You are on page 1of 5

TAX317 – TAXATION 2

RUBRIC FOR GROUP PROJECT (15%)


CHAPTER: SALES TAX OR SERVICES TAX
CLO 3: Demonstrate skills in complying with various statutory legislations of Malaysian taxation
PLO 3: Display practical skills in accounting tasks for relevant organisations
PEO 2: Accounting technicians or administrators who practice functional work skills in relevant industries

NO 1 2 3 4
MEMBER’S NAME SITI NOR JIHAN BINTI
SALIH

STUDENT ID 2020881936
CLASS JAC1105G

PRACTICAL SKILLS EVALUATION FORM


NO 1 2 3 4
MEMBER’S NAME NURAIN AFIQAH BINTI NUR MILLATINA
KAMARULBAHARIN HUMAIRAH BINTI
GHAFFAR
PRACTICAL SKILLS Full Marks obtained
CRITERIA mark
s
1 Problem solving 50 50 50
2 Presentation of 10
written work of 10 10
the entire project
3 Level of 10
assistance 10 10
needed
4 Time 10
management & 10 10
task completion
5 Peer evaluation 20 20 20
TOTAL 100 100 100
Weightage 15%
PEER EVALUATION FORM

NAME OF EVALUATER:

STUDENT ID:

NO 1 2 3 4
MEMBER’S NAME

PEER EVALUATION Full Marks obtained


CRITERIA mark
s
1 Contribution 5
2 Time 5
management
3 Attitude 5
4 Teamwork 5
TOTAL 20
PRACTICAL Marks Assessment Level
SKILLS Allocate
CRITERIA d Poor Adequate Good Very Good Excellent
Problem 50 0 – 10 11 – 20 21 – 30 31 – 40 41 – 50
solving
(Refer to Unable to Able to Able to Able to Able to
scheme of demonstrate demonstrate demonstrate demonstrate demonstrate
answer) accurate solution solution but with solution but with accurate accurate and
to the major errors to the minor errors to solution but with excellent solution
requirements in requirements in the requirements little errors to to the
complying with complying with in complying with the requirements in
various statutory various statutory various statutory requirements in complying with
legislations of legislations of legislations of complying with various statutory
Malaysian taxation Malaysian Malaysian various legislations of
taxation taxation statutory Malaysian
legislations of taxation
Malaysian
taxation
Presentation of 10 0–2 3–4 5–6 7–8 9 – 10
written work
the entire The work is not The work is The work is The work is The work is
project structured, inadequately structured, structured, excellently
designed, structured, designed, designed, structured,
performed and designed, performed and performed and designed,
presented performed and presented presented performed and
throughout in a presented throughout but throughout in a presented
manner which is throughout in a with some flair in manner which is throughout in a
not entirely suited manner which is a manner which entirely suited manner which is
the presentation in entirely suited the is entirely suited the presentation entirely suited the
the work presentation in the presentation in the work presentation in
environment the work in the work environment the work
environment environment environment

Level of 10 0–2 3–4 5–6 7–8 9 – 10


assistance
needed Unable to Completed the Completed the Completed the Completed the
complete the project with project with project with little project without
project with significant moderate assistance assistance
assistance assistance assistance

Time 10 0-2 3–4 5-6 7-8 9 - 10


management &
task The project is not The project is The project is The project is The project is
completion submitted by due submitted by due submitted by due submitted by submitted before
time &/or not time & completed time & completed due time & due time &
completed with several minor with some minor completed completed
according to the amendments amendments. according to the beyond the
requirement. requirement. requirement.

Peer 20 Refer to peer evaluation rubric


evaluation
TOTAL 100

PEER Marks Assessment Level


EVALUATION Allocate Poor Adequate Good Very Good Excellent
CRITERIA d
Contribution 5 1 2 3 4 5

Poor contribution Adequate Good Very good Excellent


by team member contribution by contribution by contribution by contribution by
in completing the team member in team member in team member in team member in
project completing the completing the completing the completing the
project project project project
Time 5 1 2 3 4 5
management
Poor time Adequate time Good time Very good time Excellent time
management by management by management by management by management by
group member in group member in group member in group member group member in
completing the completing the completing the in completing completing the
project project project the project project

Attitude 5 1 2 3 4 5

Poor attitude by Adequate attitude Good attitude by Very good Excellent attitude
group member in by group member group member in attitude by by group member
completing the in completing the completing the group member in completing the
project project project in completing project
the project

Teamwork 5 1 3 3 4 5

Poor teamwork by Adequate Good teamwork Very good Excellent


group member in teamwork by by group teamwork by teamwork by
completing the group member in member in group member group member in
project completing the completing the in completing completing the
project project the project project

TOTAL 20

You might also like