقات وعمليات نظم المعلومات إلى شركة أخرى‬.16
a) Designing
b) Implementation
c) Outsourcing
d) JAD

17. ………….. is the use of previously written software resources in new applications.

3
.‫ هو استخدام البرامج المكتوبة مسبقًا في تطبيقات جديدة‬.17
a) Reuse
b) Modularity
d) Coupling
c) Cohesion

18. ………….. Is a planned undertaking of related activities to reach an objective that has a
beginning and an end.
.‫ هو مخطط لمجموعة من األنشطة المترابطة للوصول إلى هدف محدد و له بداية ونهاية‬.18
a) Planning
b) Analysis
d) Project
c) System

19. ………….. Is a diagram that Show the start and completion dates for individual task.
.‫ هو رسم بياني يوضح تواريخ البدء واالنتهاء لمهمة فردية‬.4
a) PERT
b) Estimated Time
d) Gant Chart
c) Network Diagram

20. ………….. a method by which users interact with an information system.


.‫ وسيلة يتفاعل بها المستخدمون مع نظام معلومات‬..………… .20
a) DFD
b) Interface
d) Gant Chart
c) ERD

2 2. Differentiate between traditional methodologies and agile methodologies in(size of 8


project, dynamism, experts, culture of people).
)‫ ثقافة االشخاص‬,‫ الخبراء‬,‫ التغير‬,‫ والمنهجيات التقليدية} في( حجم المشروع‬Agile‫قارن بين منهجيات ال‬
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………

4
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
3. “Technical feasibility is a process of assessing the development organization’s ability
to construct a proposed system”. as a system analyst explain in detail how to study
technical feasibility of a project.
‫ كمحلل نظم اشرح بالتفصيل كيفية دراسة‬."‫"الجدوى الفنية هي عملية لتقييم قدرة المنظمة المطورة على بناء نظام مقترح‬
.‫الجدوى الفنية للمشروع‬
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
3 …………………………………………………………………………………………………… 8
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………

1. List 4 reasons to Outsource


……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
…………………………………………………………………………………………………… 4
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………

5
4. List the Traditional Methods for Determining Requirements.
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
5. Compare between the next terms:

1. Bottom-up projects and Top-Down projects.

……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
4 …………………………………………………………………………………………………… 8
a) Gant Chart Vs. Network Diagram
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………

5 6. Draw the context diagram and only the level 0 DFD for university registration system. Use 10
the next explanation:
Student come to the registration department to fill the enrollment request, if student is accepted
he / she will get the enrollment report, then student will get a list of offered courses that system
obtained from the academic department, student have to choose the courses he will study at the
current term. the system will supply the academic staff with information of registered students
in the beginning of the term and in the end of the term they will supply the system by the
marks of students. at the end student will get their marks from the system.

:‫ مستعينا بالشرح التالي‬.‫ لنظام التسجيل الجامعي‬DFD‫ارسم مخطط السياق و المستوى الصفري فقط للـ‬
‫ ثم‬، ‫ فسوف يحصل على تقرير االلتحاق‬، ‫ وإذا تم قبول الطالب‬، ‫يحضر الطالب إلى قسم التسجيل لملء طلب التسجيل‬
‫ وعلى الطالب اختيار الدورات‬، ‫سيحصل الطالب على قائمة بالمواد المتاحة التي حصل عليها النظام من القسم األكاديمي‬
‫ سيقوم النظام بتزويد أعضاء هيئة التدريس بمعلومات عن الطالب‬.‫التي سيقوم بدراستها خالل الفصل الدراسي الحالي‬

6
‫المسجلين في بداية الفصل الدراسي وفي نهاية الفصل الدراسي سيقوم اعضاء هيئة التدريس بتزويد النظام بدرجات‬
‫الطالب‪ .‬وفي النهاية سوف يحصل الطالب على درجاته من النظام‪.‬‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬
‫……………………………………………………………………………………………………‬

‫‪7‬‬