REHABILITATION OF MUNDINDI REST HOUSE
TO COLLECTION 646,000.00
Roofing
Carpentry, joinery
Doors
Windows
TO COLLECTION 461,000.00
COLLECTION
Page 1 646,000.00
Page 2 461,000.00
Page 2
REHABILITATION OF MUNDINDI REST HOUSE
(All provisional)
Roof coverings
Roof drainage
Page 3
REHABILITATION OF MUNDINDI REST HOUSE
Wood work
5 8.00
Prime quality Mninga hardwood 3 x
Architrave; moulded
Ironmongery
E. 100 x 76 mm; Heavy duty stainless steel butt hinges 5 pairs 10,000 50,000.00
Page 4
REHABILITATION OF MUNDINDI REST HOUSE
TOTAL OF DOORS
TO SUMMARY 1,832,000.00
Casement windows
A.
750 x 1200mm glazed hardwood window casements;
40 x 70mm stiles; 2 middle and bottom rails; including
and infilled with mosquito gauze and wire mesh
4 No 84,000 336,000.00
Page 5
REHABILITATION OF MUNDINDI REST HOUSE
TOTAL OF WINDOWS
TO SUMMARY 1,220,000.00
Internal Works
Insitu finishing
Wall finish
In situ finishing's
External Finishings
Insitu Finishings
Page 6
REHABILITATION OF MUNDINDI REST HOUSE
TO COLLECTION 1,770,500.00
FINISHINGS ; (CONT'D)
Concrete Works
Precast concrete
TO COLLECTION 1,285,000.00
COLLECTION
Page 7
REHABILITATION OF MUNDINDI REST HOUSE
Page 6 1,770,500.00
Page 7 1,285,000.00
TOTAL OF FINISHING
TO SUMMARY 3,055,500.00
Wood surfaces
Page 8
REHABILITATION OF MUNDINDI REST HOUSE
General surfaces
(All provisional)
C.
Bulkhead fittings complete with tube light as Philips 4 No. 8,000 32,000.00
D.
6A one gang one way switch; flush mounted as ABB
complete with moulded box 5 No. 6,000 30,000.00
E.
6A two gang one way switch; flush mounted as ABB
complete with moulded box 3 No. 8,000 24,000.00
Page 9
REHABILITATION OF MUNDINDI REST HOUSE
POWER INSTALLATION
TO COLLECTION 452,800.00
TO COLLECTION 600,000.00
COLLECTION
Page 10 452,800.00
Page 11 600,000.00
Page 10
REHABILITATION OF MUNDINDI REST HOUSE
SUMMARY
Page 11
REHABILITATION OF MUNDINDI REST HOUSE
Page 12