You are on page 1of 2

what we offer

MERA ANGAN
DEVELOPMENT

CONSTRUCTION
We’ve earned a reputation for our
quality work and our integrity in
dealing with clients, architects,
suppliers and subcontractors. We
MARKETING work hard to earn your
satisfaction and respect

contact us
+917091397439
WWW.MERAANGAN.COM
2nd Floor , Manika Complex ,
Patel Nagar near Baba
Chowk , Patna-24
At MERA ANGAN, we believe there is Specification

Construction Detail
who more to value than just the lowest Particulars Luxury

price. That’s why we provide our Structure R . C. C. Frame

clients with the highest quality Walling 5" B.W.

Flooring(bedroom) 24" * 24" Vitrified Tiles


product for the most economical
Wall Paint(Interior) Wall putti
price.

we
Wall paint(Exterior) Weather coat
We provide the complete range of
Bathroom tiles 12" * 18" ( Up to 7 ' Height )
construction services to diverse
Bathroom CP Fittings ISI
industries, including commercial,
Kitchen Tiles 8" * 12"
industrial, institutional, and medical.
Kitchen top Black Granite
We can either work with your existing

are
ISI
Kitchen CP Fittings
plans or provide you with the Hard Wood
comprehensive Doorn Frame
Front Door Wiyh Hard Wood and Rest Door with Panel Door
design/build/marketing solution. Door Shutter
Aluminum with Iron Grill
Windows
S. S. Railing
Stairs
S. S. Railing
Railing

PAYMENT SCHEDULE FOR HOUSE


All Room
No Of AC Points Anchor
Wire Fill
UNIT COST = LAND COST + CONSTRUCTION COST
BOOKING AMOUNT @ 10% OF UNIT COST (NON REFUNDABLE)
WITHIN 15 DAYS FROM BOOKING 30% OF UNIT COST FOR AGREEMENT
WITHIN 90 DAYS FROM BOOKING 40 % OF THE UNIT COST (REGISTRY OF
THE PLOT WILL BE COMPLETE) CONSTRUCTION MATERIALS COMPANY
5% OF THE UNIT COST BEFORE PLINTH LEVEL NAMES
5% OF THE UNIT COST BEFORE GROUND FLOOR ROOF CASTING
1. CEMENT ULTRATECH
5% OF THE UNIT COST BEFORE 1ST FLOOR ROOF CASTING
5% OF UNIT COST AT BRICK WORKS & FINISHING 2. STEEL SHYAM STEEL

3. SANITRY FITTING JAGUAR

4. PLYWOOD CENTUARY 5.BRICKS FLY ASH BRICKS

6. CHIMNI BRICKS 1 NO.

NOTE 7. RAILLING SS RAILLING TOUGHEND GLASS

8. TILES VARMORA VERTIFIED

LAND REGISTRY COST EXTRA. 9. KICTHEN SLAB MARBLE GRANITTO


ALL DOCUMENTAION COST FROM AGREEMENT TO
10. WIRING RR CABEL
POSITION WILL BE CHARGE ON YOUR EXPENSES.
REGISTRY COST WILL BE ON ACTUAL BASIS.
11. SWITCHES ANCHOR
ALL LEGAL CLAIMS ARE IN PATNA JURIDICTION ONLY.
ALL THE NOC WILL BE SIGNED AFTER ALLOTMENT 12. POP
WITH THE DEVELOPMENT CHARGE.
SERVICE TAX WILL BE APPLICABLE AS PER GOVT. 13. ASIAN PAINT ASIAN WALL PUTTY
NORMS.
14. IRON GRILL FOR WINDOW
ELECRTICITY CONNECTION, MAINTENANCE &
GENERATOR CONNECTION WILL BE CHARGED ON 15. PVC DOORS
YOUR EXPENSES.
PRICES ARE SUBJECT TO REVISION AS DECIDED BY 16. FRENCH WINDOW
THE COMPANY FROM TIME TO TIME.

You might also like