You are on page 1of 12

LIMRA CONSTRUCTIONS : 7207 821 453

& : 6309 846 605

INTERIORS

(KHAIRATABAD)
CHENNAIS AMIRTA INTERNATIONAL INSTITUTE OF HOTEL MANAGEMENT
No.6-3- 636, Perika Bhavan, Circle, Raj Bhavan Rd, Anand Nagar Colony, Khairtabad, Hyderabad, Telangana 500004

This section
to be
separated
for partition
limraconstructions.interiors@gmail.com
LIMRA CONSTRUCTIONS : 7207 821 453
& : 6309 846 605

INTERIORS

PARTITION WORK (KHAIRTABAD CAMPUS)


SR. NO

REQUIREMENT SCOPE OF WORK AREA COSTING

DRESSING ROOM
· Crafting an Aluminium partition
Dressing Room Entry Partition 10ft x 4ft
1 · Comprising one hinged door (2.5ft), ensuring smooth Rs. 11,400/-
with one Door (Hinged) = 40sqft.
operation and a sturdy build.
· Making 2 Sliding Door partition to cover the Meter area
(Meter wiring & Meter). The Sliding Doors are made up of Rs. 4,025/-
Dressing Room, Meter Area Ply wood which Slide on G.I channels. 6.8ft X 4ft
2 +
(2 Sliding Door Partition) = 27.2sqft.
· Installing two knobs & two Lock patchs with two keys for Rs.430/-
accessing Meter areas. (Rs.430/-)

COLD KITCHEN
· Minor Electrical work required to either move the switch board and
3 Electrical Work making space for the Cold Kitchen Partition (OR) Install One separate Rs. 1420/-
Switch Boxes (Recommended).
· Crafting an Aluminum cum Glass Partition for a Cold
Cold Kitchen Compact
Kitchen 22.5ft x 10ft
4 Aluminium Partition Rs. 64,125/-
· Incorporating 5mm Glass Panes. = 225 sqft.
(No Door)
· Consist Novopan for Structural Support.
· Design
Cuttingof Partition
out a Door -way
Halfinglass
the half Novopan
Present with nowall
G.I Partition door.
to
access Cold Kitchen with grinder cutter.
A Cut out for Door way
· Crafting and Installing an Aluminium Frame with Sliding
Installation of Aluminium cum 4ft x 7ft =
5 Gear Door
Glass Door with Frame 28sft Rs.7980/-
· Door design : Half Glass and Half Novopan.
Function= · Sliding Door
· Paying attention to the Alignment and fit of the door to
ensure smooth operation and a snug closure.
· Engage gas line professionals to retrofit gas lines within the floor space,
ensuring safety and compliance with regulations, completing the task
Cutting Floor Slab to Retrofit
6 within the designated day. Rs. 2000/-
Steel Gas Pipe
· Welding the pipe joints securely to ensure Gas-tight connections and
safety.
· Paying attention to the finish of the floor around the pipe, seamlessly
HOUSE KEEPING: MODEL WASHROOM
Birla Pre-Fabricated sandwich panels 3inch. thick 11ft x 10ft
7 75mm Partition Rs. 27,500/-
Washroom Partition. These panels are waterproof. = 110ft

INCLUDES: Transportation, Loading/Unloading, Installation,


c Carriag to 2nd floor, Labour.
ISISISI marked standard materials used.
GRAND TOTAL: Rs. 118,880/- (Tax not included)
Do reach out us for Color selection and Design pattern for the above work.

limraconstructions.interiors@gmail.com
2nd Floor Kitchen Area layout
30' 3" 10'

ALUMINIUM PARTITION

COLD KITCHEN
22'-6"

CONSTRUCTIONS
LIMRA
PARTITION Retrofitting Gas line pipe in Floor

3'-0"

40'-0"

Cold Kitchen Access way


Door Installation face
FLOOR PLAN Please specify the position of Door
F scale: 1mm:50mm

02

CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS A 01


Girls Dressing Room

4'

CONSTRUCTIONS
LIMRA
2'-0"
PERSPECTIVE
METER ROOM
01

SLIDING DOOR x 2
(2' x 6.8')

11'
DRESSING ROOM

9’
2'-5"
ALUMINIUM PARTITION
4' x 10'
FLOOR PLAN
F SCALE: 1:20mm
01

CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS A 02


LIMRA CONSTRUCTIONS : 7207 821 453
& : 6309 846 605

INTERIORS

WORKING MODEL WASHROOM


Sr. No.

PARTICULARS DESCRIPTION AREA COSTING

Making and Installation of toughened glass


sliding door, including ISI marked hardwares
(9 x 3.5)ft
1 Toughened Glass Sliding Door and a lock patch with two keys. Grafting of Rs. 12500/-
= 31.5ft
false ceiling as necessary to accommodate the
installation of profile channels and sliding gear.
Sub Total Rs. 12,500/-
PREPARATION OF EXISTING G.I. PARTITION
2 Plastic Sheet Rs. 550/-
3 0.5mm Asbestos Sheet (11 x 5)ft Rs. 4675/-
4 Water Proofing (Dr. Fixit) = 55 sft Rs. 825/-
5 Tiling Rs. 3850/-
Sub Total Rs. 9,900/-
MASONRY WORK+ TILE WORK
6 6 Bag Cement & 1 Trolley sand 5 inch Platform under WC and Shower Area (7x4)ft = 28sqft Rs.5600/-
7 Floor Tiles + Installation (4 x 11)ft. = 44sqft Rs. 3,520/-
8 Window Wall Tiles + Installation (5ft. Height) (4 x 5)ft = 20sft Rs. 1600/-
9 New Partition Wall Tiles + Installation (5ft. Height) (11 x 5)ft = 55 sft Rs.4400/-
Sub Total Rs. 15,120/-
ELECTRICAL WORK
Gyser Connection, Exhaust, Wall Mount Fan, Switch board
10 Electrical Components (5 switches & 1 Three-Pin), Wiring, Profile Light Rs. 5860/-
INCLUDES: Installation of above and Complete electrical wiring work

Sub Total Rs. 5,860/-

limraconstructions.interiors@gmail.com
LIMRA CONSTRUCTIONS : 7207 821 453
& : 6309 846 605
INTERIORS
Sr. No.

PARTICULARS DESCRIPTION COSTING

PLUMBING WORK
Procured plumbing materials including PVC pipes, Fittings, Traps, Rs. 4332/-
Drainage Connection
11 and accessories, along with necessary tools like PVC Lubricant and (Reference
(Refer the Last page)
Solvent, as well as Roof nails for installation purposes. Table)
Sourced CPVC piping and fittings, including elbows, Ts, couplings,
and 45-degree connectors, along with brass elbows and necessary Rs. 3833/-
Water Inlet Connection
12 accessories such as solvent, dummy fittings, and clamps, (Reference
(Refer the Last page)
complemented with technol tape and appropriate nails for water Table)
inlet connections.
Bathroom attachments including mixer bent, jet gun with pipe, angle
cock, pillar cock, waste coupling, and various pipes, along with Rs. 3415/-
Final Attachments
13 necessary accessories like flanges, brackets, and extensions, (Reference
(Refer the Last page)
complemented with sealants and adhesives for installation and Table)
sealing purposes.
Curated final fittings for the bathroom, including a rain showerhead,
Rs. 16320/-
Final Fittings mixer, 2-in-1 tap set, wash basin, urinal, one-piece WC, geyser,
14 (Reference
(Refer the Last page) mirror with studs, towel bar, and waterproofing solution for
Table)
enhanced durability and aesthetics.
Plumbing work encompasses 2 Plumbers systematically
incorporating the proper drain system in the interior of the
bathroom and the exterior of the building.
Concealed (6) water inlet connections and installation of ceramic
15 Plumbing Rs. 18,000/-
fixtures : Western commode, sink, urinal and external fittings like
jet, shower head,mixer, pushcock, tap, waste pipes.
All inlet & outlet pipelines are concealed and done with Professional
Plumbers to avoid future blockages or leaks.
Sub Total Rs. 45,900/-
16 Transaportation, Loading-Unloading, Carriage to 1st Floor Rs. 2,500/-
Utilization of ISI Certified Materials with warranty and guaranteed on the respective bill.
Grand Total Rs. 91,780/-

limraconstructions.interiors@gmail.com
EXISTING
WOODEN
PARTITION

10'-0"
TILES

5'-0"
2'-9"

CONSTRUCTIONS
LIMRA
10"

2'-7 1/2" 2'-3" 2'-1" 4'-1 1/2"

11'-0"

BIRLA PARTITION
(4 x 11)ft

URINAL WASH BASIN


4'-0"

WATER
SHOWER
CLOSET

GLASS DOOR
BATHROOM FLOOR PLAN (3.5 x 7)ft
SCALE 1:25mm

CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS B 01


GLASS DOOR
(3.5 x 7)ft

0"
BATHROOM VIEWS BIRLA PARTITION

OLD WOODEN PARTITION

CONSTRUCTIONS
LIMRA
CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS B 02
OLD WOODEN PARTITION
AC UNIT

(4 x 11)ft
GLASS DOOR
(3.5 x 7)ft

BIRLA PARTITION
11ft x 10ft Height
PILLAR

GLASS PARTITION
GLASS DOOR BRICK WALL
(3.5 x 7)ft

GLASS PARTITION

CONSTRUCTIONS
GLASS DOOR
(3.5 x 7)ft

LIMRA
GLASS DOOR
GLASS PARTITION
FLOOR PLAN

FRONT VIEW

CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS B 03


OLD WOODEN PARTITION

GLASS DOOR
(3.5 x 7)ft

BIRLA PARTITION

BRICK WALL
11ft x 10ft Height

GLASS PARTITION
GLASS DOOR
(3.5 x 7)ft

GLASS PARTITION

GLASS DOOR
(3.5 x 7)ft

CONSTRUCTIONS
SUITE PERSPECTIVE TOP VIEW

LIMRA
BEDROOM PERSPECTIVE

CHENNAI AMIRTA, 500004 LIMRA CONSTRUCTIONS B 04


LIMRA CONSTRUCTIONS : 7207 821 453
& : 6309 846 605

INTERIORS

WORK COMPLETION SCHEDULE

Phase 1: Partition Work TIME REQUIRED


(i) Gas Line retrofitting in floor
Day 1 (ii) Door way cut out for Cold Kitchen 1 Day
(iii) Minor electrical Rearrangement
(i) Cold Kitchen Partition
(ii) Making & Installation of Sliding Door for Cold Kitchen
Day 2 1 Day
(iii) Dressing room Partition (With hinged Door)
(iv) Meter Sliding Partition

Phase 2: Working Model Washroom TIME REQUIRED


1 Removal of Glass Panel
1 Day
2 Installation Of Washroom Partition
3 Plumbing pipeline work
3 Days
4 Plumbing Drain work
5 Old Partition Preparation
1 Day
6 Electrical Lining Work
7 Masonry work (Time Required for Cement setting and curing)
4 Days
8 Tile Work (Time Required for Tile setting and curing)
9 Plumbing Final Fitting Installation
2 Days
10 Making & Installation of Toughened Glass Sliding Door

 The Above Phase 1 & Phase 2 work will be completed within 15 Days
(13 days + 2 days Grace period)
 Since Two days are required for setting & Curing of Cement to attain proper Cement
Masonry work

limraconstructions.interiors@gmail.com
REFERENCE TABLE DETAIL LIST OF ITEMS
No. Items Qty. Cost No. Items Qty. Cost
DRAINAGE CONNECTION FINAL ATTACHMENTS
1 4 inch PVC Pipe (10ft) 2 Rs. 594/- 1 Mixer bent 1 Rs. 275/-
2 4 inch PVC Double Socket (6ft)
2 Rs. 456/- 2 Jet Gun and Pipe 1 Rs. 330/-
4 inch PVC Pipe double
3 3 Angle cock 1 Rs. 220/-
socket (2ft) 3 Rs. 352/-
4 4/3 Nani Trap 2 Rs. 93/- 4 Pillar Cock 1 Rs. 357/-
5 4/3 Reducer 2 Rs. 77/- 5 PVC Connection 1 Rs. 90/-
6 4 inch Door Bent 2 Rs. 148/- 6 Waste Coupling 1 Rs. 187/-
7 4 Plain bent 4 Rs. 369/- 7 Waste Pipe 1 Rs. 33/-
8 4 inch 45 bent 6 Rs. 495/- 8 CP Flange 1 Rs. 8/-
9 4 inch door Y 3 Rs. 528/- 9 CP Tile drain 2 Rs. 866/-
10 4 inch Plain Y 4 Rs. 627/- 10 Wash Basin Bracket 1 Rs. 50/-
11 4 inch G.I Clamp 5 Rs. 35/- 11 Push cock 1 Rs. 294/
12 PVC Lubricant 200 gm Rs. 27/- 12 Urinal Waste Pipe 1 Rs. 52/-
Gyser Inlet Hot/Cold 1/2
13 13
PVC Solvent 500 ml Rs. 143/- inch (2 ft each) 1 pair Rs. 210/-
14 PVC 114 Pipe (10ft) 2 Rs..143/- 14 White Cement 2 kg Rs. 63/-
15 PVC 114 Elbow 5 Rs. 88/- 15 White M-seal 2 Rs. 84/-
CP Extension nipple 1
16 16
Roof nails 1/2 kg Rs. 27/- inch 7 Rs. 296/-
17 PVC 114 T 2 Rs. 130/- SUB TOTAL Rs. 3,415 /-
SUB TOTAL Rs. 4,332 /- FINAL FITTINGS
WATER INLET CONNECTIONS 1 Rain Showerhead 1 Rs. 650/-
1 3/4 CPVC Pipe (10ft) 8 Rs. 1986/- 2 Mixer 1 Rs. 1650/-
2 in 1 Tap(Alpha set) for
2 3
3/4 CPVC Elbow 22 Rs. 308/- commode 1 Rs. 620/-
3 3/4 T 10 Rs. 220/- 4 Wash basin 20 x 16 1 Rs. 850/-
4 3/4 Coupling 6 Rs. 57/- 5 Urinal 1 Rs. 900/-
One Piece WC (9 inch
5 6
3/4 45 7 Rs. 145/- centre) 1 Rs. 6000/-
6 3/4 0.5 inch brass elbow 12 Rs. 605/- 7 Gyser 3 litre 1 Rs. 3700/-
7 CPVC Solvent 118 2 Rs. 187/- 8 Mirror + 4 studs 1 Rs. 1200/-
8 PVC 1/2 inch dummy 12 Rs. 77/- 9 Towel Bar 1 Rs. 250/-
9 Technol Tape 10 Rs. 132/- 10 Dr. Fixit Pidiproof LW+ 5 ltr Rs. 500/-
10 China nails 2 inch 1 kg Rs. 90/- SUB TOTAL Rs. 16,320 /-
11 CPVC 3/4 Clamp 7 Rs. 26/- GRAND TOTAL Rs. 27,900/-
SUB TOTAL Rs. 3,833 /-