Item Description
Allow for Purchasing of MATERIALS to Site
A CONTAINER WORKS
Material Purchase, Fabrication cost 10ft High Cube Shipping Container
Cabin. (3.65m X 3.2m X 2.7m item 350000
Allow for cutting of doors and windows item 45,000
1.5ft x 3ft Window material frame no 25,500
6ft x 7ft Service/Show Window material frame no 85,000
3ft x 7ft Door material frame no 58,000
SUB-TOTAL =
B ALUMINIMUM FRAMING, INTERIOR CLADDING & INSULATION
Allow for Purchase of Aluminium Wall Track for Wall Frame and Partitions pcs 50
Allow for Purchase of Aluminium Stud and Angle Track item 15
Allow for Purchase on 8mm POP Boards for Internal Cladding no 9,500
Allow for POP screeding of board m² 2,500
Allow for Purchase of Materials and Accessories (Nails, Brackets, Joints etc) item 40,000
SUB-TOTAL =
C GLASS WORKS
Allow for purchase and installation of 10mm Glass length with aluminum
profile double galzing windows. (SHOW GLASS, VENTILATION WINDOWS
AND SERVICE HATCH) item 75000
Aluminium Framed Glass Security Doors no 130,000
SUB-TOTAL =
D ELECTRICAL WORKS AND FITTINGS
Purchase of 1 Distribution box, 1.5mm 2,5mm 6mm coil wires bundles item 45000
8 Led panel lamps , 4 Sockets , 2.5mm Gang Switches and other
Accessories item 30000
SUB-TOTAL =
E PLUMBING WORKS
Allow for Complete Supply of Pipework, Water suppy, Disribution and
Water Discharge item 45000
Supply and Install Stainless Steel Double Sink and Faucet item 115000
SUB-TOTAL =
E FLOORING WORKS
Allow for Purchase of approved 30 X 30 Vitrified tiles m² 6500
SUB-TOTAL =
F PAINTNG AND FINISHING WORKS
Allow for Purcase of Red Oxide for Container Rust Treatment gallon 6,500
Allow for Purchase of Approve type Gloss Paint and Satin Painting of
Exterior and Interior gallon 8,500
Painting Accesories and Material item 15,000
SUB-TOTAL =
EXTERNAL CLADDING WORKS
Allow for Purchase and Installation of 2 X 4 External Wood Framing pcs 800
Allow for Purchase and Installation of Approved Cladding
**** ALUMINIUM COMPOSITE PANELS (imported) m² 13500
SUB-TOTAL =
G LABOUR & LOGISTICS
1 350,000.00
1 45,000.00
2 51,000.00
1 85,000.00
1 58,000.00
589,000.00
1200 60,000.00
1100 16,500.00
2 71,000.00
15 142,500.00
15 37,500.00
1 40,000.00
367,500.00
2 150,000.00
1 130,000.00
280,000.00
1 45,000.00
1 30,000.00
75,000.00
1 45,000.00
1 115,000.00
160,000.00
6 39,000.00
39,000.00
3 19,500.00
3 25,500.00
1 15,000.00
60,000.00
35 28,000.00
10 135,000.00
163,000.00
OTAL = 450,000.00